If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-22564 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.670667,"lon":-75.932611,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 155338 | |
Farm/Lease Name: HAUSER J 018 | |
License Status: | |
Spud Date: | |
Permit Date: 2018-10-31 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.670667 | |
Longitude: -75.932611 |
Date | Event |
---|---|
2018-10-31 | New Permit Application |
2018-11-08 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | CABOT OIL & GAS CORP | 2,084,692.00 | 173 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 4.31 Tons | LANDFILL | 101247 |
2018 | CABOT OIL & GAS CORP | Drill Cuttings | 299.32 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 37,043.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Drill Cuttings | 1,225.23 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Waste Water Treatment Sludge | 87.30 Tons | REUSE (AT WELL PAD) | |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 214.89 Bbl | REUSE (AT WELL PAD) | |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 26.11 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 17.36 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Unused Fracturing Fluid Waste | 3.68 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Soil Contaminated by Oil & Gas Related Spills | 38.10 Tons | LANDFILL | 100933 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 0.09 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101714 |
2019 | CABOT OIL & GAS CORP | Soil Contaminated by Oil | 38.10 Tons | LANDFILL | 100933 |
2019 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 31.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Other Oil & Gas Wastes | 0.09 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2833466 | Primary Facility | 2019-01-04 | Drilling/Alteration | No Violations Noted | I arrived at the site at 12:00. The Weather, partly sunny skies, a light breeze, with temperatures near 40 degrees. Nabors Drilling Rig X36 is currently drilling the 6H well at a depth of (1,395.97) feet. Precision Drilling Rig #181 drilled the tophole sections of the Hauser 2H, 4H, 6H, 8H, 10H, 12H, 14H, 18H and 20H wells. Cabot submitted a Drilling resumption After Break of 30 days or more notification to the Department in reference to the 6H well on 12/31/19. The notification indicates that Nabors X36 would resume drilling on the 6H well at 6:30 PM on 1/1/19. The 6H well is the first well on the pad the Nabors rig has resumed drilling since the Precision rig demobilized from the site.
I met with Tony Ketterling, site company man and consultant of Cabot. The Department received a complaint on 1/3/19. The complainant alleged they had observed oil blowing off a pipe on a truck hauling pipes. The complainant and truck were driving north on State Route 29 in between Lake Walter and Springville on 1/3/1 |
2835901 | Primary Facility | 2019-02-05 | Drilling/Alteration | No Violations Noted | Arrived on location at 12:00. Met w/ Cabot Co. Man, Tony Ketterling. The Nabors X36 Rig was RU on the Hauser 18H well. Rig is presently drilling prod. hole at a depth of 15,480' to a projected TD of 16,067'. Tony anticipates reaching TD and running 5 1/2" prod. casing starting this evening. Casing and cement notice has been received through Greenport system.
- This well is the 6th of 10 wells to be drilled on this pad. The Hauser 2H, 10H, 6H, 16H & 20H wells have been TD'd. After this well is TD'd, the 8H, 14H, 4H & 12H wells will have production intervals drilled and cased to TD. - The top hole sections, surface and intermediate casings, of all 10 wells where previously drilled and cased by the PD 181 Rig. - Review of The 18H wells drillers log and previously set, casing tallies and cement reports did not reveal any obvious concerns or violations noted. Overall, well and location were found in good condition at time of inspection. Left location at 13:30. |
For data sources see[7]