X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-131-20081

Well Details

Well ID: 37-131-20081
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Washington Township
Operator Name: BKV OPR LLC
Well Pad ID: 149228
Farm/Lease Name: RUARK SOUTH UNIT RUARK EAST 1 RUARK SOUT
License Status:
Spud Date: 2010-09-10
Permit Date: 2010-08-26
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.583365
Longitude: -76.019718

For data sources see[1][2][3]

Well History

Date Event
2010-08-26 New Permit Application
2010-09-28 Performed Spud Operation
2010-11-05 Drilling Completion
2011-04-19 Perforation
2011-04-19 Performed Stimulation
2012-06-13 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2011-04-19 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CITRUS ENERGY CORP 0.00 0 0.00 0 0.00 0
2011 CITRUS ENERGY CORP 911,337.00 115 0.00 0 0.00 0
2012 CITRUS ENERGY CORP 1,288,546.00 339 0.00 0 0.00 0
2013 CITRUS ENERGY CORP 816,450.00 365 0.00 0 0.00 0
2014 WARREN E & P INC 830,563.24 313 0.00 0 0.00 0
2015 WARREN E & P INC 630,462.00 301 0.00 0 0.00 0
2016 WARREN E & P INC 576,500.87 365 0.00 0 0.00 0
2017 WARREN E & P INC 363,854.30 363 0.00 0 0.00 0
2018 BKV OPR LLC 240,765.22 352 0.00 0 0.00 0
2019 BKV OPR LLC 174,765.68 351 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CITRUS ENERGY CORP Produced Fluid 704.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2011 CITRUS ENERGY CORP Fracing Fluid Waste 212.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CITRUS ENERGY CORP Produced Fluid 334.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 WARREN E & P INC Produced Fluid 100.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2014 CITRUS ENERGY CORP Produced Fluid 275.74 Bbl REUSE OTHER THAN ROAD SPREADING
2015 WARREN E & P INC Produced Fluid 165.40 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 WARREN E & P INC Other Oil & Gas Wastes 184.13 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 WARREN E & P INC Other Oil & Gas Wastes 37.86 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 WARREN E & P INC Produced Fluid 53.94 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 WARREN E & P INC Other Oil & Gas Wastes 98.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 WARREN E & P INC Produced Fluid 195.54 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 WARREN E & P INC Produced Fluid 152.90 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 WARREN E & P INC Other Oil & Gas Wastes 14.36 Tons LANDFILL THR029
2017 WARREN E & P INC Other Oil & Gas Wastes 79.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 WARREN E & P INC Produced Fluid 966.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 WARREN E & P INC Produced Fluid 74.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2017 WARREN E & P INC Produced Fluid 629.23 Bbl REUSE (AT WELL PAD)
2018 BKV OPR LLC Produced Fluid 37.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2018 WARREN E & P INC Produced Fluid 149.56 Bbl REUSE (AT WELL PAD)
2018 WARREN E & P INC Other Oil & Gas Wastes 100.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 WARREN E & P INC Produced Fluid 1,131.64 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 BKV OPR LLC Waste Water Treatment Sludge 0.20 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2019 BKV OPR LLC Produced Fluid 73.34 Bbl REUSE (AT WELL PAD)
2019 BKV OPR LLC Produced Fluid 73.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2019 BKV OPR LLC Synthetic Liner Materials 2.46 Tons RESIDUAL WASTE TRANSFER FACILITY 101714
2019 BKV OPR LLC Produced Fluid 878.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1920170 Primary Facility 2010-10-14 Drilling/Alteration No Violations Noted
1922369 Primary Facility 2010-10-25 Drilling/Alteration No Violations Noted Fishing job at 7300 ft., cement back to 6700 ft.
1926598 Primary Facility 2010-11-03 Drilling/Alteration No Violations Noted Cemented production string yesterday. Rigging down. Cemented with 562 bbls of cement. Had 83 bbls return on prod. string job. No violations observed.
1968704 Primary Facility 2011-04-25 Routine/Complete Inspection No Violations Noted On site insp of flowback pit & review copy of site PPC plan. Universal Well Services in the process of perfoming fracing operations. PPC plan is not on site. There were no violations observed in the flowback pit. PPC plan provided adequately w/in 7 days.
1977981 Primary Facility 2011-06-02 Follow-up Inspection No Violations Noted Fracing and flowback procedures have been completed within the last few weeks. Citrus Energy was in the process of setting up for the production phase of operations. I observed a small tear on the top level of the liner in a relatively close proximity to the well heads. The pit clearly meets the 2 feet freeboard requirement. The flowback water level was three (3) feet away from the tear. The underlying liner was not noted to be compromised directly below the tear. Mr. Matthews informed that the tear in the liner will be repaired immediately.
1985807 Primary Facility 2011-07-05 Follow-up Inspection Outstanding Violations - No Viols Req'd
1990949 Primary Facility 2011-07-28 Follow-up Inspection No Violations Noted
1990955 Primary Facility 2011-06-16 Routine/Complete Inspection Violation(s) Noted
2033252 Primary Facility 2012-01-12 Complaint Inspection No Violations Noted Department requests evaluation of well cement and casing integrity.
2035161 Primary Facility 2012-01-19 Administrative/File Review No Violations Noted Teleconference with Citrus Energy regarding integrity inspection.
2084596 Primary Facility 2012-07-13 Routine/Complete Inspection No Violations Noted Aztec 266, Comp. Man - Rick Davidson
2250662 Primary Facility 2014-02-26 Administrative/File Review No Violations Noted
2351679 Primary Facility 2015-03-13 Routine/Complete Inspection No Violations Noted
2354983 Primary Facility 2015-03-25 Routine/Complete Inspection No Violations Noted
2392384 Primary Facility 2015-07-24 Routine/Partial Inspection No Violations Noted
2429755 Primary Facility 2015-11-17 Routine/Complete Inspection No Violations Noted There was no activity at the site as we arrived around 12:00. We used an Oakton MultiParameter PCSTester 35 and a Hanna Soil Test and Electrical Conductivity & Temperature meter to screen the water in the Production Fluid Storage Tanks and Gas Production Unit containment. Conductivity readings were in the range of (700-800) microSiemens/cm in water inside the production fluid tanks containment and less than (500) microSiemens/cm in water inside the GPU containment. We collected a water sample using the PADEP Bureau of Labs Standard Analysis Code 046 in the production fluid tanks containment at N-41.58295; W-076.01905. The parameters to be analyzed are listed in the Department's 11-17-15 Macialek inspection report. The intent of screening the water for conductivity and collecting the sample is to determine if the water meets the requirements of PA Title 25, Section 78.60 and Warren's SOP in the event this containment water will be discharged to stormwater controls on-site.
2430861 Primary Facility 2015-12-08 Administrative/File Review No Violations Noted Attached are the sample results of the water sample collected in the Production Fluid Storage Tank Containment Area as indicated in the 11/17/15 inspection report. The sample results were submitted with the inspection report.
2500409 Primary Facility 2016-07-01 Routine/Complete Inspection No Violations Noted
2502823 Primary Facility 2016-07-20 Administrative/File Review In Compliance with Policy
2739594 Primary Facility 2018-06-07 Routine/Complete Inspection Pending At the time of the inspection Stone Well Service’s Workover Rig 2 was pulling tubing at the Ruark South Unit Ruark East 1 Ruark South 2H (131-20081). At the start of my inspection, I met with Gary Gerard of BKV. I conducted the inspection accompanied by Mr. Gerard. Based on the circumstances described in the findings of this report, I will conduct a Follow-Up Inspection to confirm or deny an incident of a pollution-causing substance (contaminated storm-water) had contacted the well pad surface (constructed of a permeable material) and/or the suspected substance (contaminated storm-water) had been adequately removed and disposed of in a proper manner. The Follow-Up Inspection will be conducted following the conclusion operations and preferably at the time the secondary containment is recovered. Please provide notification for when this may occur and I will attempt to coordinate an on-site visit at the time. If you have any questions, please contact me.
2744918 Primary Facility 2018-06-13 Routine/Complete Inspection No Violations Noted I arrived at the site at 12:40. The weather conditions are cloudy skies and breezy with temperatures around 70 degrees Fahrenheit. There was no activity at the site. There are (3) wells at the site in the production phase, Ruark East 1H, Ruark East- Ruark South 2H, and Ruark East 11 H. I initially met with Sean Bonnice, and Cory Bradley, well pumpers of J.P. Reilly & Associates. Mr. Bonnice provided me with the following information. "A Service Rig recently moved to the BKV Macialek pad and it is currently on the BKV Mattocks pad. At the end of production tubing, which is at the end of the curve, around (7,000) feet in depth, tubing was pulled to change an x-nipple and to remove a perforated sub. Lubricators have been installed on all (3) wells. The next step is to install plungers on the wells." Matt Mercaldo, contractor manager, and Gavin Chilson, automation specialist both of BKV arrived during my conversation with the Reilly personnel. Mr. Mercaldo provided me with the following information. "The

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1990955 616340 06/16/2011 2011-06-16 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety

For data sources see[8]

References