== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-029-21804
 
| Well ID: 34-029-21804
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.79204867, -80.90996688 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.79, -80.91 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Columbiana County, Ohio|Columbiana]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 +
|-
 +
| County: [[Columbiana_County,_Ohio|Columbiana]]
 +
|-
 +
| Municipality: [[Hanover_Township,_Columbiana_County,_Ohio|Hanover Township]]
 
|-
 
|-
 
| Operator Name: [[CHESAPEAKE EXPLORATION LLC]]
 
| Operator Name: [[CHESAPEAKE EXPLORATION LLC]]
 
|-
 
|-
| Well Pad ID:  
+
| Well Pad ID: [[US-OH-000375]]
 +
|-
 +
| Farm/Lease Name: ALTENHOF 10-15-4
 
|-
 
|-
| Farm/Lease Name:  
+
| License Status: Plugged Back
 
|-
 
|-
| First Permit Date:  
+
| License Date: 2013-08-16
 
|-
 
|-
| Last Permit Date:  
+
| Spud Date: 2013-07-10
 
|-
 
|-
| Spud Date: 2013-12-08
+
| Spud Drilling Contractor: [[NOMAC DRILLING CORP]]
 
|-
 
|-
| Unconventional: No
+
| Final Drill Date: 2013-08-30
 +
|-
 +
| Well Total Depth: 7932.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Producing
+
| Latitude: 40.790000
 
|-
 
|-
| Violations: 0
+
| Longitude: -80.910000
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 
|-
 
|-
| Latitude: 40.79204867
+
| APP
 +
| 2013-04-29
 +
| Proposed Formations:TRENTON BLACK RIVER, Issued Date:4/29/2013, Expired Date:4/29/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
 
|-
 
|-
| Longitude: -80.90996688
+
| APP
 +
| 2013-05-21
 +
| Proposed Formations:POINT PLEASANT, Issued Date:5/21/2013, Expired Date:5/21/2015 12:00:00 PM, Drilling unit acres:161.11, Proposed Well Type:OG, Proposed Well Class:EW
 
|-
 
|-
|}
+
| APP
== Production Data ==
+
| 2013-08-16
{| class="wikitable sortable" width="95%"
+
| Proposed Formations:TRENTON-BLACK RIVER, Issued Date:8/16/2013, Expired Date:8/16/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2014-4
+
| Reached Total Depth
| style="text-align:right;" | 222092.0
+
| 2013-08-30
| style="text-align:right;" | 91.0
 
 
|  
 
|  
 +
|-
 +
| Plugged Back
 +
| 2013-12-07
 
|  
 
|  
| style="text-align:right;" | 12643.0
 
| style="text-align:right;" | 91.0
 
 
|-
 
|-
 +
| Completion Report Received
 +
| 2014-01-23
 +
|
 
|-
 
|-
| 2014-3
+
| Construction Permit Expires
| style="text-align:right;" | 87740.0
+
| 2015-08-16
| style="text-align:right;" | 42.0
 
 
|  
 
|  
 +
|-
 +
| Record Last Modified
 +
| 2017-02-10
 
|  
 
|  
| style="text-align:right;" | 8455.0
 
| style="text-align:right;" | 42.0
 
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 +
|-
 +
| 2014-08-25
 +
| style="text-align: right;" | 7450
 +
| style="text-align: right;" | 13473
 +
| style="text-align: right;" | 905
 
|-
 
|-
| 2015-1
 
| style="text-align:right;" | 135878.0
 
| style="text-align:right;" | 89.0
 
 
|  
 
|  
 +
| style="text-align: right;" | 7450
 +
| style="text-align: right;" | 13473
 +
| style="text-align: right;" | 905
 +
|-
 
|  
 
|  
| style="text-align:right;" | 6402.0
+
| style="text-align: right;" | 7450
| style="text-align:right;" | 89.0
+
| style="text-align: right;" | 13473
 +
| style="text-align: right;" | 905
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - Perfs Table
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2020-11-16
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
== Inspection Data ==
+
== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Job Number
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Job Start Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Job End Date
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| True Vertical Depth (ft)
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Total Water Volume (gal)
!scope="col" | VIOLATION CODE
+
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
!scope="col" | VIOLATION COMMENT
+
|-
 +
| 1
 +
| 06/26/2014
 +
| 07/02/2014
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 8,071,140.0
 +
| style="text-align: right;" | 671625
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="21"| 1
 +
| rowspan="1"| Recycled Produced Water
 +
| rowspan="1"| CHESAPEAKE ENERGY
 +
| rowspan="1"| Carrier/Base Fluid
 +
| Water
 +
| 007732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.78366
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Fresh Water
 +
| rowspan="1"| CHESAPEAKE ENERGY
 +
| rowspan="1"| Carrier/Base Fluid
 +
| Water
 +
| 007732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 82.9985
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="19"| A264, B244, B317, J218, J475, J580,
 +
J609, J610, L058, Acid, Hydrochloric
 +
7.5pct, Northern White Sand, 100 Mesh Sand
 +
| rowspan="19"| SCHLUMBERGER
 +
| rowspan="19"| Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural
 +
| Water
 +
| 007732-18-5
 +
| style="text-align: right;" | 93
 +
| style="text-align: right;" | 1.09755
 +
| style="text-align: right;" | 0
 +
|-
 +
| Aliphatic alcohols, ethoxylated # 1
 +
| NA
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00033
 +
| style="text-align: right;" | 0
 +
|-
 +
| Aliphatic amine polymer
 +
| NA
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.0093
 +
| style="text-align: right;" | 0
 +
|-
 +
| Trisodium Ortho Phosphate
 +
| 007601-54-9
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.0014
 +
| style="text-align: right;" | 0
 +
|-
 +
| Methanol (Methyl Alcohol)
 +
| 000067-56-1
 +
| style="text-align: right;" | 40
 +
| style="text-align: right;" | 0.00044
 +
| style="text-align: right;" | 0
 
|-
 
|-
| -110200003
+
| Crystalline Silica (Quartz Sand, Silicon Dioxide)
| 2013-09-03
+
| 014808-60-7
|  
+
| style="text-align: right;" | 100
| As I was unable to be at the cementing of the production casing, I stopped by the site to discuss the cement job and pick up the associated paperwork from drilling consultant, Terry Getz. The consultant was at the next location for the rig. Personnel and equipment were on site to rig down and move the rig to the next location. The rig move was in progress. I called Mr. Getz, and made arrangements to get the paperwork and discuss the production casing cement job at a later time.
+
| style="text-align: right;" | 14.3011
|  
+
| style="text-align: right;" | 0
|  
+
|-
|  
+
| Sodium Erythorbate
 +
| 006381-77-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.00037
 +
| style="text-align: right;" | 0
 +
|-
 +
| Carbohydrate polymer
 +
| NA
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.08514
 +
| style="text-align: right;" | 0
 +
|-
 +
| Glutaraldehyde (Pentanediol)
 +
| 000111-30-8
 +
| style="text-align: right;" | 25
 +
| style="text-align: right;" | 0.00543
 +
| style="text-align: right;" | 0
 +
|-
 +
| Crystalline Silica (Quartz Sand, Silicon Dioxide)
 +
| 014808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.49684
 +
| style="text-align: right;" | 0
 +
|-
 +
| Potassium Hydroxide
 +
| 001310-58-3
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.00947
 +
| style="text-align: right;" | 0
 +
|-
 +
| Ammonium Persulfate
 +
| 007727-54-0
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.00045
 +
| style="text-align: right;" | 0
 +
|-
 +
| Hydrochloric Acid
 +
| 007647-01-0
 +
| style="text-align: right;" | 8
 +
| style="text-align: right;" | 0.08899
 +
| style="text-align: right;" | 0
 +
|-
 +
| Ammonium Sulfate
 +
| 007783-20-2
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.0093
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| Aliphatic polyol
 +
| NA
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.01893
 +
| style="text-align: right;" | 0
 
|-
 
|-
| -1312526130
+
| Aliphatic acid
| 2013-12-02
+
| NA
|  
+
| style="text-align: right;" | 30
| I went to the site and had a pre-spud meeting with drilling consultant Larry Williamson.  We reviewed the drilling information and production casing installation and cementing data for the Judy Brown 6H (previous well), and discussed the casing cutting and kick-off plug installation for the Altenhof 3H.  Nomac 43 was largely rigged up and waiting on arrival of mud pumps.
+
| style="text-align: right;" | 0.00033
|  
+
| style="text-align: right;" | 0
|
 
|  
 
 
|-
 
|-
 +
| Propargyl Alcohol (2-Propynol)
 +
| 000107-19-7
 +
| style="text-align: right;" | 10
 +
| style="text-align: right;" | 0.00011
 +
| style="text-align: right;" | 0
 
|-
 
|-
| -1338819946
+
| Ammonium Persulfate
| 2013-12-19
+
| 007727-54-0
|  
+
| style="text-align: right;" | 100
| I was notified of the cementing of the production casing.  The drilling contractor, Nomac 43, drilled a 8.5 diameter hole to the total measured depth of 13,680'. There were no issues while drilling. 5.50 OD casing was set at 13,680' KB.  A total of 100 centralizers were installed on the production casing. Schlumberger was the cementing contractor. There was good fluid circulation throughout the cementing operation. The company used a lead cement followed by a tail cement. The lead cement was mudscaled at 13.5ppg. Schlumberger pumped 273 bbls of lead cement at 13.5 ppg. The tail cement was mudscaled at 15.6 ppg. Schlumberger pumped 303 bbls of tail cement at 15.6 ppg. The plug was dropped, and displaced with 302 bbls of water. The plug bumped the float collar at 4:59am on 12/19/2013.  Pressure held. The float held when the pressure was released. 4 bbls of water bled back.
+
| style="text-align: right;" | 0.00251
|  
+
| style="text-align: right;" | 0
|
 
|  
 
 
|-
 
|-
 +
| Ethylene Glycol
 +
| 000107-21-1
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.0014
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 1386774783
+
|}
| 2013-12-07
+
For data sources see<ref>{{cite web
|  
+
| title = FracFocus Fracking Chemicals Database
| I was at the site to witness the plug back /kick off plug cementing operation.  The well originally had 5.5
+
| date = 2019-04-02
|  
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
|  
+
| accessdate = 2019-06-19 }}</ref>
|  
+
<!--== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 
|-
 
|-
 +
|}-->
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 
|-
 
|-
| 1396465107
+
|}-->
| 2014-03-10
+
== Waste Data ==
|  
+
{| class="wikitable sortable"
| Inspector Jim Bucksar and I met with landowner, Mr. Tom Altenhof, as a follow-up to a telephone agreement on February 6, 2014, that after the snow melted, I would inspect the area surrounding the access road and drilling pad for erosion and drainage issues.  We walked the entire length of the access road and around the perimeter of the drilling pad.  Photos were taken.  Mr. Altenhof had two major areas of concern.  During my inspection of the first area of concern, I found that along the east side of the northern end of the access road, the drainage ditch became less defined, and run-off from the south was causing erosion and sedimentation that crossed into Mr. Altenhof
+
!scope="col" style="text-align: center"| Period
|  
+
!scope="col" style="text-align: center"| Operator Name
|  
+
!scope="col" style="text-align: center"| Waste Type
|  
+
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 
|-
 
|-
 +
| 2014
 +
| [[CHESAPEAKE EXPLORATION LLC]]
 +
| Brine
 +
| style="text-align: right;" | 17444
 +
| style="text-align: right;" | 133
 
|-
 
|-
| 1396970248
+
| 2015
| 2014-04-07
+
| [[CHESAPEAKE EXPLORATION LLC]]
|  
+
| Brine
| I was informed by BJ Morris of Chesapeake that the remedial site work regarding drainage and erosion at the Altenhof property was completed. I went to the site to review the work.  I noted that along the perimeter of Mr. Altenhof
+
| style="text-align: right;" | 4584
|  
+
| style="text-align: right;" | 364
|  
 
|  
 
 
|-
 
|-
 +
| 2016
 +
| [[CHESAPEAKE EXPLORATION LLC]]
 +
| Brine
 +
| style="text-align: right;" | 2485
 +
| style="text-align: right;" | 366
 
|-
 
|-
| -1449058721
+
| 2017
| 2013-07-11
+
| [[CHESAPEAKE EXPLORATION LLC]]
|  
+
| Brine
| I witnessed the cementing of the conductor casing.  Precision Rathole drilled a 26 diameter hole to 26
+
| style="text-align: right;" | 1723
|  
+
| style="text-align: right;" | 365
|  
 
|  
 
 
|-
 
|-
 +
| 2018
 +
| [[CHESAPEAKE EXPLORATION LLC]]
 +
| Brine
 +
| style="text-align: right;" | 1612
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1888831916
+
| 2019
| 2013-08-29
+
| [[CHESAPEAKE EXPLORATION LLC]]
|  
+
| Brine
| I was at the site checking the drilling progress.  I met with drilling consultant Terry Getz.  The rig was tripping drill pipe into the hole.  Drilling had been stopped for a time due to top drive problems.  Current depth was 6567
+
| style="text-align: right;" | 481
|  
+
| style="text-align: right;" | 90
|  
 
|  
 
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Inspection Date
 +
!scope="col" style="text-align: center"| Inspection Type
 +
!scope="col" style="text-align: center"| Inspection Result
 +
!scope="col" style="text-align: center"| Inspection Comments
 
|-
 
|-
| -1904425251
+
| -110200003
| 2014-05-22
+
| 2013-9-3 0:00:0
 +
| DD
 +
| No Violations
 
|  
 
|  
| I reviewed the site to assess the completion of preliminary restoration.  There is a sign board at the access road entry featuring the well name, permit number and emergency contact information.  The access road is in good repair.  Drainage and erosion controls were in place and appear to be functioning.  Ground cover was well established along the access road.  I found the drilling/production pad to be enclosed entirely with a chain link fence with barbed wire at the top, and with a padlocked gate.  The pad has a crushed limestone surface, and is in good repair.  There is some standing water along some of the pad edges.  I walked the exterior perimeter and noted that the berm is in good repair and ground cover is well established.  The area of disturbance around the pad has good ground cover.  Crops are growing well outside the area of disturbance.  The soil stockpile is well stabilized with vegetation.  A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure.  There is 25 - 500 barrel frac tanks on location, and has a Christmas tree valve assembly. The tank battery consist of two 400 barrel tanks. The GPU unit is connected to the pipeline. There is no pipelines layed to wellhead.  There are bull gates and concrete barriers surrounding the wellhead and cellar to prevent vehicle impacts.  There are grates over the cellar to prevent falls.  There is no ID tag on the well, but it is the only one on the site.  The cellar is full of water to the top.  The mouse hole has not been plugged, but has a steel plate welded on top.  Preliminary restoration cannot be approved at this time..
+
|-
 +
| -1312526130
 +
| 2013-12-2 0:00:
 +
| DD
 +
| No Violations
 
|  
 
|  
 +
|-
 +
| -1338819946
 +
| 2013-12-19 0:00
 +
| DD
 +
| No Violations
 
|  
 
|  
 +
|-
 +
| -1449058721
 +
| 2013-7-11 0:00:
 +
| CS
 +
| No Violations
 
|  
 
|  
 
|-
 
|-
 +
| -1904425251
 +
| 2014-5-22 0:00:
 +
| PW
 +
| No Violations
 +
| 2.00
 
|-
 
|-
| 1940394008
+
| -520068039
| 2014-03-17
+
| 2014-3-20 0:00:
 +
| PL
 +
| No Violations
 
|  
 
|  
| Arrangements had been made for Regional Supervisor Tom Hill and engineer Ron Trivisonno to accompany me for a follow-up inspection at the site to review the erosion and drainage issues.  Mr. Trivisonno was unable to be there, so Mr. Hill and I conducted the inspection.  We reviewed the two primary issues pertaining to Mr. Altenhof
+
|-
 +
| -604049865
 +
| 2013-8-24 0:00:
 +
| CS
 +
| No Violations
 
|  
 
|  
 +
|-
 +
| -659865450
 +
| 2013-7-3 0:00:0
 +
| SC
 +
| No Violations
 
|  
 
|  
 +
|-
 +
| -793489714
 +
| 2013-8-22 0:00:
 +
| CS
 +
| No Violations
 
|  
 
|  
 
|-
 
|-
|-
+
| -922027988
| 2025453857
+
| 2014-2-6 0:00:0
| 2013-11-29
+
| PL
|
+
| No Violations
| I stopped by to check on the site preparations for the move-in of the drilling rig.  I found that preparations were underway, but no rig equipment was on site.  Some secondary containment was in place and mat boards were down.  A number of frac tanks and light plants were also in place.  One housing unit was in place, and trucks were bringing equipment in as I was leaving the site.
 
|  
 
|  
 
 
|  
 
|  
 
|-
 
|-
 +
| 0110200003
 +
| 2013-09-03
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| As I was unable to be at the cementing of the production casing, I stopped by the site to discuss the cement job and pick up the associated paperwork from drilling consultant, Terry Getz.  The consultant was at the next location for the rig.  Personnel and equipment were on site to rig down and move the rig to the next location.  The rig move was in progress.  I called Mr. Getz, and made arrangements to get the paperwork and discuss the production casing cement job at a later time.
 
|-
 
|-
| 293736225
+
| 0293736225
 
| 2013-08-20
 
| 2013-08-20
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| I went to the site and had a pre-spud meeting with drilling consultant Dave Weisgerber.  Nomac 290 was on location, and rigging up operations were still in progress.
 
| I went to the site and had a pre-spud meeting with drilling consultant Dave Weisgerber.  Nomac 290 was on location, and rigging up operations were still in progress.
|
 
|
 
|
 
|-
 
 
|-
 
|-
| 299229088
+
| 0299229088
 
| 2013-08-05
 
| 2013-08-05
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| I stopped by to check on the site preparations for the move-in of the drilling rig.  I found that preparations were underway, but no rig equipment was on site.  A number of frac tanks and light plants were in place, along with some housing trailers for rig personnel.
 
| I stopped by to check on the site preparations for the move-in of the drilling rig.  I found that preparations were underway, but no rig equipment was on site.  A number of frac tanks and light plants were in place, along with some housing trailers for rig personnel.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 0371879177
| 371879177
 
 
| 2013-05-15
 
| 2013-05-15
|  
+
| Surface Facility Construction
 +
| No Violations
 
| I went to the site and conducted a pre-construction site inspection with Cody Theimer, Chesapeake Field Representative.
 
| I went to the site and conducted a pre-construction site inspection with Cody Theimer, Chesapeake Field Representative.
|
 
|
 
|
 
 
|-
 
|-
 +
| 0470516381
 +
| 2017-02-08
 +
| Production Wells
 +
| No Violations
 +
| The purpose for my inspection was to conduct a status check well #2-1804-01-00).  RBDMS indicates the operator is current with reporting production.  The lease entrance is marked with a sign board containing signs reporting required well identification and emergency response information.  The lease road is composed of crushed gravel and remains in good repair.  No signs of erosion were observed adjacent to the road traveling back to the pad.  The soil stockpile remains stable with well-
 
|-
 
|-
| -520068039
+
| 0520068039
 
| 2014-03-20
 
| 2014-03-20
|  
+
| Preliminary Restoration
 +
| No Violations
 
| ODNR engineer Ron Trivisonno and I met at the site with BJ Morris and others of Chesapeake Exploration, and Mr. Tom Altenhof.  Together we reviewed the two areas of concern regarding erosion and sedimentation.  Mr. Altenhof expressed his concerns and his desire to get the problems corrected. Mr. Morris and Mr. Trivisonno discussed the issues and possible remedies.  Following the inspection, Mr. Morris indicated that he would discuss the problems with Chesapeake engineers, and proceed with developing solutions and correcting the problems. Mr. Morris will keep me up to date with their plans.
 
| ODNR engineer Ron Trivisonno and I met at the site with BJ Morris and others of Chesapeake Exploration, and Mr. Tom Altenhof.  Together we reviewed the two areas of concern regarding erosion and sedimentation.  Mr. Altenhof expressed his concerns and his desire to get the problems corrected. Mr. Morris and Mr. Trivisonno discussed the issues and possible remedies.  Following the inspection, Mr. Morris indicated that he would discuss the problems with Chesapeake engineers, and proceed with developing solutions and correcting the problems. Mr. Morris will keep me up to date with their plans.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 0604049865
| -604049865
 
 
| 2013-08-24
 
| 2013-08-24
|  
+
| Casing String Witnessed
| I went to the site to witness the cementing of the intermediate casing.  The drilling contractor, Nomac 290, drilled a 12.25 diameter hole to 1410
+
| No Violations
|
+
 
|
 
|
 
|-
 
 
|-
 
|-
| -659865450
+
| 0659865450
 
| 2013-07-03
 
| 2013-07-03
|  
+
| Surface Facility Construction
 +
| No Violations
 
| I went to the site to review the construction process of the drilling pad.  The construction of the access road and pad was nearing completion.
 
| I went to the site to review the construction process of the drilling pad.  The construction of the access road and pad was nearing completion.
|
 
|
 
|
 
 
|-
 
|-
 +
| 0793489714
 +
| 2013-08-22
 +
| Casing String Witnessed
 +
| No Violations
 +
 +
|-
 +
| 0922027988
 +
| 2014-02-06
 +
| Preliminary Restoration
 +
| No Violations
 +
 +
|-
 +
| 1312526130
 +
| 2013-12-02
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| I went to the site and had a pre-spud meeting with drilling consultant Larry Williamson.  We reviewed the drilling information and production casing installation and cementing data for the Judy Brown 6H (previous well), and discussed the casing cutting and kick-off plug installation for the Altenhof 3H.  Nomac 43 was largely rigged up and waiting on arrival of mud pumps.
 +
|-
 +
| 1338819946
 +
| 2013-12-19
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| I was notified of the cementing of the production casing.  The drilling contractor, Nomac 43, drilled a 8.5 diameter hole to the total measured depth of 13,680. There were no issues while drilling. 5.50 OD casing was set at 13,680 KB.  A total of 100 centralizers were installed on the production casing. Schlumberger was the cementing contractor. There was good fluid circulation throughout the cementing operation. The company used a lead cement followed by a tail cement. The lead cement was mudscaled at 13.5ppg. Schlumberger pumped 273 bbls of lead cement at 13.5 ppg. The tail cement was mudscaled at 15.6 ppg. Schlumberger pumped 303 bbls of tail cement at 15.6 ppg. The plug was dropped, and displaced with 302 bbls of water. The plug bumped the float collar at 4:59am on 12/19/2013.  Pressure held. The float held when the pressure was released. 4 bbls of water bled back.
 +
|-
 +
| 1386774783
 +
| 2013-12-07
 +
| Plug / Plug Back
 +
| No Violations
 +
-
 +
|-
 +
| 1396465107
 +
| 2014-03-10
 +
| Preliminary Restoration
 +
| No Violations
 +
| Inspector Jim Bucksar and I met with landowner, Mr. Tom Altenhof, as a follow-up to a telephone agreement on February 6, 2014, that after the snow melted, I would inspect the area surrounding the access road and drilling pad for erosion and drainage issues.  We walked the entire length of the access road and around the perimeter of the drilling pad.  Photos were taken.  Mr. Altenhof had two major areas of concern.  During my inspection of the first area of concern, I found that along the east side of the northern end of the access road, the drainage ditch became less defined, and run-
 +
|-
 +
| 1396970248
 +
| 2014-04-07
 +
| Preliminary Restoration
 +
| No Violations
 +
 +
|-
 +
| 1449058721
 +
| 2013-07-11
 +
| Casing String Witnessed
 +
| No Violations
 +
 +
|-
 +
| 1506136078
 +
| 2019-7-25 0:00:
 +
| PW
 +
| No Violations
 +
| 2.00
 +
|-
 +
| 1888831916
 +
| 2013-08-29
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
 +
|-
 +
| 1904425251
 +
| 2014-05-22
 +
| Production Wells
 +
| No Violations
 +
| I reviewed the site to assess the completion of preliminary restoration.  There is a sign board at the access road entry featuring the well name, permit number and emergency contact information.  The access road is in good repair.  Drainage and erosion controls were in place and appear to be functioning.  Ground cover was well established along the access road.  I found the drilling/production pad to be enclosed entirely with a chain link fence with barbed wire at the top, and with a padlocked gate.  The pad has a crushed limestone surface, and is in good repair.  There is some standing water along some of the pad edges.  I walked the exterior perimeter and noted that the berm is in good repair and ground cover is well established.  The area of disturbance around the pad has good ground cover.  Crops are growing well outside the area of disturbance.  The soil stockpile is well stabilized with vegetation.  A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure.  There is 25 - 500 barrel frac tanks on location, and has a Christmas tree valve assembly. The tank battery consist of two 400 barrel tanks. The GPU unit is connected to the pipeline. There is no pipelines layed to wellhead.  There are bull gates and concrete barriers surrounding the wellhead and cellar to prevent vehicle impacts.  There are grates over the cellar to prevent falls.  There is no ID tag on the well, but it is the only one on the site.  The cellar is full of water to the top.  The mouse hole has not been plugged, but has a steel plate welded on top.  Preliminary restoration cannot be approved at this time..
 
|-
 
|-
| -793489714
+
| 1940394008
| 2013-08-22
+
| 2014-03-17
|
+
| Preliminary Restoration
| I was at the site to witness the cementing of the surface casing.  The drilling contractor, Nomac 290, spudded the surface section of the well on 08/21/2013.  The 17.50 diameter surface hole was drilled to 605
+
| No Violations
|  
+
| Arrangements had been made for Regional Supervisor Tom Hill and engineer Ron Trivisonno to accompany me for a follow-
|  
 
|  
 
 
|-
 
|-
 +
| 2025453857
 +
| 2013-11-29
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| I stopped by to check on the site preparations for the move-in of the drilling rig.  I found that preparations were underway, but no rig equipment was on site.  Some secondary containment was in place and mat boards were down.  A number of frac tanks and light plants were also in place.  One housing unit was in place, and trucks were bringing equipment in as I was leaving the site.
 
|-
 
|-
| -922027988
+
| 293736225
| 2014-02-06
+
| 2013-8-20 0:00:
|  
+
| DD
| Mr. Tom Altenhof called the Uniontown office regarding drainage issues from the drilling pad on his property.  I called him, and didn
+
| No Violations
 
|  
 
|  
 +
|-
 +
| 299229088
 +
| 2013-8-5 0:00:0
 +
| DD
 +
| No Violations
 
|  
 
|  
 +
|-
 +
| 371879177
 +
| 2013-5-15 0:00:
 +
| SC
 +
| No Violations
 
|  
 
|  
 +
|-
 +
| 470516381
 +
| 2017-2-8 0:00:0
 +
| PW
 +
| No Violations
 +
| 1.40
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2020-11-16
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 19:09, 11 January 2021

Well Details

Well ID: 34-029-21804
Loading map...
Country: United States
State: Ohio
County: Columbiana
Municipality: Hanover Township
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID: US-OH-000375
Farm/Lease Name: ALTENHOF 10-15-4
License Status: Plugged Back
License Date: 2013-08-16
Spud Date: 2013-07-10
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2013-08-30
Well Total Depth: 7932.00 ft
Configuration: Vertical
Latitude: 40.790000
Longitude: -80.910000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-04-29 Proposed Formations:TRENTON BLACK RIVER, Issued Date:4/29/2013, Expired Date:4/29/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2013-05-21 Proposed Formations:POINT PLEASANT, Issued Date:5/21/2013, Expired Date:5/21/2015 12:00:00 PM, Drilling unit acres:161.11, Proposed Well Type:OG, Proposed Well Class:EW
APP 2013-08-16 Proposed Formations:TRENTON-BLACK RIVER, Issued Date:8/16/2013, Expired Date:8/16/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Reached Total Depth 2013-08-30
Plugged Back 2013-12-07
Completion Report Received 2014-01-23
Construction Permit Expires 2015-08-16
Record Last Modified 2017-02-10

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-08-25 7450 13473 905
7450 13473 905
7450 13473 905

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/26/2014 07/02/2014 0 8,071,140.0 671625

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 0.78366 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 82.9985 0
A264, B244, B317, J218, J475, J580,

J609, J610, L058, Acid, Hydrochloric 7.5pct, Northern White Sand, 100 Mesh Sand

SCHLUMBERGER Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural Water 007732-18-5 93 1.09755 0
Aliphatic alcohols, ethoxylated # 1 NA 30 0.00033 0
Aliphatic amine polymer NA 30 0.0093 0
Trisodium Ortho Phosphate 007601-54-9 5 0.0014 0
Methanol (Methyl Alcohol) 000067-56-1 40 0.00044 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 14.3011 0
Sodium Erythorbate 006381-77-7 100 0.00037 0
Carbohydrate polymer NA 100 0.08514 0
Glutaraldehyde (Pentanediol) 000111-30-8 25 0.00543 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 0.49684 0
Potassium Hydroxide 001310-58-3 15 0.00947 0
Ammonium Persulfate 007727-54-0 100 0.00045 0
Hydrochloric Acid 007647-01-0 8 0.08899 0
Ammonium Sulfate 007783-20-2 30 0.0093 0
Aliphatic polyol NA 30 0.01893 0
Aliphatic acid NA 30 0.00033 0
Propargyl Alcohol (2-Propynol) 000107-19-7 10 0.00011 0
Ammonium Persulfate 007727-54-0 100 0.00251 0
Ethylene Glycol 000107-21-1 5 0.0014 0

For data sources see[4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC Brine 17444 133
2015 CHESAPEAKE EXPLORATION LLC Brine 4584 364
2016 CHESAPEAKE EXPLORATION LLC Brine 2485 366
2017 CHESAPEAKE EXPLORATION LLC Brine 1723 365
2018 CHESAPEAKE EXPLORATION LLC Brine 1612 365
2019 CHESAPEAKE EXPLORATION LLC Brine 481 90

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-110200003 2013-9-3 0:00:0 DD No Violations
-1312526130 2013-12-2 0:00: DD No Violations
-1338819946 2013-12-19 0:00 DD No Violations
-1449058721 2013-7-11 0:00: CS No Violations
-1904425251 2014-5-22 0:00: PW No Violations 2.00
-520068039 2014-3-20 0:00: PL No Violations
-604049865 2013-8-24 0:00: CS No Violations
-659865450 2013-7-3 0:00:0 SC No Violations
-793489714 2013-8-22 0:00: CS No Violations
-922027988 2014-2-6 0:00:0 PL No Violations
0110200003 2013-09-03 Drill / Deepen / Reopen No Violations As I was unable to be at the cementing of the production casing, I stopped by the site to discuss the cement job and pick up the associated paperwork from drilling consultant, Terry Getz. The consultant was at the next location for the rig. Personnel and equipment were on site to rig down and move the rig to the next location. The rig move was in progress. I called Mr. Getz, and made arrangements to get the paperwork and discuss the production casing cement job at a later time.
0293736225 2013-08-20 Drill / Deepen / Reopen No Violations I went to the site and had a pre-spud meeting with drilling consultant Dave Weisgerber. Nomac 290 was on location, and rigging up operations were still in progress.
0299229088 2013-08-05 Drill / Deepen / Reopen No Violations I stopped by to check on the site preparations for the move-in of the drilling rig. I found that preparations were underway, but no rig equipment was on site. A number of frac tanks and light plants were in place, along with some housing trailers for rig personnel.
0371879177 2013-05-15 Surface Facility Construction No Violations I went to the site and conducted a pre-construction site inspection with Cody Theimer, Chesapeake Field Representative.
0470516381 2017-02-08 Production Wells No Violations The purpose for my inspection was to conduct a status check well #2-1804-01-00). RBDMS indicates the operator is current with reporting production. The lease entrance is marked with a sign board containing signs reporting required well identification and emergency response information. The lease road is composed of crushed gravel and remains in good repair. No signs of erosion were observed adjacent to the road traveling back to the pad. The soil stockpile remains stable with well-
0520068039 2014-03-20 Preliminary Restoration No Violations ODNR engineer Ron Trivisonno and I met at the site with BJ Morris and others of Chesapeake Exploration, and Mr. Tom Altenhof. Together we reviewed the two areas of concern regarding erosion and sedimentation. Mr. Altenhof expressed his concerns and his desire to get the problems corrected. Mr. Morris and Mr. Trivisonno discussed the issues and possible remedies. Following the inspection, Mr. Morris indicated that he would discuss the problems with Chesapeake engineers, and proceed with developing solutions and correcting the problems. Mr. Morris will keep me up to date with their plans.
0604049865 2013-08-24 Casing String Witnessed No Violations
0659865450 2013-07-03 Surface Facility Construction No Violations I went to the site to review the construction process of the drilling pad. The construction of the access road and pad was nearing completion.
0793489714 2013-08-22 Casing String Witnessed No Violations
0922027988 2014-02-06 Preliminary Restoration No Violations
1312526130 2013-12-02 Drill / Deepen / Reopen No Violations I went to the site and had a pre-spud meeting with drilling consultant Larry Williamson. We reviewed the drilling information and production casing installation and cementing data for the Judy Brown 6H (previous well), and discussed the casing cutting and kick-off plug installation for the Altenhof 3H. Nomac 43 was largely rigged up and waiting on arrival of mud pumps.
1338819946 2013-12-19 Drill / Deepen / Reopen No Violations I was notified of the cementing of the production casing. The drilling contractor, Nomac 43, drilled a 8.5 diameter hole to the total measured depth of 13,680. There were no issues while drilling. 5.50 OD casing was set at 13,680 KB. A total of 100 centralizers were installed on the production casing. Schlumberger was the cementing contractor. There was good fluid circulation throughout the cementing operation. The company used a lead cement followed by a tail cement. The lead cement was mudscaled at 13.5ppg. Schlumberger pumped 273 bbls of lead cement at 13.5 ppg. The tail cement was mudscaled at 15.6 ppg. Schlumberger pumped 303 bbls of tail cement at 15.6 ppg. The plug was dropped, and displaced with 302 bbls of water. The plug bumped the float collar at 4:59am on 12/19/2013. Pressure held. The float held when the pressure was released. 4 bbls of water bled back.
1386774783 2013-12-07 Plug / Plug Back No Violations

-

1396465107 2014-03-10 Preliminary Restoration No Violations Inspector Jim Bucksar and I met with landowner, Mr. Tom Altenhof, as a follow-up to a telephone agreement on February 6, 2014, that after the snow melted, I would inspect the area surrounding the access road and drilling pad for erosion and drainage issues. We walked the entire length of the access road and around the perimeter of the drilling pad. Photos were taken. Mr. Altenhof had two major areas of concern. During my inspection of the first area of concern, I found that along the east side of the northern end of the access road, the drainage ditch became less defined, and run-
1396970248 2014-04-07 Preliminary Restoration No Violations
1449058721 2013-07-11 Casing String Witnessed No Violations
1506136078 2019-7-25 0:00: PW No Violations 2.00
1888831916 2013-08-29 Drill / Deepen / Reopen No Violations
1904425251 2014-05-22 Production Wells No Violations I reviewed the site to assess the completion of preliminary restoration. There is a sign board at the access road entry featuring the well name, permit number and emergency contact information. The access road is in good repair. Drainage and erosion controls were in place and appear to be functioning. Ground cover was well established along the access road. I found the drilling/production pad to be enclosed entirely with a chain link fence with barbed wire at the top, and with a padlocked gate. The pad has a crushed limestone surface, and is in good repair. There is some standing water along some of the pad edges. I walked the exterior perimeter and noted that the berm is in good repair and ground cover is well established. The area of disturbance around the pad has good ground cover. Crops are growing well outside the area of disturbance. The soil stockpile is well stabilized with vegetation. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. There is 25 - 500 barrel frac tanks on location, and has a Christmas tree valve assembly. The tank battery consist of two 400 barrel tanks. The GPU unit is connected to the pipeline. There is no pipelines layed to wellhead. There are bull gates and concrete barriers surrounding the wellhead and cellar to prevent vehicle impacts. There are grates over the cellar to prevent falls. There is no ID tag on the well, but it is the only one on the site. The cellar is full of water to the top. The mouse hole has not been plugged, but has a steel plate welded on top. Preliminary restoration cannot be approved at this time..
1940394008 2014-03-17 Preliminary Restoration No Violations Arrangements had been made for Regional Supervisor Tom Hill and engineer Ron Trivisonno to accompany me for a follow-
2025453857 2013-11-29 Drill / Deepen / Reopen No Violations I stopped by to check on the site preparations for the move-in of the drilling rig. I found that preparations were underway, but no rig equipment was on site. Some secondary containment was in place and mat boards were down. A number of frac tanks and light plants were also in place. One housing unit was in place, and trucks were bringing equipment in as I was leaving the site.
293736225 2013-8-20 0:00: DD No Violations
299229088 2013-8-5 0:00:0 DD No Violations
371879177 2013-5-15 0:00: SC No Violations
470516381 2017-2-8 0:00:0 PW No Violations 1.40

For data sources see[7]