37-115-22481

Well Details

Well ID: 37-115-22481
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Apolacon Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 151081
Farm/Lease Name: CAPRIO (07-077-02) S 2H
License Status:
Spud Date:
Permit Date: 2018-03-20
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.974992
Longitude: -76.134664

For data sources see[1][2][3]

Well History

Date Event
2018-03-20 New Permit Application
2018-04-18 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-12-24 2019-01-25 5,700 7,941,520 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 ProFE 105 ProFrac Iron Control Citric Acid 77-92-9 100 0.000982356 1819.04
TRS-3001 Tight Rock Solutions Scale Inhibitor Ethylene Glycol 107-21-1 5 0.000533502 987.894
Amine Triphosphate Proprietary 30 0.00320101 5927.36
Sodium Phosphate, Tribasic 7601-54-9 5 0.000533502 987.894
Sand (40/70 White Proppant) ProFrac Proppant Silica Substrate 14808-60-7 100 2.96135 5,483,580.0
ProHib 100 ProFrac Acid Inhibitor 2-Propyn-1-ol compound w/ methyloxirane 38172-91-7 15 0.000122794 227.38
Sand (30/50 White Proppant) ProFrac Proppant Silica Substrate 14808-60-7 100 1.7371 3,216,620.0
Other Chemical(s) Listed Above See Trade Name(s) List Sodium Phosphate, Tribasic 7601-54-9 5 0.000533502 987.894
Oxyalkylated alcohol Proprietary 5 0.00091537 1695.01
Substituted alkylamine proprietary 1 0.000183074 339.001
Inorganic salt Proprietary 10 0.00183074 3390.01
Ethylene Glycol 107-21-1 5 0.000533502 987.894
Alcohol Alkoxylates Proprietary 5 0.000535947 992.421
TRS 17888 Tight Rock Solutions Friction Reducer Substituted alkylamine proprietary 1 0.000183074 339.001
Oxyalkylated alcohol Proprietary 5 0.00091537 1695.01
Hydrotreated Light Distillate 64742-47-8 30 0.00549222 10170
Inorganic salt Proprietary 10 0.00183074 3390.01
Sand (100 Mesh Proppant) ProFrac Proppant Silica Substrate 14808-60-7 100 58.9659 109,188,000.0
BIO12031A Nalco Champion Biocide Glutaraldehyde 111-30-8 30 0.00319727 5920.43
Water Repsol USA Carrier/Base Fluid Water 7732-18-5 100 35.7895 66,272,000.0
Hydrochloric Acid (7.5%) Cooper Acidizing Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 36 0.177823 329277
TRS 805X Tight Rock Solutions Friction Reducer Alcohol Alkoxylates Proprietary 5 0.000535947 992.421
Aliphatic Hydrocarbon Proprietary 30 0.00321568 5954.52

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 REPSOL OIL & GAS USA LLC 1,561,522.40 313 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 3.35 Tons LANDFILL 8-0728-0004/013
2018 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 540.92 Bbl REUSE (AT WELL PAD)
2018 REPSOL OIL & GAS USA LLC Drill Cuttings 104.19 Tons LANDFILL 301358
2018 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 0.36 Tons LANDFILL 8-0728-0004/013
2018 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 51.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 REPSOL OIL & GAS USA LLC Unused Fracturing Fluid Waste 2.30 Tons LANDFILL 8-0728-0004/013
2018 REPSOL OIL & GAS USA LLC Drill Cuttings 1,123.65 Tons LANDFILL 8-0728-0004/013
2018 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 113.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 REPSOL OIL & GAS USA LLC Produced Fluid 8,480.92 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 2.88 Tons BENEFICIAL REUSE ?PERMIT
2019 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil 0.01 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 6.09 Tons LANDFILL 8-0728-0004/013
2019 REPSOL OIL & GAS USA LLC Produced Fluid 5,357.94 Bbl REUSE (AT WELL PAD)
2019 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 2.88 Tons
2019 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 105.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 0.41 Tons BENEFICIAL REUSE – PERMIT BY RULE
2019 REPSOL OIL & GAS USA LLC Produced Fluid 30.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2019 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 54.53 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2019 REPSOL OIL & GAS USA LLC Produced Fluid 435.42 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 REPSOL OIL & GAS USA LLC Unused Fracturing Fluid Waste 3.74 Tons LANDFILL 8-0728-0004/013
2019 REPSOL OIL & GAS USA LLC Produced Fluid 166.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 REPSOL OIL & GAS USA LLC Synthetic Liner Materials 7.86 Tons LANDFILL 100933
2019 REPSOL OIL & GAS USA LLC Other Oil & Gas Wastes 553.67 Bbl REUSE (AT WELL PAD)
2019 REPSOL OIL & GAS USA LLC Soil Contaminated by Oil & Gas Related Spills 0.01 Tons RESIDUAL WASTE PROCESSING FACILITY 301333

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2726752 Primary Facility 2018-04-26 Drilling/Alteration No Violations Noted At time of inspection.

Arrived on site for a new spud inspection. Minichi Contracting Group was on site to drill and run the conductor pipe on the 1H, 2H, 3H, 4H, 6H, 7H, 8H and 9H wells. I met with Repsol representative Johnny Pazzaglia and Minichi driller Keith Bowman. The rig was on the 1H well at a depth of 25' and plan to drill to 63'. The conductor pipe is set at 63' on the 2H, 3H, 4H, 6H, 7H, 8H and 9H wells. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2736974 Primary Facility 2018-05-30 Routine/Complete Inspection No Violations Noted The Department arrived on site at 1235 hrs to conduct a RTNC inspection. The Department was represented by Frank Hoehle (DEP-WQS), John Sassi (EPS-WQS) and myself. Upon arriving at the site, we met with Repsol's Company Man/Completions Consultant Brad Campbell.

Mr. Campbell informed us that eight new wells were being drilled on the pad. All eight conductors had been spudded and drilling was planned to begin the next week. Containment (100 Mil New Pig liner) had been laid down on most of the pad and wooden/rubber mats had been installed over much of the containment. Several frac tanks were already present on the pad to store the oil-based drilling mud that would be needed to perform drilling operations in the following week.

The pad also contained two wells currently in production: the 5H and 10H. However, they were slated to be shut in the next morning because the drilling crew needed the space currently occupied by the production fluid tanks associated with these two producing wells. Yellow cages were sta

2750194 Primary Facility 2018-07-10 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Pat Bauer. Patterson 805 was on site and drilling the lateral section of the well. They were drilling with SOBM. There are 2 producing wells on site, they are temporally shut in. They are on the fourth of 8 wells to be drilled. The proposed TD for the well is 15900'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2778152 Primary Facility 2018-08-29 Incident- Response to Accident or Event No Violations Noted I arrived at the site at 12:18 in response to a reported spill of oil based drilling mud to the pad surface as a result of compromised secondary containment liner integrity. The weather conditions are mostly sunny, skies, breezy, very warm and humid with temperatures in the mid 80's. Kris Perritt, Environmental Health and Safety Specialist of Repsol contacted me on 8/23/18 at 13:42 to inform me of staining discovered in the general area of the pad surface where the secondary containment liner used to stage frac tanks storing oil based drilling mud was removed. I contacted him during the inspection to inquire of the specifics of the spill incident and the approximate location. He informed me that (2) barrels of oil based drilling mud was spilled to the containment during drilling of the Caprio wells, with (2) gallons of the mud escaping containment due to compromised liner integrity. He further stated that the spill has been cleaned up and the impacted material has been transported to a landfill for disp
2807664 Primary Facility 2018-11-15 Routine/Complete Inspection No Violations Noted I arrived at the site at 9:41 AM. The weather conditions are cloudy skies, cold, with a light breeze and temperatures in the 20's. Repsol is rigging up for hydraulic fracturing (stimulation) of the Caprio 1H-4H, and 6H-9H wells. The Caprio 5H and 10H wells are the existing wells on the location drilled to total depth and stimulated. An employee from Allied Horizontal stated that Repsol is in the process of toe prep stages of the frac, which consists of popping the sleeve, and perforating the first zone in the bottom of the well. Just prior to departing from the pad, I met with Marc Bryant, Field Supervisor of FDS. I had inquired with Mr. Bryant in reference to a reported spill of (1) gallon of hydraulic fluid spilled to the ground at 472 Abell Road, Little Meadows, PA on 11/12/18. This address is in a relatively close proximity to the Repsol Caprio Pad, and the Repsol Abell Pad, which is located in Warren Township, Bradford County. In accordance with Google Earth Pro, the spill occurred in Apolacon Town
2820141 Primary Facility 2018-12-11 Incident- Response to Accident or Event No Violations Noted Jared Jacobini, DEP O&G WQS, out of PADEP NCRO in Williamsport, PA and I arrived at the site at 12:55 in response to (2) separate reported spill incidents. The weather conditions are partly cloudy skies with light to moderate winds, and temps in the 30's. Pro Frac is the Repsol subcontractor in the process of conducting hydraulic fracturing (stimulation) operations. Repsol submitted a stimulation notification to the Department on 11/26/18. The comments in the notification indicated frac operations would commence on 11/28/18 at 6 AM. We met with Ralph Babcock, site safety man of REM Security, and Billy Watts, site company man, and completions consultant of Repsol. Zipper frac operations are in progress according to Repsol for the Caprio 1H, 2H, 3H, 4H, 6H, 7H, 8H, and 9H wells. The 5H and 10H wells which were in production, but are currently shut in. Mr. Watts stated the following in reference to the spill incidents. "The spill of (1) quart of motor oil occurred on 12-5-18. The oil leaked from a sight
2820329 Primary Facility 2018-12-28 Routine/Complete Inspection No Violations Noted At time of inspection.

Met with company man Billy Watts. Pro Frac was on site to frac the 1H, 2H, 3H, 4H 6H, 7H, 8H and 9H wells. They were running a plug and perf in the 4H and fracturing stage 3 out of 27 stages on the 8H when I arrived on location. The 1H was completed with 23 stages. There were 3 out of 26 stages completed on the 2H. The 3H was completed with 22 stages. There were 4 out of 25 stages completed on the 4H. There were 3 out of 25 stages completed on the 6H. The 7H was completed with 22 stages. The 9H was completed with 21 stages. The water was be pumped from the Steen fresh water impoundment to a MASS tank on the Abell pad then pumped to a MASS tank on the Caprio pad. Production water was being trucked directly to the frac site. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2826231 Primary Facility 2019-01-02 Incident- Response to Accident or Event No Violations Noted I arrived at the site at 12:13 in response to (3) small spill incidents that recently occurred at the site. The weather conditions are cloudy skies with calm winds, and temperatures in the low to mid 30's. I met with Billy Watts, site company man, and completions foreman of Repsol, and Dave Coxhead, site safety man of REM security. Pro Frac is the Repsol subcontractor at the site in the process of conducting hydraulic fracturing (stimulation) operations. Mr. Watts provided me with the following details in reference to site activities and the spill incidents. "Well swap and zipper frac are in progress. The Frac is on the Caprio 8H well on stage 9. Frac is conducted during daylight hours only. The fire suppressant spill happened at 12:45 PM on 12-29-18. Fire suppressant went off while Pro Frac was in the process of testing the system. Dry chemical blew out of nozzles on the frac pump to secondary containment. Frac pumps have fire suppressant system on them. The spill of (10) gallons of FireAde 2000 w
2838571 Primary Facility 2019-02-06 Follow-up Inspection No Violations Noted The Department, Frank Hoehle, DEP O&G WQS and I arrived at the site at 11:39 to conduct a follow up inspection in reference to a production fluid spill that occurred at the site on 1-6-19. The weather conditions are cloudy skies, breezy, with rainfall approaching, and a temperature of 35 degrees Fahrenheit. For additional details pertaining to the production fluid spill, refer to the Department's 1-6-19, 1-9-19, and 1-17-19 inspection reports, Inspection ID#'s 2831500, 2832214, 2832221. We met with Murray Kush, site company man, completions consultant of Repsol, and Dave Coxhead, Site Safety Man, of REM Security. Deep Well Services Rig # 2 is in the process of drilling out hydraulic fracturing plugs. Mr. Kush informed the Department the following. "The rig is drilling out frac plugs on the 3H well. A total of 22 plugs will be drilled out. We are the 20th plug. The 1H is done. Frac plugs will be drilled out on the 7H next. The working tanks and gas buster tanks near the pad entrance contain fluid

For data sources see[8]