If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-131-20454 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.565717,"lon":-76.142908,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Windham Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 148246 | |
Farm/Lease Name: DPH SE WYO | |
License Status: Inactive | |
Spud Date: 2014-06-09 | |
Permit Date: 2014-06-06 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.565717 | |
Longitude: -76.142908 |
Date | Event |
---|---|
2014-06-06 | New Permit Application |
2014-06-10 | Performed Spud Operation |
2014-07-20 | Drilling Completion |
2015-02-18 | Perforation |
2015-03-10 | Perforation |
2015-03-10 | Performed Stage 1 of Stimulation |
2015-03-10 | Performed Stage 2 of Stimulation |
2015-03-10 | Performed Stage 3 of Stimulation |
2015-03-10 | Performed Stage 4 of Stimulation |
2015-03-10 | Performed Stage 5 of Stimulation |
2015-03-11 | Perforation |
2015-03-11 | Performed Stage 6 of Stimulation |
2015-03-11 | Performed Stage 7 of Stimulation |
2015-03-12 | Perforation |
2015-03-12 | Performed Stage 8 of Stimulation |
2015-03-12 | Performed Stage 9 of Stimulation |
2015-03-13 | Perforation |
2015-03-13 | Performed Stage 10 of Stimulation |
2015-03-13 | Performed Stage 11 of Stimulation |
2015-03-13 | Performed Stage 12 of Stimulation |
2015-03-14 | Perforation |
2015-03-14 | Performed Stage 13 of Stimulation |
2015-03-14 | Performed Stage 14 of Stimulation |
2015-03-14 | Performed Stage 15 of Stimulation |
2015-03-14 | Performed Stage 16 of Stimulation |
2015-03-15 | Perforation |
2015-03-15 | Performed Stage 17 of Stimulation |
2015-03-15 | Performed Stage 18 of Stimulation |
2015-03-15 | Performed Stage 19 of Stimulation |
2015-03-15 | Performed Stage 20 of Stimulation |
2015-03-16 | Perforation |
2015-03-16 | Performed Stage 21 of Stimulation |
2015-03-16 | Performed Stage 22 of Stimulation |
2015-03-16 | Performed Stage 23 of Stimulation |
2015-03-16 | Performed Stage 24 of Stimulation |
2015-03-16 | Performed Stage 25 of Stimulation |
2015-03-16 | Performed Stage 26 of Stimulation |
2015-03-16 | Performed Stage 27 of Stimulation |
2016-04-06 | Inactive Well Request Granted |
2016-05-05 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-03-10 | 2015-03-16 | 8,337 | 7,083,300 | 553,946 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | WIC-641L | WEATHERFORD | Iron Control Agent | Citric Acid | 000077-92-9 | 70 | 0.00566 | 0 |
WAI-251LC | WEATHERFORD | Corrosion Inhibitor | Isopropanol (Isopropyl Alcohol, Propan-2-ol) | 000067-63-0 | 7 | 0.0001 | 0 | |
Branched-Ethoxylated Nonyl Phenol (Branched-Nonyl Phenol Ethoxylate) |
068412-54-4 | 10 | 0.00014 | 0 | ||||
Ethylene Glycol | 000107-21-1 | 60 | 0.00084 | 0 | ||||
Tar bases, quinoline derivs, benzyl chloride-qauternized | 072480-70-7 | 13 | 0.00018 | 0 | ||||
Triethyl Phosphate | 000078-40-0 | 7 | 0.0001 | 0 | ||||
Dimethyl Formamide | 000068-12-2 | 40 | 0.00056 | 0 | ||||
Cinnamaldehyde | 000104-55-2 | 10 | 0.00014 | 0 | ||||
2-Butoxyethanol (Ethylene Glycol Monobutyl Ether) | 000111-76-2 | 7 | 0.0001 | 0 | ||||
Chlorine Dioxide | TERRA SERVICES | Anti-Bacterial Agent | Chlorine Dioxide | 010049-04-4 | 100 | 0.01163 | 0 | |
WFR-61LA | WEATHERFORD | Friction Reducer | Quaternary Ammonium Chloride (Ammonium Chloride) | 012125-02-9 | 7 | 0.00103 | 0 | |
Alcohols ethoxylated C12-16 | 068551-12-2 | 7 | 0.00103 | 0 | ||||
Sodium Chloride | 007647-14-5 | 10 | 0.00147 | 0 | ||||
Petroleum Distillate Hydrotreated Light | 064742-47-8 | 40 | 0.00589 | 0 | ||||
100 Mesh Sand | WEATHERFORD | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 7.55441 | 0 | |
WFR-66LC | WEATHERFORD | Friction Reducer | Petroleum Distillate Hydrotreated Light | 064742-47-8 | 40 | 0.0263 | 0 | |
Sodium Chloride | 007647-14-5 | 20 | 0.01315 | 0 | ||||
ACID, HYDROCHLORIC, 7.5 PCT | WEATHERFORD | Acid | Hydrochloric Acid | 007647-01-0 | 8 | 0.05127 | 0 | |
Water | 007732-18-5 | 93 | 0.63232 | 0 | ||||
TS-15 | TERRA SERVICES | Scale Inhibitor | Proprietary Sodium Polycarboxylate | TRADE SECRET | 100 | 0.00886 | 0 | |
WAI-251LC, WFR-61LA, WFR-66LC, WIC-641L | WEATHERFORD | Corrosion Inhibitor, Friction Reducer, Iron Control Agent | Water | 007732-18-5 | 0 | 0.00572 | 0 | |
Proprietary Friction Reducer Additive (WFR-61LA) | TRADE SECRET | 0 | 0.01282 | 0 | ||||
Non-MSDS Components Not Provided by Supplier | NOT PROVIDED | 0 | 0 | 0 | ||||
Proprietary Ethoxylated Nonylphenol | TRADE SECRET | 0 | 0.00048 | 0 | ||||
Proprietary Alcohol | TRADE SECRET | 0 | 0.00048 | 0 | ||||
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 66.5972 | 0 | |
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 17.5108 | 0 | |
Northern White Sand | WEATHERFORD | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 7.5436 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2015-03-10 | 1 | Sand | 0 | 9,091 | 9,542 |
2015-03-10 | 2 | Sand | 0 | 9,170 | 9,280 |
2015-03-10 | 3 | Wand | 0 | 9,162 | 9,291 |
2015-03-10 | 4 | Sand | 0 | 9,113 | 9,334 |
2015-03-10 | 5 | Sand | 0 | 9,167 | 9,280 |
2015-03-11 | 6 | Sand | 0 | 9,216 | 9,370 |
2015-03-11 | 7 | Sand | 0 | 9,129 | 9,305 |
2015-03-12 | 8 | Sand | 0 | 9,110 | 9,320 |
2015-03-12 | 9 | Sand | 0 | 9,212 | 9,320 |
2015-03-13 | 10 | Sand | 0 | 8,935 | 9,413 |
2015-03-13 | 11 | Sand | 0 | 9,090 | 9,323 |
2015-03-13 | 12 | Sand | 0 | 9,010 | 9,320 |
2015-03-14 | 13 | Sand | 0 | 8,942 | 9,359 |
2015-03-14 | 14 | Sand | 0 | 8,820 | 9,109 |
2015-03-14 | 15 | Sand | 0 | 8,926 | 9,366 |
2015-03-14 | 16 | Sand | 0 | 9,012 | 9,336 |
2015-03-15 | 17 | Sand | 0 | 9,036 | 9,291 |
2015-03-15 | 18 | Sand | 0 | 8,914 | 9,266 |
2015-03-15 | 19 | Sand | 0 | 9,042 | 9,298 |
2015-03-15 | 20 | Sand | 0 | 9,000 | 9,295 |
2015-03-16 | 21 | Sand | 0 | 8,613 | 8,790 |
2015-03-16 | 22 | Sand | 0 | 8,608 | 9,280 |
2015-03-16 | 23 | Sand | 0 | 9,576 | 9,212 |
2015-03-16 | 24 | Sand | 0 | 8,683 | 9,109 |
2015-03-16 | 25 | Sand | 0 | 8,791 | 9,323 |
2015-03-16 | 26 | Sand | 0 | 8,379 | 8,901 |
2015-03-16 | 27 | Sand | 0 | 8,969 | 9,309 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 3,292,224.00 | 178 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 2,526,841.00 | 265 | 0.00 | 0 | 0.00 | 0 |
2018 | CHESAPEAKE APPALACHIA LLC | 1,739,094.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 1,322,678.00 | 346 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CHESAPEAKE APPALACHIA LLC | Drill Cuttings | 285.90 Tons | LANDFILL | 8-4630-00010/00 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 70.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHESAPEAKE APPALACHIA LLC | Drill Cuttings | 562.07 Tons | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR097R017 |
2014 | CHESAPEAKE APPALACHIA LLC | Drill Cuttings | 47.91 Tons | LANDFILL | THR029 |
2014 | CHESAPEAKE APPALACHIA LLC | Drill Cuttings | 250.97 Tons | LANDFILL | 8-0728-0004/013 |
2015 | CHESAPEAKE APPALACHIA LLC | General O&G waste not covered by other waste types | 7.86 Tons | LANDFILL | THR029 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 256.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 42.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 45.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 186.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 70.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC008 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 65.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 56.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 37.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2016 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 8.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2016 | CHESAPEAKE APPALACHIA LLC | Fracturing Fluid Waste | 133.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 15.33 Tons | LANDFILL | 301626 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 779.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Synthetic Liner Materials | 1.17 Tons | LANDFILL | 8-0728-0004/013 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 36.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | CHESAPEAKE APPALACHIA LLC | Synthetic Liner Materials | 2.00 Tons | CENT WASTE TRT FAC NPDES DISCHARGE | PAG034815 |
2017 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 6.20 Tons | LANDFILL | 301626 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 147.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 418.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2017 | CHESAPEAKE APPALACHIA LLC | Synthetic Liner Materials | 2.00 Tons | CENT WASTE TRT FAC NPDES | PAG034815 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 40.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 929.40 Bbl | REUSE (AT WELL PAD) | |
2017 | CHESAPEAKE APPALACHIA LLC | Synthetic Liner Materials | 8.00 Tons | LANDFILL | 8-0728-0004/013 |
2017 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 152.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 132.00 Bbl | REUSE (AT WELL PAD) | |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 21.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2018 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 3.08 Tons | LANDFILL | 301626 |
2018 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 39.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 41.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 0.71 Tons | LANDFILL | 301626 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 40.90 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2289065 | Primary Facility | 2014-07-23 | Drilling/Alteration | No Violations Noted | |
2301613 | Primary Facility | 2014-09-05 | Routine/Complete Inspection | No Violations Noted | |
2303481 | Primary Facility | 2014-09-12 | Administrative/File Review | No Violations Noted | This administrative inspection has been created to document Chesapeake’s remediation of the small spill which occurred on the DPH Pad documented in the DPH S Wyo 5H 6-5-14 inspection report; inspection record #2277814. A review of the remediation summary report submitted by Chesapeake indicates that the remediation was adequate. No further action is required of Chesapeake at this time. |
2303571 | Primary Facility | 2014-09-09 | Routine/Complete Inspection | Pending | |
2304228 | Primary Facility | 2014-09-10 | Incident- Response to Accident or Event | No Violations Noted | Arrived at the site at 13:00 to conduct a follow up inspection based on a reported (20) gallon spill of synthetic oil based drilling mud. We observed dark staining at the bottom of the excavation where the ground surface was observed to be impacted. Part of the concrete containment pad for the wells had to be jackhammered in order to assess ground surface below it. The synthetic oil based drilling mud also impacted the production/vent lines that connect from the wells to the production equipment on the site. Dark staining of the pad surface was discovered on the south side of the wellhead pad area as Chesapeake was pulling the liner. The synthetic oil based drilling mud was noted to be spilled to the drilling rig secondary containment liner. Apparently, the synthetic oil based drilling mud impacted the pad surface and subsurface due to compromised liner integrity. The liner is a (130) mil liner supplied by New Pig Energy Corporation. |
2360084 | Primary Facility | 2015-04-09 | Routine/Complete Inspection | No Violations Noted | |
2480069 | Primary Facility | 2016-04-18 | Routine/Complete Inspection | No Violations Noted | |
2648119 | Primary Facility | 2017-10-06 | Routine/Complete Inspection | No Violations Noted | Arrived on location at: 11:30. Weather: Overcast, mild ~ 65 degs. There are a total of (5) wells on this pad. The DPH SW Wyo 4H, DPH SE Wyo 2H, DPH NW Wyo 4H, DPH NE 1H and DPH S Wyo 5H. Inspection of wells showed: All (5) wells were producing at time of inspection. All wells production pressures were being monitored by SCADA press. monitor units at production tree top and on production lines. All wells (13x9) and (9x5) annuli have been plumbed to surface and were tied into a common 2" vent line to production tanks. The (13x9) vents were open and venting w/ SCADA press. monitors. The (9x5) vents were shut in to SCADA press. monitors. All wells (5/P) prod. csg annuli were shut in to SCADA press. monitors and/or analog gauges. (See individual well inspection reports for pressures and further well info.)
-The DPH SE Wyo 2H wells Prod. Tree top press. = 1182psi., Production line press. = 1153 psi. It appears this well is producing through prod casing. No obvious concerns were noted at time of inspection. -Overa |
2784629 | Primary Facility | 2018-09-26 | Routine/Complete Inspection | No Violations Noted | The Department arrived on site at 1330 to perform a routine complete inspection of the pad.Present representing the Department was Brad Kline (WQS), Briana Cunningham (WQS Supervisor) and myself.
While examining the E&S inspection log, we noticed that very few inspections have been performed since the beginning of September. Considering that, according to the National Weather Service website, there have been several significant rain events on dates not listed on the inspection log, the Department requests that the Operator determine if any rainfall events have occurred since 9/1/2018 according to their records (aside from the dates listed on the log above) and provide the Department with post-rainfall inspection reports from those dates, or alternatively provide documentation that no rainfall events occurred on the dates between the weekly inspections. Pad surface and access road stable and well maintained. Site is well vegetated and stable, with the exception of the topsoil pile pictured in photo 5, whic |
2847310 | Primary Facility | 2019-02-21 | Site Restoration | No Violations Noted | I arrived onsite at 1405 to conduct a site restoration inspection of the pad. The weather was mostly sunny and mild at approximately 45 degrees F and a slight breeze with no precipitation.
After reviewing the site restoration plan available in the mailbox, it appears that site conditions do not match the restoration plan. Namely, some areas of the site contain exposed erodible material, and therefore have not attained permanent stabilization, as called for in Section G of the post-drilling site restoration report. Operator, please inspect the aforementioned areas and determine whether they should be reseeded/mulched. No violations were noted. Please feel free to contact me with any questions. |
For data sources see[9]