If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-22509 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.772003,"lon":-75.675975,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Harford Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 149723 | |
Farm/Lease Name: PAYNE D 14 | |
License Status: | |
Spud Date: 2018-08-07 | |
Permit Date: 2018-04-25 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.772003 | |
Longitude: -75.675975 |
Date | Event |
---|---|
Deviated | |
2018-04-25 | New Permit Application |
2018-08-06 | Performed Spud Operation |
2019-03-20 | Drilling Completion |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | CABOT OIL & GAS CORP | 361,790.00 | 163 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 5.23 Tons | LANDFILL | 101247 |
2018 | CABOT OIL & GAS CORP | Drill Cuttings | 378.02 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Waste Water Treatment Sludge | 33.75 Tons | REUSE (AT WELL PAD) | |
2019 | CABOT OIL & GAS CORP | Drill Cuttings | 835.21 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 18.62 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 15,929.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2019 | CABOT OIL & GAS CORP | Unused Fracturing Fluid Waste | 4.74 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 7,239.82 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Other Oil & Gas Wastes | 0.09 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 0.67 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101714 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2762387 | Primary Facility | 2018-08-10 | Drilling/Alteration | No Violations Noted | At time of inspection.
On site for a new spud inspection. Met with company man David Dewberry. United Drilling was on site to drill and set the conductor pipe on the 1H, 4H, 5H, 6H, 7H, 9H, 10H, 12H and 14H wells. All the conductor pipes were set at 92' and Halliburton was on site and cementing them in. The 4H and 5H were cemented and they were on the 6H when I arrived on site. They plan to cement all the wells today. There was a new sign with the permit numbers put at the entrance, the new permit numbers were correct. There are three existing wells on site, the 2H, 3H and 8H. The permit number for the 2H was correct, the 3H was incorrect and there was no permit number for the 8H. The permit numbers were on the entrance sign and correct during prier inspections. David updated the sign before I left the site. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted |
2778754 | Primary Facility | 2018-09-24 | Drilling/Alteration | No Violations Noted | At time of inspection.
Met with company man Will Dean. 03:41 PD 181 was on site to drill and set the surface and intermediate casings. There are three existing wells on site that are temporarily plugged and there are nine new wells on site to be drilled. They are on the fifth of the nine wells. They were rigged up on the 10H and waiting on cement for the surface casing. They bumped the plug at 03:41 a.m., mandatory 8hrs will be 11:41 a.m. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
For data sources see[7]