X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364082911000

Well Details

Well ID: 0364082911000
Loading map...
Location: 00/11-29-036-08W4/0
Location Alias: 00/11-29-36-08 W4M
Location Alias 2: 00/11-29-036-08 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 08
Section: 29
County/Municipality: Special Areas No. 4
Well Name: FCPI PROVOST 11-29-36-8
Operator Name: Crescent Point Energy Corp.
License Number: 0139160
License Date: 1989-03-08
License Status: RecCertified
Spud Date: 1989-03-10
Final Drill Date: 1989-03-14
Well Total Depth: 1068.00 m
Surface Hole Latitude: 52.122915
Surface Hole Longitude: -111.114805

For data sources see[1][2]

Well History

Date Event
1989-03-08 Obtained License
1989-03-11 Surface Casing Operation Performed
1989-03-14 Finished Drilling
1989-03-14 Well Log Performed
1989-03-14 Well Mode changed to Drilled and Cased
1989-03-15 Drill Stem Test Performed
1989-03-16 Production Casing Operation Performed
1989-03-16 Rig Released
1989-04-14 Perforation Treatment Performed - Jet Perforation
1989-04-14 Well Log Performed
1989-06-07 Well Began Production
1989-06-07 Well Fluid changed to Crude Oil
1989-06-07 Well Mode changed to Pumping
1989-12-19 Well Fluid changed to Crude Oil
1989-12-19 Well Mode changed to Suspended
1990-04-30 Well Log Performed
1990-05-02 Perforation Treatment Performed - Cement Squeeze
1990-05-04 Perforation Treatment Performed - Jet Perforation
1990-05-04 Well Log Performed
1990-05-05 Well Fluid changed to Crude Oil
1990-05-05 Well Mode changed to Pumping
1994-11-01 Well Fluid changed to Crude Oil
1994-11-01 Well Mode changed to Suspended
1996-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-14 Plug Back Performed
1996-07-14 Well Log Performed
1996-08-01 Well Abandoned
1996-08-01 Well Fluid changed to Crude Oil
1996-08-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-04-14 Perforation 1031.50 1035.00 13
1990-05-02 Cement Squeeze 1031.50 1035.00 0
1990-05-04 Perforation 1031.50 1032.70 13
1996-07-14 Packing Device Capped w/Cement 1017.00 1025.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 4248 0.0 0.0 0.0
1990 5235 0.0 0.0 0.0
1991 8314 0.0 0.0 0.0
1992 8537 0.0 0.0 0.0
1993 8379 0.0 0.0 0.0
1994 5480 0.0 0.0 0.0

For data sources see[5]

References