X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22473

Well Details

Well ID: 37-115-22473
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Lathrop Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 144968
Farm/Lease Name: CARPENETTI R 009
License Status:
Spud Date:
Permit Date: 2018-03-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.662881
Longitude: -75.819786

For data sources see[1][2][3]

Well History

Date Event
2018-03-23 New Permit Application
2018-05-18 Performed Spud Operation
2018-08-29 MOD

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-19 2019-04-04 7,638 10,951,800 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 14.8691 16,041,800.0
Hydrochloric Acid (15%) Keane Acidizing Hydrochloric Acid 7647-01-0 15 0.0428397 46218.4
Water 7732-18-5 85 0.242758 261904
Acid Inhibitor, KAI-12 Keane Acid Inhibitor Ethoxylated alcohol 68131-39-5 10 0.00009328 100.637
Cinnamaldehyde 104-55-2 10 0.00009328 100.637
Ethylene glycol 107-21-1 40 0.000373122 402.549
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000186561 201.275
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00009328 100.637
isoproyl alcohol 67-63-0 5 0.00004664 50.319
formic acid 64-18-6 10 0.00009328 100.637
Friction Reducer, KFR-16FW Keane Friction Reducer Water 7732-18-5 60 0.0632797 68270.5
oleic acid diethanolamide 93-83-4 1.5 0.00158199 1706.76
Ammonium Chloride 12125-02-9 1.5 0.00158199 1706.76
Petroleum distillate, Hydrotreated Light 64742-47-8 20 0.0210932 22756.8
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00105466 1137.84
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 84.712 91,393,100.0
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor organic phosphonic salts 15827-60-8 15 0.00007310 78.86
Water 7732-18-5 85 0.000414207 446.875
Scale Inhibitor, KSI-19 Keane Scale Inhibitor organic phosphonic salts 15827-60-8 15 0.00232281 2506
Water 7732-18-5 65 0.0100655 10859.3
Methanol 67-56-1 20 0.00309708 3341.34
Iron Control, KFEAC-20/30 Keane Iron Control Acetic acid 64-19-7 5 0.00013161 141.99
Citric acid 77-92-9 30 0.000789662 851.941
Biocide, MBC-516 Keane Biocide Glutaral 111-30-8 26.7 0.00223138 2407.37
ethanal 64-17-5 2.8 0.000234003 252.458
Water 7732-18-5 56.7 0.00474022 5114.08
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000443769 478.768
didecyldimethylammonium chloride 7173-51-5 8 0.000666072 718.604
Other Chemical(s) Listed Above See Trade Name(s) List organic phosphonic salts 15827-60-8 15 0.00007310 78.86
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00009328 100.637
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000443769 478.768
Citric acid 77-92-9 30 0.000789662 851.941
Petroleum distillate, Hydrotreated Light 64742-47-8 20 0.0210932 22756.8
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000186561 201.275
organic phosphonic salts 15827-60-8 15 0.00232281 2506
ethanal 64-17-5 2.8 0.000234003 252.458
Glutaral 111-30-8 26.7 0.00223138 2407.37
didecyldimethylammonium chloride 7173-51-5 8 0.000666072 718.604
isoproyl alcohol 67-63-0 5 0.00004664 50.319
formic acid 64-18-6 10 0.00009328 100.637
Ammonium Chloride 12125-02-9 1.5 0.00158199 1706.76
Ethoxylated alcohol 68131-39-5 10 0.00009328 100.637
Cinnamaldehyde 104-55-2 10 0.00009328 100.637
Methanol 67-56-1 20 0.00309708 3341.34
Water 7732-18-5 85 0.242758 261904
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00105466 1137.84
oleic acid diethanolamide 93-83-4 1.5 0.00158199 1706.76

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 CABOT OIL & GAS CORP 1,806,601.00 249 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 3.09 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Drill Cuttings 1,577.44 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 74.26 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.15 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 32.84 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 9,558.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 3.08 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 19,749.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 0.06 Tons RESIDUAL WASTE TRANSFER FACILITY 101714

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2732858 Primary Facility 2018-05-18 Preoperation Inspection No Violations Noted The Department (Casy Baldwin and I) was on site to conduct a Preoperational Inspection in accordance with 3258(a.1). Upon arrival the Department reviewed the E&S Inspection Log which indicated that the most recent inspection was conducted on 5/17/18. The Department met with Mike Murnin (Construction Foreman-Cabot ) and Larry Cheatwood (Company Man-Cabot). This site was previously permitted under ESCGP ESX12-115-0191. The previous ESCGP was Terminated in May of 2016 and was re-permitted under the new ESCGP2 to enlarge the pad and drill an additional 9 wells. At the time of the inspection they were placing shot rock on the site. On the eastern side of the access road where it meets the pad they redlined a ditch on the fill and will grade it back and allow stormwater to travel to the previously existing access road roadside ditch.

For data sources see[8]

References