X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-129-20227"

m
m
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-129-20227
 
| Well ID: 34-129-20227
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.61729191, -82.94809847 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.61, -82.94 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Pickaway County, Ohio|Pickaway]]
+
| Country: United States
 +
|-
 +
| State: Ohio
 +
|-
 +
| County: <County>
 
|-
 
|-
 
| Municipality:  
 
| Municipality:  
Line 13: Line 17:
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: NORPOTH
 
|-
 
|-
| First Permit Date:  
+
| License Status: Final Restoration
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 2009-07-08
 
|-
 
|-
 
| Spud Date: 2009-08-10
 
| Spud Date: 2009-08-10
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[BOWMAN DRILLING]]
 +
|-
 +
| Final Drill Date: 2009-08-18
 +
|-
 +
| Well Total Depth: 2695.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Final Restoration
+
| Latitude: 39.610000
 +
|-
 +
| Longitude: -82.940000
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| APP
 +
| 2009-07-08
 +
| Proposed Formations:TRENTON/ROSE RUN, Issued Date:7/8/2009, Expired Date:7/8/2010 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
 
|-
 
|-
| Violations: 0
+
| Reached Total Depth
 +
| 2009-08-18
 +
 
|-
 
|-
| Latitude: 39.61729191
+
| Plugged/Abandoned
 +
| 2009-09-22
 +
 
|-
 
|-
| Longitude: -82.94809847
+
| Completion Report Received
 +
| 2009-10-06
 +
 +
|-
 +
| Construction Permit Expires
 +
| 2010-07-08
 +
 +
|-
 +
| Record Last Modified
 +
| 2013-03-14
 +
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<!--== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 +
|-
 +
|}-->
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
<!--== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
|}-->
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 +
<!--== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION COMMENT
 
 
|-
 
|-
 
| -1121015738
 
| -1121015738
| 2009-08-19
+
| 2009-8-19 0:00:
 +
| DD
 +
| No Violations
 
|  
 
|  
| #NAME?
+
|-
 +
| -160179624
 +
| 2009-8-17 0:00:
 +
| DD
 +
| No Violations
 
|  
 
|  
 +
|-
 +
| -506748691
 +
| 2010-5-20 0:00:
 +
| FR
 +
| No Violations
 
|  
 
|  
 +
|-
 +
| -698268271
 +
| 2009-9-22 0:00:
 +
| PB
 +
| No Violations
 
|  
 
|  
 
|-
 
|-
 +
| 0160179624
 +
| 2009-08-17
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| - Drilling progress, Rig operating while on site, expect to hit target zone tomorrow morning.
 +
|-
 +
| 0506748691
 +
| 2010-05-20
 +
| Final Restoration
 +
| No Violations
 +
| Final Restoration, well permitted 7/08/2009 well plugged and abandon 9/22/2009.
 +
- Area has been graded and vegetation has started to establish.
 +
|-
 +
| 0657246874
 +
| 2009-08-13
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| - On site for drilling progress, operator has conductor set and Formation Cementing, cementing conductor in place. Cement circulated to surface. 14.75 inch hole drilled, 9.625 inch conductor casing total of 206 feet of conductor.
 +
|-
 +
| 0698268271
 +
| 2009-09-22
 +
| Plug / Plug Back
 +
| No Violations
 +
| - Plugging well, Berry Well Service and Formation Cementing doing the work.
 +
- 2 3/8 inch tubing place into well bore for setting plugs, 4 plugs set, Rose Run, Trenton, Base of the surface casing and surface. Good circulation when cement was pumped in to well. A total of 115 sacks of cement used.
 +
|-
 +
| 1121015738
 +
| 2009-08-19
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| - Drilling contactor Dow Bowman has started to rig down, Air pit has been closed, fluid pit to remain open until well is plugged. Operator has safety fence around fluid pit to restrict access.
 
|-
 
|-
 
| 1164310803
 
| 1164310803
 
| 2009-08-14
 
| 2009-08-14
|  
+
| Drill / Deepen /  Reopen
| - On location for surface casing, 8.75 inch hole drilled. 7 inch casing, casing is used, total length of casing 842' plus 10' landing joint. Good circulation, cement circulated to surface. Formation Cementing done cementing. 142 sacks with 3% CaCl.
+
| No Violations
|
+
| - On location for surface casing, 8.75 inch hole drilled. 7 inch casing, casing is used, total length of casing 842 plus 10 landing joint. Good circulation, cement circulated to surface. Formation Cementing done cementing. 142 sacks with 3% CaCl.
|
 
|
 
|-
 
 
|-
 
|-
 
| 1183347065
 
| 1183347065
 
| 2009-08-18
 
| 2009-08-18
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| - On location for drilling progress. Drilling has stopped, dry hole total depth 2696 feet,
 
| - On location for drilling progress. Drilling has stopped, dry hole total depth 2696 feet,
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1249928594
 
| 1249928594
 
| 2009-07-29
 
| 2009-07-29
|  
+
| Not Drilled
 +
| No Violations
 
| - 7/25/09 received phone call from operator that construction of lease road, drill area site clear of soybeans and mark pit location will start on 7/28/2009.
 
| - 7/25/09 received phone call from operator that construction of lease road, drill area site clear of soybeans and mark pit location will start on 7/28/2009.
- 7/29/2009 on site for inspection, operator has partly graded and stoned lease road from origina
+
- 7/29/2009 on site for inspection, operator has partly graded and stoned lease road from original access drive to drill location.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1251722653
 
| 1251722653
 
| 2009-08-12
 
| 2009-08-12
|  
+
| Drill / Deepen /  Reopen
| - On location for drilling progress, Drilling contactor having problem with setting conductor pipe, depth of hole 198'
+
| No Violations
|
+
| - On location for drilling progress, Drilling contactor having problem with setting conductor pipe, depth of hole 198
|
 
|
 
|-
 
|-
 
| -160179624
 
| 2009-08-17
 
|
 
| #NAME?
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1616236048
 
| 1616236048
 
| 2009-08-10
 
| 2009-08-10
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| - Operator had contacted in advance that drill was going to be on location 8/10/2009 and set to set up.
 
| - Operator had contacted in advance that drill was going to be on location 8/10/2009 and set to set up.
 
- on site drill and drilling equipment setup, pit being dug while on site.  
 
- on site drill and drilling equipment setup, pit being dug while on site.  
 
- signs are posted on location, porta potty on location for drill crew.
 
- signs are posted on location, porta potty on location for drill crew.
- D
+
- Drilling started in PM
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2119370411
 
| 2119370411
 
| 2009-08-06
 
| 2009-08-06
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| - 8/04/2009 received phone call from operator that construction of lease road was completed, drill area site clear of soybeans.
 
| - 8/04/2009 received phone call from operator that construction of lease road was completed, drill area site clear of soybeans.
- 8/06/2009 on site for inspection, operator has graded and stoned lease road from original access drive to drill location. Ope
+
- 8/06/2009 on site for inspection, operator has graded and stoned lease road from original access drive to drill location. Operator has installed orange safety fence to restrict access and form parking/turn around area.
|
 
|
 
|
 
|-
 
|-
 
| -506748691
 
| 2010-05-20
 
|
 
| Final Restoration, well permitted 7/08/2009 well plugged and abandon 9/22/2009.
 
- Area has been graded and vegetation has started to establish.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 657246874
 
| 657246874
| 2009-08-13
+
| 2009-8-13 0:00:
|  
+
| DD
| - On site for drilling progress, operator has conductor set and Formation Cementing, cementing conductor in place. Cement circulated to surface. 14.75 inch hole drilled, 9.625 inch conductor casing total of 206 feet of conductor.
+
| No Violations
|
 
|
 
 
|  
 
|  
 
|-
 
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 
|-
 
|-
| -698268271
+
|}-->
| 2009-09-22
 
|
 
| - Plugging well, Berry Well Service and Formation Cementing doing the work.
 
- 2 3/8 inch tubing place into well bore for setting plugs, 4 plugs set, Rose Run, Trenton, Base of the surface casing and surface. Good circulation when cement was pumped in to w
 
|
 
|
 
|
 
|-
 
|}
 
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2020-11-16
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Latest revision as of 20:19, 12 January 2021

Well Details

Well ID: 34-129-20227
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: OHIO ENERGY ASSETS, INC.
Well Pad ID:
Farm/Lease Name: NORPOTH
License Status: Final Restoration
License Date: 2009-07-08
Spud Date: 2009-08-10
Spud Drilling Contractor: BOWMAN DRILLING
Final Drill Date: 2009-08-18
Well Total Depth: 2695.00 ft
Configuration: Vertical
Latitude: 39.610000
Longitude: -82.940000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2009-07-08 Proposed Formations:TRENTON/ROSE RUN, Issued Date:7/8/2009, Expired Date:7/8/2010 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2009-08-18
Plugged/Abandoned 2009-09-22
Completion Report Received 2009-10-06
Construction Permit Expires 2010-07-08
Record Last Modified 2013-03-14

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1121015738 2009-8-19 0:00: DD No Violations
-160179624 2009-8-17 0:00: DD No Violations
-506748691 2010-5-20 0:00: FR No Violations
-698268271 2009-9-22 0:00: PB No Violations
0160179624 2009-08-17 Drill / Deepen / Reopen No Violations - Drilling progress, Rig operating while on site, expect to hit target zone tomorrow morning.
0506748691 2010-05-20 Final Restoration No Violations Final Restoration, well permitted 7/08/2009 well plugged and abandon 9/22/2009.

- Area has been graded and vegetation has started to establish.

0657246874 2009-08-13 Drill / Deepen / Reopen No Violations - On site for drilling progress, operator has conductor set and Formation Cementing, cementing conductor in place. Cement circulated to surface. 14.75 inch hole drilled, 9.625 inch conductor casing total of 206 feet of conductor.
0698268271 2009-09-22 Plug / Plug Back No Violations - Plugging well, Berry Well Service and Formation Cementing doing the work.

- 2 3/8 inch tubing place into well bore for setting plugs, 4 plugs set, Rose Run, Trenton, Base of the surface casing and surface. Good circulation when cement was pumped in to well. A total of 115 sacks of cement used.

1121015738 2009-08-19 Drill / Deepen / Reopen No Violations - Drilling contactor Dow Bowman has started to rig down, Air pit has been closed, fluid pit to remain open until well is plugged. Operator has safety fence around fluid pit to restrict access.
1164310803 2009-08-14 Drill / Deepen / Reopen No Violations - On location for surface casing, 8.75 inch hole drilled. 7 inch casing, casing is used, total length of casing 842 plus 10 landing joint. Good circulation, cement circulated to surface. Formation Cementing done cementing. 142 sacks with 3% CaCl.
1183347065 2009-08-18 Drill / Deepen / Reopen No Violations - On location for drilling progress. Drilling has stopped, dry hole total depth 2696 feet,
1249928594 2009-07-29 Not Drilled No Violations - 7/25/09 received phone call from operator that construction of lease road, drill area site clear of soybeans and mark pit location will start on 7/28/2009.

- 7/29/2009 on site for inspection, operator has partly graded and stoned lease road from original access drive to drill location.

1251722653 2009-08-12 Drill / Deepen / Reopen No Violations - On location for drilling progress, Drilling contactor having problem with setting conductor pipe, depth of hole 198
1616236048 2009-08-10 Drill / Deepen / Reopen No Violations - Operator had contacted in advance that drill was going to be on location 8/10/2009 and set to set up.

- on site drill and drilling equipment setup, pit being dug while on site. - signs are posted on location, porta potty on location for drill crew. - Drilling started in PM

2119370411 2009-08-06 Drill / Deepen / Reopen No Violations - 8/04/2009 received phone call from operator that construction of lease road was completed, drill area site clear of soybeans.

- 8/06/2009 on site for inspection, operator has graded and stoned lease road from original access drive to drill location. Operator has installed orange safety fence to restrict access and form parking/turn around area.

657246874 2009-8-13 0:00: DD No Violations

For data sources see[3]

References