X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-119-27359"

m
m
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-119-27359
 
| Well ID: 34-119-27359
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.841687812, -81.87401391 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.84, -81.87 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 11: Line 11:
 
| County: [[Muskingum_County,_Ohio|Muskingum]]
 
| County: [[Muskingum_County,_Ohio|Muskingum]]
 
|-
 
|-
| Municipality: [[Blue rock,_Muskingum_County,_Ohio|Blue rock]]
+
| Municipality: [[Blue Rock_Township,_Muskingum_County,_Ohio|Blue Rock Township]]
 
|-
 
|-
 
| Operator Name: [[VICTOR MCKENZIE DRILLING CO  I]]
 
| Operator Name: [[VICTOR MCKENZIE DRILLING CO  I]]
Line 29: Line 29:
 
| Final Drill Date: 1986-01-17
 
| Final Drill Date: 1986-01-17
 
|-
 
|-
| Well Total Depth: 4552 ft
+
| Well Total Depth: 4552.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Latitude: 39.841687812
+
| Latitude: 39.840000
 
|-
 
|-
| Longitude: -81.87401391
+
| Longitude: -81.870000
 
|}
 
|}
For data sources see<ref name=RBDMS>{{cite web
+
For data sources see<ref>{{cite web
  | title = RBDMS
+
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| CO
 +
| 1985-11-13
 +
| 281  McKENZIE VICTOR DRILL INC  GeoDate  11/13/85
 +
|-
 +
| Oil and Gas
 +
| 1985-11-13
 +
| Issued Date 11/13/85 Expired Date 11/13/86 Acres 0040000 Tool Type CT Proposed Formation CLINTON Proposed Depth 04552 Proposed Drill Depth 04552
 +
|-
 +
| Original Spud
 +
| 1985-11-15
 +
|
 +
|-
 +
| Completed
 +
| 1986-01-17
 +
|
 +
|-
 +
| Reached Total Depth
 +
| 1986-01-17
 +
|
 +
|-
 +
| Completion Report Received
 +
| 1986-01-27
 +
|
 +
|-
 +
| Construction Permit Expires
 +
| 1986-11-13
 +
|
 +
|-
 +
| Record Last Modified
 +
| 2015-09-24
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
{| class="wikitable sortable" style="width: 50%"
+
{| class="wikitable sortable" width="95%"
 
!scope="col" style="text-align: center"| Perforation Date
 
!scope="col" style="text-align: center"| Perforation Date
 
!scope="col" style="text-align: center"| Interval Top (ft)
 
!scope="col" style="text-align: center"| Interval Top (ft)
Line 51: Line 96:
 
|-
 
|-
 
| 1997-06-29
 
| 1997-06-29
 +
| style="text-align: right;" | 4405
 +
| style="text-align: right;" | 4445
 +
| style="text-align: right;" | 0
 +
|-
 +
|
 +
| style="text-align: right;" | 4405
 +
| style="text-align: right;" | 4445
 +
| style="text-align: right;" | 0
 +
|-
 +
|
 
| style="text-align: right;" | 4405
 
| style="text-align: right;" | 4405
 
| style="text-align: right;" | 4445
 
| style="text-align: right;" | 4445
Line 56: Line 111:
 
|-
 
|-
 
|}
 
|}
For data sources see<ref name = RBDMS/>
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
|
 +
|
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|
 +
| FRAC;H2O,SAND
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 67: Line 176:
 
| 1991
 
| 1991
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 955
+
| style="text-align: right;" | 955.00
| style="text-align: right;" | 442
+
| style="text-align: right;" | 442.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1993
 
| 1993
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 2009
+
| style="text-align: right;" | 2009.00
| style="text-align: right;" | 385
+
| style="text-align: right;" | 385.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 1994
 
| 1994
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 2419
+
| style="text-align: right;" | 2419.00
| style="text-align: right;" | 202
+
| style="text-align: right;" | 202.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 1995
 
| 1995
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 2428
+
| style="text-align: right;" | 2428.00
| style="text-align: right;" | 306
+
| style="text-align: right;" | 306.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 1216
+
| style="text-align: right;" | 1216.00
| style="text-align: right;" | 134
+
| style="text-align: right;" | 134.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 413
+
| style="text-align: right;" | 413.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 1063
+
| style="text-align: right;" | 1063.00
| style="text-align: right;" | 145
+
| style="text-align: right;" | 145.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 918
+
| style="text-align: right;" | 918.00
| style="text-align: right;" | 299
+
| style="text-align: right;" | 299.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 639
+
| style="text-align: right;" | 639.00
| style="text-align: right;" | 328
+
| style="text-align: right;" | 328.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 600
+
| style="text-align: right;" | 600.00
| style="text-align: right;" | 236
+
| style="text-align: right;" | 236.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 250
+
| style="text-align: right;" | 250.00
| style="text-align: right;" | 2914
+
| style="text-align: right;" | 2914.00
 
| style="text-align: right;" | 360
 
| style="text-align: right;" | 360
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 480
+
| style="text-align: right;" | 480.00
| style="text-align: right;" | 253
+
| style="text-align: right;" | 253.00
 
| style="text-align: right;" | 300
 
| style="text-align: right;" | 300
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 561
+
| style="text-align: right;" | 561.00
| style="text-align: right;" | 221
+
| style="text-align: right;" | 221.00
 
| style="text-align: right;" | 180
 
| style="text-align: right;" | 180
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 315
+
| style="text-align: right;" | 315.00
 
| style="text-align: right;" | 300
 
| style="text-align: right;" | 300
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 181
+
| style="text-align: right;" | 181.00
| style="text-align: right;" | 195
+
| style="text-align: right;" | 195.00
 
| style="text-align: right;" | 200
 
| style="text-align: right;" | 200
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 304
+
| style="text-align: right;" | 304.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 34
+
| style="text-align: right;" | 34.00
| style="text-align: right;" | 376
+
| style="text-align: right;" | 376.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 368
+
| style="text-align: right;" | 368.00
| style="text-align: right;" | 357
+
| style="text-align: right;" | 357.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 232
+
| style="text-align: right;" | 232.00
| style="text-align: right;" | 330
+
| style="text-align: right;" | 330.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 232
+
| style="text-align: right;" | 232.00
| style="text-align: right;" | 331
+
| style="text-align: right;" | 331.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 319
+
| style="text-align: right;" | 319.00
| style="text-align: right;" | 298
+
| style="text-align: right;" | 298.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 285
+
| style="text-align: right;" | 285.00
| style="text-align: right;" | 469
+
| style="text-align: right;" | 469.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 350
+
| style="text-align: right;" | 350.00
| style="text-align: right;" | 304
+
| style="text-align: right;" | 304.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 350
+
| style="text-align: right;" | 350.00
| style="text-align: right;" | 304
+
| style="text-align: right;" | 304.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 660
+
| style="text-align: right;" | 660.00
| style="text-align: right;" | 538
+
| style="text-align: right;" | 538.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
 
| [[VICTOR MCKENZIE DRILLING CO  I]]
| style="text-align: right;" | 1753
+
| style="text-align: right;" | 1753.00
| style="text-align: right;" | 1289
+
| style="text-align: right;" | 1289.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
|}
 
|}
For data sources see<ref name=RBDMS/><ref name = Annual_Prod>{{cite web
+
For data sources see<ref>{{cite web
  | title = Ohio Combined Annual Production Data
+
| title = Risk Based Data Management System - Production Table - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<ref>{{cite web
 +
  | title = Combined Production - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable"
 
{| class="wikitable sortable"
Line 393: Line 508:
 
|-
 
|-
 
|}
 
|}
For data sources see<ref name=RBDMS/><ref name=Annual_Prod/>
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
==== Inspections Performed ====
 
==== Inspections Performed ====
Line 402: Line 528:
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Comments
 
!scope="col" style="text-align: center"| Inspection Comments
 +
|-
 +
| -1496157859
 +
| 2009-12-9 0:00:
 +
| PW
 +
| No Violations
 +
|
 +
|-
 +
| -56688867
 +
| 2004-12-7 0:00:
 +
| PW
 +
| No Violations
 +
|
 
|-
 
|-
 
| 0000PL7996
 
| 0000PL7996
Line 426: Line 564:
 
| No Violations
 
| No Violations
 
| Producing, no problems noted.
 
| Producing, no problems noted.
 +
|-
 +
| 271911973
 +
| 2008-3-24 0:00:
 +
| PW
 +
| No Violations
 +
|
 +
|-
 +
| PL7996
 +
|
 +
| PL
 +
| No Violations
 +
|
 
|-
 
|-
 
|}
 
|}
Line 437: Line 587:
 
|-
 
|-
 
|}-->
 
|}-->
For data sources see<ref name=RBDMS/>
+
For data sources see<ref>{{cite web
<!--== Fracking Activities ==
+
| title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
==== Fracking Jobs ====
+
|publisher = [[Ohio Department of Natural Resources]]
{| class="wikitable sortable" width="95%"
+
| date = 2020-11-16
!scope="col" style="text-align: center"| Job Number
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
!scope="col" style="text-align: center"| Job Start Date
+
| accessdate = 2020-11-16 }}</ref>
!scope="col" style="text-align: center"| Job End Date
 
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 
!scope="col" style="text-align: center"| Total Water Volume (gal)
 
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" style="width: 100%"
 
!scope="col" style="text-align: center"| Job Number
 
!scope="col" style="text-align: center"| Trade Name
 
!scope="col" style="text-align: center"| Supplier
 
!scope="col" style="text-align: center"| Purpose
 
!scope="col" style="text-align: center"| Ingredient Name
 
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 
!scope="col" style="text-align: center"| Additive Percentage by Mass
 
!scope="col" style="text-align: center"| Job Percentage by Mass
 
!scope="col" style="text-align: center"| Mass Used (lb)
 
|-
 
|}-->
 
 
 
== Stimulations Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" style="text-align: center"| Stimulation Date
 
!scope="col" style="text-align: center"| Chemical Agent
 
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 
!scope="col" style="text-align: center"| Fracking Fluid Volume
 
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 
!scope="col" style="text-align: center"| Fracking Company
 
!scope="col" style="text-align: center"| Comments
 
|-
 
|  
 
|
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|
 
| FRAC;H2O,SAND
 
|-
 
|}
 
For data sources see<ref name = RBDMS/>
 
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" style="text-align: center"| Well Status
 
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 
!scope="col" style="text-align: center"| Comment
 
|-
 
| CO
 
| 1985-11-13
 
| 281  McKENZIE VICTOR DRILL INC  GeoDate  11/13/85
 
|-
 
| Oil and Gas
 
| 1985-11-13
 
| Issued Date 11/13/85 Expired Date 11/13/86 Acres 0040000 Tool Type CT Proposed Formation CLINTON Proposed Depth 04552 Proposed Drill Depth 04552
 
|-
 
| Original Spud
 
| 1985-11-15
 
|
 
|-
 
| Completed
 
| 1986-01-17
 
|
 
|-
 
| Reached Total Depth
 
| 1986-01-17
 
|
 
|-
 
| Completion Report Received
 
| 1986-01-27
 
|
 
|-
 
| Construction Permit Expires
 
| 1986-11-13
 
|
 
|-
 
| Record Last Modified
 
| 2015-09-24
 
|
 
|-
 
|}
 
For data sources see<ref name=RBDMS/>
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Ohio Wells]]
 
[[Category:Ohio Wells]]

Latest revision as of 20:38, 11 January 2021

Well Details

Well ID: 34-119-27359
Loading map...
Country: United States
State: Ohio
County: Muskingum
Municipality: Blue Rock Township
Operator Name: VICTOR MCKENZIE DRILLING CO I
Well Pad ID:
Farm/Lease Name: OFFENBACHER UNIT
License Status: Producing
License Date: 1985-11-13
Spud Date: 1985-11-15
Spud Drilling Contractor: CO TOOLS
Final Drill Date: 1986-01-17
Well Total Depth: 4552.00 ft
Configuration: Vertical
Latitude: 39.840000
Longitude: -81.870000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1985-11-13 281 McKENZIE VICTOR DRILL INC GeoDate 11/13/85
Oil and Gas 1985-11-13 Issued Date 11/13/85 Expired Date 11/13/86 Acres 0040000 Tool Type CT Proposed Formation CLINTON Proposed Depth 04552 Proposed Drill Depth 04552
Original Spud 1985-11-15
Completed 1986-01-17
Reached Total Depth 1986-01-17
Completion Report Received 1986-01-27
Construction Permit Expires 1986-11-13
Record Last Modified 2015-09-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4405 4445 0
4405 4445 0
4405 4445 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
0 0 0 FRAC;H2O,SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1991 VICTOR MCKENZIE DRILLING CO I 955.00 442.00 365
1993 VICTOR MCKENZIE DRILLING CO I 2009.00 385.00 180
1994 VICTOR MCKENZIE DRILLING CO I 2419.00 202.00 180
1995 VICTOR MCKENZIE DRILLING CO I 2428.00 306.00 180
1996 VICTOR MCKENZIE DRILLING CO I 1216.00 134.00 180
1997 VICTOR MCKENZIE DRILLING CO I 413.00 0.00 180
1998 VICTOR MCKENZIE DRILLING CO I 1063.00 145.00 180
2000 VICTOR MCKENZIE DRILLING CO I 918.00 299.00 180
2001 VICTOR MCKENZIE DRILLING CO I 639.00 328.00 180
2002 VICTOR MCKENZIE DRILLING CO I 600.00 236.00 180
2003 VICTOR MCKENZIE DRILLING CO I 250.00 2914.00 360
2004 VICTOR MCKENZIE DRILLING CO I 480.00 253.00 300
2005 VICTOR MCKENZIE DRILLING CO I 561.00 221.00 180
2006 VICTOR MCKENZIE DRILLING CO I 0.00 315.00 300
2007 VICTOR MCKENZIE DRILLING CO I 181.00 195.00 200
2008 VICTOR MCKENZIE DRILLING CO I 304.00 0.00 365
2009 VICTOR MCKENZIE DRILLING CO I 34.00 376.00 365
2010 VICTOR MCKENZIE DRILLING CO I 368.00 357.00 365
2011 VICTOR MCKENZIE DRILLING CO I 232.00 330.00 365
2012 VICTOR MCKENZIE DRILLING CO I 232.00 331.00 366
2013 VICTOR MCKENZIE DRILLING CO I 319.00 298.00 365
2014 VICTOR MCKENZIE DRILLING CO I 285.00 469.00 365
2015 VICTOR MCKENZIE DRILLING CO I 350.00 304.00 365
2016 VICTOR MCKENZIE DRILLING CO I 350.00 304.00 365
2017 VICTOR MCKENZIE DRILLING CO I 660.00 538.00 365
2018 VICTOR MCKENZIE DRILLING CO I 1753.00 1289.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1991 VICTOR MCKENZIE DRILLING CO I Brine 90 365
1993 VICTOR MCKENZIE DRILLING CO I Brine 140 180
1994 VICTOR MCKENZIE DRILLING CO I Brine 155 180
1995 VICTOR MCKENZIE DRILLING CO I Brine 65 180
1996 VICTOR MCKENZIE DRILLING CO I Brine 90 180
1997 VICTOR MCKENZIE DRILLING CO I Brine 0 180
1998 VICTOR MCKENZIE DRILLING CO I Brine 0 180
2000 VICTOR MCKENZIE DRILLING CO I Brine 130 180
2001 VICTOR MCKENZIE DRILLING CO I Brine 155 180
2002 VICTOR MCKENZIE DRILLING CO I Brine 0 180
2003 VICTOR MCKENZIE DRILLING CO I Brine 40 360
2004 VICTOR MCKENZIE DRILLING CO I Brine 0 300
2005 VICTOR MCKENZIE DRILLING CO I Brine 45 180
2006 VICTOR MCKENZIE DRILLING CO I Brine 0 300
2007 VICTOR MCKENZIE DRILLING CO I Brine 101 200
2008 VICTOR MCKENZIE DRILLING CO I Brine 0 365
2009 VICTOR MCKENZIE DRILLING CO I Brine 10 365
2010 VICTOR MCKENZIE DRILLING CO I Brine 35 365
2011 VICTOR MCKENZIE DRILLING CO I Brine 40 365
2012 VICTOR MCKENZIE DRILLING CO I Brine 40 366
2013 VICTOR MCKENZIE DRILLING CO I Brine 45 365
2014 VICTOR MCKENZIE DRILLING CO I Brine 0 365
2015 VICTOR MCKENZIE DRILLING CO I Brine 0 365
2016 VICTOR MCKENZIE DRILLING CO I Brine 0 365
2017 VICTOR MCKENZIE DRILLING CO I Brine 50 365
2018 VICTOR MCKENZIE DRILLING CO I Brine 53 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1496157859 2009-12-9 0:00: PW No Violations
-56688867 2004-12-7 0:00: PW No Violations
0000PL7996 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0056688867 2004-12-07 Production Wells No Violations
0271911973 2008-03-24 Production Wells No Violations Producing, no problems noted.
1496157859 2009-12-09 Production Wells No Violations Producing, no problems noted.
271911973 2008-3-24 0:00: PW No Violations
PL7996 PL No Violations

For data sources see[9]

References