X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-131-20544

Well Details

Well ID: 37-131-20544
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Meshoppen Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 145622
Farm/Lease Name: HOPE 5H
License Status:
Spud Date:
Permit Date: 2017-12-08
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.605786
Longitude: -76.0797

For data sources see[1][2][3]

Well History

Date Event
2017-12-08 New Permit Application
2018-01-23 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-01 2018-08-16 7,495 10,816,500 955,985

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 ResCare IC 300L BJ SERVICES Iron Control Agent Citric Acid 000077-92-9 0.5 0.00005000 0
HCL10.1 - 15 BJ SERVICES Acid Hydrochloric Acid 007647-01-0 0.15 0.00037 0
Water 007732-18-5 0.85 0.00207 0
ThinFrac MP I BJ SERVICES Friction Reducer Distillates (petroleum), Hydrotreated Light 64742-47-8 0.3 0.0002 0
Sodium Chloride 7647-14-5 0.05 0.00003000 0
Oxyalkylated alcohol Trade Secret 0.05 0.00003000 0
Northern White Sand BJ SERVICES Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 1 0.15972 0
CI-14 BJ SERVICES Corrosion Inhibitor Proprietary Olefin Trade Secret 0.05 0 0
Methanol (Methyl Alcohol) 000067-56-1 0.7 0.00002000 0
Propargyl Alcohol (2-Propynol) 000107-19-7 0.05 0 0
Proprietary Polyoxyalkylenes Trade Secret 0.2 0 0
Proprietary Fatty Acids Trade Secret 0.1 0 0
Chlorine Dioxide FOUNTAIN QUAIL Anti-Bacterial Agent Chlorine Dioxide 10049-04-4 0.01 0 0
HCL 5.1 - 7.5 BJ SERVICES Acid Hydrochloric Acid 007647-01-0 0.08 0.00067 0
Water 007732-18-5 0.93 0.00826 0
FracCare SI720 BJ SERVICES Scale Inhibitor Diethylene Glycol 000111-46-6 0.05 0.00001000 0
Ethylene Glycol 000107-21-1 0.35 0.00008000 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 1 0.68207 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 1 0.14583 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 CHESAPEAKE APPALACHIA LLC 3,154,898.00 107 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 5,789,136.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CHESAPEAKE APPALACHIA LLC Drill Cuttings 1,707.20 Tons LANDFILL 100933
2018 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 150.79 Tons LANDFILL 301626
2018 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 15.00 Tons LANDFILL 8-0728-0004/013
2018 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 6.50 Tons CENT WASTE TRT FAC NPDES PAG034815
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 634.55 Bbl REUSE (AT WELL PAD)
2018 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 3,529.94 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 108.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 505.22 Bbl REUSE (AT WELL PAD)
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 559.21 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 6.50 Tons CENT WASTE TRT FAC NPDES DISCHARGE PAG034815
2018 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 117.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 CHESAPEAKE APPALACHIA LLC Drilling Fluid Waste 272.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 36.01 Bbl REUSE (AT WELL PAD)
2019 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 5.34 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2687560 Primary Facility 2018-01-25 Drilling/Alteration No Violations Noted Arrive on location: 13:45. Weather: Clear, cold, ~ 20 degs. On location to perform "New Spud" inspection, accompanied by DEP OGI, Ulyana Trynovich. Upon arrival, Express Energy Services has set 20" Conductor and 16" mouseholes for (2) new wells on pad, the Hope 5H and 6H. Both new wells conductors have been set at ~ 80' and cemented to surface. - One (1) existing well was present on pad, the Hope 2H. This well has been disconnected from all previous production equipment and has been temporarily shut in, in preparation for drilling new wells on pad. The 2H well was capped with a 5K master valve. (3) 2" annuli vents were present and plumbed to surface. The (5/P) and (9x5) annuli were shut in to analog gauges, both reading 0 psi. The (13x9) vent was open and venting to atmosphere through a "vent check" fitting. Gas check performed at the (13x9) "vent check" opening showed 0 % LEL, 0 % CH4. Gas check was performed using an MSA Altair 5X gas meter calibrated on 1/22/18. No obvious concerns or violations were note
2714321 Primary Facility 2018-04-04 Drilling/Alteration No Violations Noted Arrived on location: 08:45. Weather: Overcast, light rain, ~ 40 degs. Upon arrival met with Chesapeake "CHK" Reps. Chris Schmaltz, Drilling Superintendent; Terry Hooper, Well-site Super; and Isabelle Belleon, Drilling Engineer. The Patterson #572 Rig has recently moved on location to drill (2) new wells on pad, the Hope 5H & 6H. Rig has TD'd the 17 1/2" Surface interval of the 5H well at 550' and is presently running 13 3/8" casing in hole. When set, this surface casing string will be cemented to surface by Schlumberger using their CemCrete blend later this afternoon.

- I confirmed with Mr. Schmaltz that CBLs will be ran on the Surface and Intermediate casing strings of both wells being drilled on this pad to assess cement jobs. I requested a .pdf copy of these CBLs be emailed to me when obtained. - CHK will continue drilling the 5H well to TD prior to skidding to the 6H well. The 20" conductor was set for the 6H well on ~ 1/16/18. - One (1) existing well was present on pad, the Hope 2H. This well has been

2719818 Primary Facility 2018-04-17 Drilling/Alteration No Violations Noted Arrived on location: 13:30. Upon arrival I met with Chesapeake "CHK" Co. Man, Terry Hooper. The Patterson #572 Rig is presently RU on the Hope 5H well drilling the 8 1/2" lateral at a depth of 16,882' to a projected TD of 18,342'. Rig has set the 13 3/8" Surface and 9 5/8" Intermediate casings and cemented same using Schlumberger's CemCrete blend. Both these cement jobs went as planned with good returns to surface. CHK ran CBLs on Surface and Intermediate casing strings. Review of these CBLs showed good cement bonding throughout these casing strings.

- CHK will continue drilling the 5H well to TD prior to skidding to the 6H well. The 20" conductor was set for the 6H well on ~ 1/16/18. - One (1) existing well was present on pad, the Hope 2H. This well has been disconnected from all previous production equipment and has been temporarily shut in, in preparation for drilling new wells on pad. No obvious concerns or violations were noted at time of inspection. Left location at 15:15.

2723064 Primary Facility 2018-04-25 Drilling/Alteration No Violations Noted Arrived on location at: 09:00. Weather: Raining, mild ~ 50 degs. Onsite to check on recent surface casing "SC" cement job performed on the 6H well. - Upon my arrival I met with Chesapeake "CHK" Co. Man, Mickey Brewer. Patterson #572 was RU on the 6H well at time of inspection. Rig has ran and cemented 13 3/8" casing to a depth of 555'. SC cement job was completed at 00:20 this am. Mr. Brewer confirmed that LCM sweeps were successful and SC cement job went well, floats held with ~ 45 bbls good cement returns to surface. Cement fall back was minimal at ~ 11'. Presently, BOP test was underway, being performed by RC Testing.

- Since last inspection, Rig has TD'd the 5H well to a depth of 18,301'. Production casing was set at 18,291' and cemented on 4/23/18. See inspection for 5H well for casing and cementing details. - I reviewed Drillers Logs and Cement Job logs for both wells, all was found in good order. Mr. Brewer also confirmed that a CBL will be ran to assess the SC cement bonding after the Intermediate i

2762733 Primary Facility 2018-08-01 Routine/Complete Inspection No Violations Noted The site was prepared for the commencement of hydraulic fracturing operations. Inspection is related to e-Facts Inspection ID: 2762723. If you have any questions, please contact me.

For data sources see[8]

References