X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-131-20421

Well Details

Well ID: 37-131-20421
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Washington Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 148860
Farm/Lease Name: MCGRAW N WYO 1H
License Status: INACTIVE
Spud Date:
Permit Date: 2014-03-28
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.639275
Longitude: -75.973367

For data sources see[1][2][3]

Well History

Date Event
2014-03-28 New Permit Application
2014-05-30 Performed Spud Operation
2014-07-06 Drilling Completion
2016-05-05 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-01-14 2015-01-25 7,570 7,599,140 583,416

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 WAI-251LC WEATHERFORD Corrosion Inhibitor Triethyl Phosphate 000078-40-0 7 0.00008000 0
Cinnamaldehyde 000104-55-2 10 0.00011 0
Dimethyl Formamide 000068-12-2 40 0.00044 0
Isopropanol (Isopropyl Alcohol, Propan-2-ol) 000067-63-0 7 0.00008000 0
Branched-Ethoxylated Nonyl Phenol
(Branched-Nonyl Phenol Ethoxylate)
068412-54-4 10 0.00011 0
Ethylene Glycol 000107-21-1 60 0.00066 0
Tar bases, quinoline derivs, benzyl chloride-qauternized 072480-70-7 13 0.00014 0
2-Butoxyethanol (Ethylene Glycol Monobutyl Ether) 000111-76-2 7 0.00008000 0
WFR-61LA WEATHERFORD Friction Reducer Alcohols ethoxylated C12-16 068551-12-2 7 0.00428 0
Sodium Chloride 007647-14-5 10 0.00611 0
Petroleum Distillate Hydrotreated Light 064742-47-8 40 0.02444 0
Quaternary Ammonium Chloride (Ammonium Chloride) 012125-02-9 7 0.00428 0
Chlorine Dioxide TERRA SERVICES Anti-Bacterial Agent Chlorine Dioxide 010049-04-4 100 0.00975 0
100 Mesh Sand WEATHERFORD Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 7.5991 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 8.81188 0
ACID, HYDROCHLORIC, 7.5 PCT WEATHERFORD Acid Hydrochloric Acid 007647-01-0 8 0.04022 0
Water 007732-18-5 93 0.49602 0
TS-15 TERRA SERVICES Scale Inhibitor Proprietary Sodium Polycarboxylate TRADE SECRET 100 0.00909 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 75.338 0
WAI-251LC, WFR-61LA, WFR-65LA, WIC-641L WEATHERFORD Corrosion Inhibitor, Friction Reducer, Iron Control Agent Proprietary Friction Reducer Additive (WFR-61LA) TRADE SECRET 0 0.05327 0
Proprietary Alcohol TRADE SECRET 0 0.00038 0
Proprietary Friction Reducer Additive TRADE SECRET 0 0.01618 0
Proprietary Ethoxylated Nonylphenol TRADE SECRET 0 0.00038 0
Water 007732-18-5 0 0.00452 0
WFR-65LA WEATHERFORD Friction Reducer Ammonium Acetate 000631-61-8 5 0.00083 0
Petroleum Distillate Hydrotreated Light 064742-47-8 40 0.00662 0
WIC-641L WEATHERFORD Iron Control Agent Citric Acid 000077-92-9 70 0.00448 0
Northern White Sand WEATHERFORD Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 7.52809 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHESAPEAKE APPALACHIA LLC 3,640,947.00 200 0.00 0 0.00 0
2017 CHESAPEAKE APPALACHIA LLC 2,522,185.00 357 0.00 0 0.00 0
2018 CHESAPEAKE APPALACHIA LLC 1,271,963.00 345 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 1,047,651.00 357 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CHESAPEAKE APPALACHIA LLC Drill Cuttings 184.80 Tons LANDFILL 8-4630-00010/00
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 20.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2014 CHESAPEAKE APPALACHIA LLC Drilling Fluid Waste 932.05 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 76.82 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHESAPEAKE APPALACHIA LLC Drill Cuttings 578.88 Tons RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR097R017
2014 CHESAPEAKE APPALACHIA LLC Drill Cuttings 69.75 Tons LANDFILL THR029
2014 CHESAPEAKE APPALACHIA LLC Drill Cuttings 315.33 Tons LANDFILL 8-0728-0004/013
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 159.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 25.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 175.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 CHESAPEAKE APPALACHIA LLC Fracturing Fluid Waste 131.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 CHESAPEAKE APPALACHIA LLC Soil Contaminated by Oil 3.17 Tons LANDFILL 301626
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 115.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 45.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 34.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 11.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 CHESAPEAKE APPALACHIA LLC Soil Contaminated by Oil & Gas Related Spills 3.17 Tons LANDFILL 301626
2016 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 39.46 Tons LANDFILL 301626
2016 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 173.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 347.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 0.45 Tons LANDFILL 8-0728-0004/013
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 28.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 5.00 Tons CENT WASTE TRT FAC NPDES DISCHARGE PAG034815
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 115.55 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 22.00 Bbl REUSE (AT WELL PAD)
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 47.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2017 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 5.00 Tons CENT WASTE TRT FAC NPDES PAG034815
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 28.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 66.30 Bbl REUSE (AT WELL PAD)
2018 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 8.19 Tons LANDFILL 301626
2018 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 0.70 Tons LANDFILL 8-0728-0004/013
2018 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 29.00 Bbl REUSE (AT WELL PAD)
2018 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 1.30 Tons CENT WASTE TRT FAC NPDES DISCHARGE PAG034815
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 542.40 Bbl REUSE (AT WELL PAD)
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 207.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 48.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 1.30 Tons CENT WASTE TRT FAC NPDES PAG034815
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 35.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 2.40 Tons LANDFILL 301626
2019 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 82.87 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 540.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 95.85 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2283469 Primary Facility 2014-06-27 Drilling/Alteration No Violations Noted
2284295 Primary Facility 2014-06-11 Drilling/Alteration No Violations Noted Conductor set at 58'
2337931 Primary Facility 2015-01-20 Follow-up Inspection No Violations Noted
2348629 Primary Facility 2015-02-18 Follow-up Inspection No Violations Noted Chesapeake was in the process of breaking down secondary containment and washing rig mats. I recorded a conductivity reading of (3.59) milliSiemens/cm in water on containment on the western side of the pad near the cut slope. A vacuum truck operator was in the process of removing water on containment nearby area where the elevated conductivity was recorded. I pointed out to him the where the water with the elevated conductivity was. He claimed he would remove all of the water on containment. I recorded (3.62) milliSiemens/cm conductivity in water on the pad surface next to a heating unit and frac tank used to contain water to wash the rig mats. Mr. Wilkes informed that the water with the elevated conductivity readings off containment will be removed via and on-site vacuum truck.
2349425 Primary Facility 2015-02-26 Follow-up Inspection No Violations Noted Chesapeake was in the process of breaking down secondary containment, washing rig mats and removing snow and ice on containment. Mr. Krut informed me of a crack in the poly urea encompassing the perimeter of the 1H wellhead. The wellheads are contained with a cement apron. The cement below the poly urea on the 1H well is not compromised according to Mr. Krut. Due to the crack in the poly urea, Leidos Engineering performed soil conductivity screening on the pad surface around the perimeter of the cement apron on 2/25/15. Mr. Krut indicated that Leidos collected a total of (6) EC screenings/. The highest reading was (628) microSiemens/cm. Background soil conductivity readings, which were collected in the Northeast corner of the Pad, were (301) microSiemens/cm according to Mr. Krut. The Department did not observe staining/visibly impacted soils on the pad surface near the cement apron; N 41°38’22”; W-75°58’24”.
2349578 Primary Facility 2015-03-05 Administrative/File Review No Violations Noted This administrative inspection has been created to document Chesapeake’s discovery of soil conductivity screening readings above background levels on 2/26/15. On 3/2/15, Nick Krut, Environmental Representative of Chesapeake submitted an Electrical Conductivity Screening Summary Map for the McGraw Wyo Pad. Leidos Engineering performed soil conductivity screening at the site on 2/26/15. Due to soil conductivity readings elevated above background levels, the Department requested Chesapeake collect a sample in the area that exhibited the conductivity reading of (637) microSiemens/cm to verify the presence or absence of potentially impacted pad surface material. The Department requested the sample be analyzed for flowback/production fluid parameters. Chesapeake has agreed to collect a sample based on the Department’s request.
2349631 Primary Facility 2015-03-06 Follow-up Inspection No Violations Noted Chesapeake was in the process of attempting to return the McGraw 2H and McGraw 5H wells into production. Mr. Krut contacted me on 3-5-15 regarding the removal of all of the secondary containment used for hydraulic fracturing operations. The containment was completely removed from the site on 3-4-15. It has taken several weeks to remove the containment from the site due to the weather, according to Mr. Krut. The department did not observe any signs of contamination of the pad surface where the containment was staged. The majority of the pad surface was snow covered from the most recent snowfall event.
2359216 Primary Facility 2015-04-08 Administrative/File Review No Violations Noted This administrative inspection has been created to document Chesapeake’s submittal of a report to the Department on 4/2/15 containing a datatable and sample results of a sample collected by Chesapeake’s contractor, Leidos Engineering at the McGraw well Pad on 3/11/15 in response to the release of approximately (750) barrels of proppant laden fluid on containment on January 19, 2015, and elevated field electrical conductivity (EC) screenings, conducted by Leidos, on February 25, 2015 documented in the McGraw 3/5/15 inspection report. The Department has concluded that there are no technical deficiencies in the report containing the data table and sampling results and no further action is warranted at this time at the McGraw well pad in the area where the proppant laden fluid was released to containment and the field electrical conductivity screening readings were detected at levels slightly above background.
2472334 Primary Facility 2016-04-07 Routine/Complete Inspection No Violations Noted
2478658 Primary Facility 2016-04-25 Routine/Complete Inspection No Violations Noted
2692764 Primary Facility 2018-02-01 Routine/Partial Inspection No Violations Noted Onsite in follow-up to citizens report of activity occurring on pad. Upon arrival: Weather: Clear, cold, ~20 degs. (5) wells are present on this pad. The 1H, 2H, 3H & 5H were Producing. The 4H well head was being prepped for Stimulation. Weir Energy hands were onsite replacing the production tree of 4H with a 10K master valve. I spoke with CALLC's Completions WSS, Brian Heffron onsite. Mr. Heffron mentioned that the (4) producing wells would remain in production until the the Completions equipment was being mobilized to pad, which he thought would be several weeks. Access was limited to well area due to work being performed on pad. No obvious concerns or violations were noted at time of inspection.
2708602 Primary Facility 2018-03-22 Routine/Complete Inspection No Violations Noted Hydraulic fracturing operations have recently concluded. CHK Personnel were prepping well (4H) for production. No violations noted. If you have any questions, please contact me.

For data sources see[8]

References