Well ID: 37-131-20081 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.583365,"lon":-76.019718,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Washington Township | |
Operator Name: BKV OPR LLC | |
Well Pad ID: 149228 | |
Farm/Lease Name: RUARK SOUTH UNIT RUARK EAST 1 RUARK SOUT | |
License Status: | |
Spud Date: 2010-09-10 | |
Permit Date: 2010-08-26 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.583365 | |
Longitude: -76.019718 |
Date | Event |
---|---|
2010-08-26 | New Permit Application |
2010-09-28 | Performed Spud Operation |
2010-11-05 | Drilling Completion |
2011-04-19 | Perforation |
2011-04-19 | Performed Stimulation |
2012-06-13 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-04-19 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CITRUS ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CITRUS ENERGY CORP | 911,337.00 | 115 | 0.00 | 0 | 0.00 | 0 |
2012 | CITRUS ENERGY CORP | 1,288,546.00 | 339 | 0.00 | 0 | 0.00 | 0 |
2013 | CITRUS ENERGY CORP | 816,450.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | WARREN E & P INC | 830,563.24 | 313 | 0.00 | 0 | 0.00 | 0 |
2015 | WARREN E & P INC | 630,462.00 | 301 | 0.00 | 0 | 0.00 | 0 |
2016 | WARREN E & P INC | 576,500.87 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | WARREN E & P INC | 363,854.30 | 363 | 0.00 | 0 | 0.00 | 0 |
2018 | BKV OPR LLC | 240,765.22 | 352 | 0.00 | 0 | 0.00 | 0 |
2019 | BKV OPR LLC | 174,765.68 | 351 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CITRUS ENERGY CORP | Produced Fluid | 704.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2011 | CITRUS ENERGY CORP | Fracing Fluid Waste | 212.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CITRUS ENERGY CORP | Produced Fluid | 334.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | WARREN E & P INC | Produced Fluid | 100.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2014 | CITRUS ENERGY CORP | Produced Fluid | 275.74 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | WARREN E & P INC | Produced Fluid | 165.40 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 184.13 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 37.86 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | WARREN E & P INC | Produced Fluid | 53.94 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 98.84 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | WARREN E & P INC | Produced Fluid | 195.54 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | WARREN E & P INC | Produced Fluid | 152.90 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | WARREN E & P INC | Other Oil & Gas Wastes | 14.36 Tons | LANDFILL | THR029 |
2017 | WARREN E & P INC | Other Oil & Gas Wastes | 79.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | WARREN E & P INC | Produced Fluid | 966.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | WARREN E & P INC | Produced Fluid | 74.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2017 | WARREN E & P INC | Produced Fluid | 629.23 Bbl | REUSE (AT WELL PAD) | |
2018 | BKV OPR LLC | Produced Fluid | 37.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2018 | WARREN E & P INC | Produced Fluid | 149.56 Bbl | REUSE (AT WELL PAD) | |
2018 | WARREN E & P INC | Other Oil & Gas Wastes | 100.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | WARREN E & P INC | Produced Fluid | 1,131.64 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | BKV OPR LLC | Waste Water Treatment Sludge | 0.20 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2019 | BKV OPR LLC | Produced Fluid | 73.34 Bbl | REUSE (AT WELL PAD) | |
2019 | BKV OPR LLC | Produced Fluid | 73.34 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2019 | BKV OPR LLC | Synthetic Liner Materials | 2.46 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101714 |
2019 | BKV OPR LLC | Produced Fluid | 878.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1920170 | Primary Facility | 2010-10-14 | Drilling/Alteration | No Violations Noted | |
1922369 | Primary Facility | 2010-10-25 | Drilling/Alteration | No Violations Noted | Fishing job at 7300 ft., cement back to 6700 ft. |
1926598 | Primary Facility | 2010-11-03 | Drilling/Alteration | No Violations Noted | Cemented production string yesterday. Rigging down. Cemented with 562 bbls of cement. Had 83 bbls return on prod. string job. No violations observed. |
1968704 | Primary Facility | 2011-04-25 | Routine/Complete Inspection | No Violations Noted | On site insp of flowback pit & review copy of site PPC plan. Universal Well Services in the process of perfoming fracing operations. PPC plan is not on site. There were no violations observed in the flowback pit. PPC plan provided adequately w/in 7 days. |
1977981 | Primary Facility | 2011-06-02 | Follow-up Inspection | No Violations Noted | Fracing and flowback procedures have been completed within the last few weeks. Citrus Energy was in the process of setting up for the production phase of operations. I observed a small tear on the top level of the liner in a relatively close proximity to the well heads. The pit clearly meets the 2 feet freeboard requirement. The flowback water level was three (3) feet away from the tear. The underlying liner was not noted to be compromised directly below the tear. Mr. Matthews informed that the tear in the liner will be repaired immediately. |
1985807 | Primary Facility | 2011-07-05 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
1990949 | Primary Facility | 2011-07-28 | Follow-up Inspection | No Violations Noted | |
1990955 | Primary Facility | 2011-06-16 | Routine/Complete Inspection | Violation(s) Noted | |
2033252 | Primary Facility | 2012-01-12 | Complaint Inspection | No Violations Noted | Department requests evaluation of well cement and casing integrity. |
2035161 | Primary Facility | 2012-01-19 | Administrative/File Review | No Violations Noted | Teleconference with Citrus Energy regarding integrity inspection. |
2084596 | Primary Facility | 2012-07-13 | Routine/Complete Inspection | No Violations Noted | Aztec 266, Comp. Man - Rick Davidson |
2250662 | Primary Facility | 2014-02-26 | Administrative/File Review | No Violations Noted | |
2351679 | Primary Facility | 2015-03-13 | Routine/Complete Inspection | No Violations Noted | |
2354983 | Primary Facility | 2015-03-25 | Routine/Complete Inspection | No Violations Noted | |
2392384 | Primary Facility | 2015-07-24 | Routine/Partial Inspection | No Violations Noted | |
2429755 | Primary Facility | 2015-11-17 | Routine/Complete Inspection | No Violations Noted | There was no activity at the site as we arrived around 12:00. We used an Oakton MultiParameter PCSTester 35 and a Hanna Soil Test and Electrical Conductivity & Temperature meter to screen the water in the Production Fluid Storage Tanks and Gas Production Unit containment. Conductivity readings were in the range of (700-800) microSiemens/cm in water inside the production fluid tanks containment and less than (500) microSiemens/cm in water inside the GPU containment. We collected a water sample using the PADEP Bureau of Labs Standard Analysis Code 046 in the production fluid tanks containment at N-41.58295; W-076.01905. The parameters to be analyzed are listed in the Department's 11-17-15 Macialek inspection report. The intent of screening the water for conductivity and collecting the sample is to determine if the water meets the requirements of PA Title 25, Section 78.60 and Warren's SOP in the event this containment water will be discharged to stormwater controls on-site. |
2430861 | Primary Facility | 2015-12-08 | Administrative/File Review | No Violations Noted | Attached are the sample results of the water sample collected in the Production Fluid Storage Tank Containment Area as indicated in the 11/17/15 inspection report. The sample results were submitted with the inspection report. |
2500409 | Primary Facility | 2016-07-01 | Routine/Complete Inspection | No Violations Noted | |
2502823 | Primary Facility | 2016-07-20 | Administrative/File Review | In Compliance with Policy | |
2739594 | Primary Facility | 2018-06-07 | Routine/Complete Inspection | Pending | At the time of the inspection Stone Well Service’s Workover Rig 2 was pulling tubing at the Ruark South Unit Ruark East 1 Ruark South 2H (131-20081). At the start of my inspection, I met with Gary Gerard of BKV. I conducted the inspection accompanied by Mr. Gerard. Based on the circumstances described in the findings of this report, I will conduct a Follow-Up Inspection to confirm or deny an incident of a pollution-causing substance (contaminated storm-water) had contacted the well pad surface (constructed of a permeable material) and/or the suspected substance (contaminated storm-water) had been adequately removed and disposed of in a proper manner. The Follow-Up Inspection will be conducted following the conclusion operations and preferably at the time the secondary containment is recovered. Please provide notification for when this may occur and I will attempt to coordinate an on-site visit at the time. If you have any questions, please contact me. |
2744918 | Primary Facility | 2018-06-13 | Routine/Complete Inspection | No Violations Noted | I arrived at the site at 12:40. The weather conditions are cloudy skies and breezy with temperatures around 70 degrees Fahrenheit. There was no activity at the site. There are (3) wells at the site in the production phase, Ruark East 1H, Ruark East- Ruark South 2H, and Ruark East 11 H. I initially met with Sean Bonnice, and Cory Bradley, well pumpers of J.P. Reilly & Associates. Mr. Bonnice provided me with the following information. "A Service Rig recently moved to the BKV Macialek pad and it is currently on the BKV Mattocks pad. At the end of production tubing, which is at the end of the curve, around (7,000) feet in depth, tubing was pulled to change an x-nipple and to remove a perforated sub. Lubricators have been installed on all (3) wells. The next step is to install plungers on the wells." Matt Mercaldo, contractor manager, and Gavin Chilson, automation specialist both of BKV arrived during my conversation with the Reilly personnel. Mr. Mercaldo provided me with the following information. "The |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1990955 | 616340 | 06/16/2011 | 2011-06-16 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety |