37-131-20215

Well Details

Well ID: 37-131-20215
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Meshoppen Township
Operator Name: BKV OPR LLC
Well Pad ID: 149172
Farm/Lease Name: MANNING UNIT REIMILLER 1 MANNING 1H
License Status:
Spud Date: 2012-12-02
Permit Date: 2011-09-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.597499
Longitude: -76.038123

For data sources see[1][2][3]

Well History

Date Event
2011-09-16 New Permit Application
2012-02-27 Performed Spud Operation
2012-12-23 Drilling Completion
2013-05-27 Perforation
2013-06-19 Performed Stimulation
2014-01-30 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-06-19 2013-07-19 7,488 8,270,680

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCL FTS Acid Hydrochloric acid 7647-01-0 37 0.339401 0
ICI-3240 FTS Bacteriacide Dazomet 533-74-4 24 0.009949 0
Sodium Hydroxide 1310-73-2 4 0.001658 0
CS 500SI FTS Scale Inhibitor Ethylene Glycol 107-21-1 10 0.001666 0
Water FTS carrier H2O 7732-18-5 100 86.212 0
ShaleSurf 1000 FTS Surfactant 2-Propanol 67-63-0 10 0.008288 0
Ethoxylated alcohol Proprietary 20 0.016576 0
2-Butoxyethanol 111-76-2 10 0.008288 0
Cyclohexene 5989-27-5 10 0.008288 0
Methanol 67-56-1 10 0.008288 0
FRW-600 FTS Friction Reducer Ammonium acetate 631-61-8 6 0.002118 0
Hydrotreated Light Distillate 64742-47-8 30 0.010592 0
Sand FTS Proppant Silica 14808-60-7 99.9 13.597 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2013-06-19 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CITRUS ENERGY CORP 0.00 0 0.00 0 0.00 0
2012 CITRUS ENERGY CORP 0.00 0 0.00 0 0.00 0
2013 CITRUS ENERGY CORP 934,928.00 73 0.00 0 0.00 0
2014 WARREN E & P INC 2,806,740.86 360 0.00 0 0.00 0
2015 WARREN E & P INC 1,654,348.53 339 0.00 0 0.00 0
2016 WARREN E & P INC 1,166,623.73 366 0.00 0 0.00 0
2017 WARREN E & P INC 1,239,243.77 363 0.00 0 0.00 0
2018 BKV OPR LLC 1,076,790.26 363 0.00 0 0.00 0
2019 BKV OPR LLC 928,433.48 348 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CITRUS ENERGY CORP Drill Cuttings 1,173.00 Tons LANDFILL THR029
2013 CITRUS ENERGY CORP Fracing Fluid Waste 2,289.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CITRUS ENERGY CORP Drill Cuttings 477.00 Tons LANDFILL THR029
2014 WARREN E & P INC Produced Fluid 290.52 Bbl STORAGE PENDING DISPOSAL OR REUSE
2014 WARREN E & P INC Fracturing Fluid Waste 7.80 Tons LANDFILL THR029
2014 CITRUS ENERGY CORP Produced Fluid 1,533.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 WARREN E & P INC Drill Cuttings 9.20 Tons LANDFILL THR029
2015 WARREN E & P INC Produced Fluid 365.51 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 WARREN E & P INC Produced Fluid 476.30 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 WARREN E & P INC Other Oil & Gas Wastes 21.48 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 WARREN E & P INC Other Oil & Gas Wastes 104.58 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 WARREN E & P INC Synthetic Liner Materials 0.50 Tons LANDFILL THR029
2016 WARREN E & P INC Other Oil & Gas Wastes 33.77 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 WARREN E & P INC Produced Fluid 213.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 WARREN E & P INC Produced Fluid 229.14 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 WARREN E & P INC Produced Fluid 230.79 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 WARREN E & P INC Other Oil & Gas Wastes 1.10 Tons LANDFILL THR029
2017 WARREN E & P INC Other Oil & Gas Wastes 62.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 WARREN E & P INC Other Oil & Gas Wastes 11.67 Bbl REUSE (AT WELL PAD)
2017 WARREN E & P INC Produced Fluid 529.39 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 WARREN E & P INC Produced Fluid 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2017 WARREN E & P INC Produced Fluid 283.66 Bbl REUSE (AT WELL PAD)
2018 BKV OPR LLC Synthetic Liner Materials 1.31 Tons LANDFILL 101247
2018 WARREN E & P INC Produced Fluid 149.07 Bbl REUSE (AT WELL PAD)
2018 WARREN E & P INC Other Oil & Gas Wastes 44.16 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 BKV OPR LLC Produced Fluid 20.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 WARREN E & P INC Produced Fluid 985.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 BKV OPR LLC Produced Fluid 70.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2019 BKV OPR LLC Waste Water Treatment Sludge 2.76 Tons RESIDUAL WASTE TRANSFER FACILITY 101714
2019 BKV OPR LLC Synthetic Liner Materials 11.17 Tons RESIDUAL WASTE TRANSFER FACILITY 101714
2019 BKV OPR LLC Produced Fluid 1,626.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 BKV OPR LLC Produced Fluid 36.67 Bbl REUSE (AT WELL PAD)
2019 BKV OPR LLC Synthetic Liner Materials 0.34 Tons LANDFILL 100933
2019 BKV OPR LLC Produced Fluid 71.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2112200 Primary Facility 2012-10-24 Routine/Complete Inspection Pending 20" cond has been set. No well tag.
2121529 Primary Facility 2012-12-04 Drilling/Alteration No Violations Noted Patterson 252, Comp. Man - Dale Barnett, @ 800'
2123720 Primary Facility 2012-12-14 Drilling/Alteration No Violations Noted Patterson 252, Comp. Man - Jacob Oettel, drilling @ 6526'
2140048 Primary Facility 2013-02-13 Routine/Complete Inspection No Violations Noted Well needs more permanent well tag.
2332074 Primary Facility 2014-12-29 Incident- Response to Accident or Event No Violations Noted Arrived at the site at 14:15 in response to an estimated (3.5) gallon spill of production fluid. Heather Burkhart and Kayla Saxon of Warren E&P accompanied me during the inspection. While at the site, Ms. Saxon explained that the spill occurred in the morning hours of 12/19/14 as a vacuum truck was in the process of backing up in preparation to offload production fluid from a frac tank in the tank battery. The truck driver noticed fluid spraying on the pad surface as he was backing up. The spill occurred as a result of a valve failing due to mechanical malfunction from the the scrubber to the muffler line on the truck. Residuals from the truck hose leaked onto the pad surface. The dimesions of the impacted area of the pad surface are (8.5-9.5) in length and (5) feet in width according to Ms. Saxon. Ms. Burkhart and Ms. Saxon informed me that the spill had been cleaned up and backfilled with fresh rock the day it occurred. There is no visual evidence of an impact to the pad surface where the release occurred.
2332077 Primary Facility 2014-12-29 Incident- Response to Accident or Event No Violations Noted Arrived at the site at 14:15 in response to an estimated (3.5) gallon spill of production fluid. Heather Burkhart and Kayla Saxon of Warren E&P accompanied me during the inspection. While at the site, Ms. Saxon explained that the spill occurred in the morning hours of 12/19/14 as a vacuum truck was in the process of backing up in preparation to offload production fluid from a frac tank in the tank battery. The truck driver noticed fluid spraying on the pad surface as he was backing up. The spill occurred as a result of a valve failing due to mechanical malfunction from the the scrubber to the muffler line on the truck. Residuals from the truck hose leaked onto the pad surface. The dimesions of the impacted area of the pad surface are (8.5-9.5) in length and (5) feet in width according to Ms. Saxon. Ms. Burkhart and Ms. Saxon informed me that the spill had been cleaned up and backfilled with fresh rock the day it occurred. There is no visual evidence of an impact to the pad surface where the release occurred.
2430040 Primary Facility 2015-11-17 Routine/Complete Inspection No Violations Noted A vacuum truck was in the process of unloading fluid from a frac tank on containment in the tank battery near the pad entrance. The fluid in this tank is either flowback or production fluid from the wells on the pad or a mixture of both. We used an Oakton MultiParameter PCSTester 35, Extech, ExStik2, and a Hanna Soil Test and Electrical Conductivity & Temperature meter to screen the water in the Production Fluid Storage Tanks and Gas Production Unit containment. Conductivity readings were in the range of (400-500) microSiemens/cm³ in water inside the production fluid tanks containment and (200-300) microSiemens/cm³ in water inside the GPU containment. The pH was around 8.4.
2513481 Primary Facility 2016-08-23 Routine/Complete Inspection No Violations Noted
2605136 Primary Facility 2017-05-30 Routine/Complete Inspection No Violations Noted I arrived at the location at 13:00. There was no activity or personnel at the site during the inspection. The weather conditions were cloudy skies with breezy conditions and temperatures in the low 60's. Rain had just ended. The Manning 1H, Reimiller 1H and Reynolds 1H wells are in production. I left the location at 13:45.

For data sources see[9]

References