If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-22534 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.6706,"lon":-75.932739,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 155338 | |
Farm/Lease Name: HAUSER J 006 | |
License Status: | |
Spud Date: | |
Permit Date: 2018-07-30 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.6706 | |
Longitude: -75.932739 |
Date | Event |
---|---|
2018-07-30 | New Permit Application |
2018-10-05 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | CABOT OIL & GAS CORP | 4,935,622.00 | 173 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 6.93 Tons | LANDFILL | 101247 |
2018 | CABOT OIL & GAS CORP | Drill Cuttings | 215.47 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 16,797.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Drill Cuttings | 1,123.11 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Waste Water Treatment Sludge | 96.22 Tons | REUSE (AT WELL PAD) | |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 236.71 Bbl | REUSE (AT WELL PAD) | |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 3.23 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 17.36 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Unused Fracturing Fluid Waste | 3.68 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Soil Contaminated by Oil & Gas Related Spills | 38.10 Tons | LANDFILL | 100933 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 0.09 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101714 |
2019 | CABOT OIL & GAS CORP | Soil Contaminated by Oil | 38.10 Tons | LANDFILL | 100933 |
2019 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 31.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Other Oil & Gas Wastes | 0.10 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2770695 | Primary Facility | 2018-09-04 | Preoperation Inspection | No Violations Noted | The site is under construction. Perimeter BMPs have been installed in accordance with the approved permit. No violations were noted. If you have any questions, please contact me. |
2833351 | Primary Facility | 2019-01-04 | Drilling/Alteration | No Violations Noted | I arrived at the site at 12:00. The Weather, partly sunny skies, a light breeze, with temperatures near 40 degrees. Nabors Drilling Rig X36 is currently drilling the 6H well at a depth of (1,395.97) feet. Precision Drilling Rig #181 drilled the tophole sections of the Hauser 2H, 4H, 6H, 8H, 10H, 12H, 14H, 18H and 20H wells. Cabot submitted a Drilling resumption After Break of 30 days or more notification to the Department in reference to the 6H well on 12/31/19. The notification indicates that Nabors X36 would resume drilling on the 6H well at 6:30 PM on 1/1/19. The 6H well is the first well on the pad the Nabors rig has resumed drilling since the Precision rig demobilized from the site.
I met with Tony Ketterling, site company man and consultant of Cabot. The Department received a complaint on 1/3/19. The complainant alleged they had observed oil blowing off a pipe on a truck hauling pipes. The complainant and truck were driving north on State Route 29 in between Lake Walter and Springville on 1/3/1 |
For data sources see[7]