X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22304

Well Details

Well ID: 37-115-22304
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Lathrop Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 146566
Farm/Lease Name: MACKEY, R. 10
License Status:
Spud Date:
Permit Date: 2017-06-30
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.671586
Longitude: -75.808442

For data sources see[1][2][3]

Well History

Date Event
2017-06-30 New Permit Application
2018-04-02 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-07-18 2018-08-01 7,475 13,327,800 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Scale Inhibitor, KSI-19NW Keane Scale Inhibitor Water 7732-18-5 95 0.0169828 21626.1
organic phosphonic salts 15827-60-8 15 0.0026815 3414.65
Hydrochloric Acid (15%) Keane Acidizing Water 7732-18-5 7.5 0.0187659 23896.6
Hydrochloric Acid 7647-01-0 15 0.0375317 47793.3
Iron Control, KFEAC-20/30 Keane Iron Control Acetic acid 64-19-7 5 0.00010824 137.834
Citric acid 77-92-9 30 0.000649442 827.006
Friction Reducer, KFR-23 Keane Friction Reducer Water 7732-18-5 50 0.0562027 71569.1
alcohols, C12-16, ethoxylated 68551-12-2 2 0.00224811 2862.76
oleic acid diethanolamide 93-83-4 2 0.00224811 2862.76
copolymer of 2-propenamide 69418-26-4 20 0.0224811 28627.6
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0224811 28627.6
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 87.3405 111,220,000.0
Acid Inhibitor, KAI-12 Keane Acid Inhibitor Cinnamaldehyde 104-55-2 10 0.00007733 98.471
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007733 98.471
Ethoxylated alcohol 68131-39-5 10 0.00007733 98.471
isoproyl alcohol 67-63-0 5 0.00003866 49.236
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000154657 196.942
Ethylene glycol 107-21-1 40 0.000309314 393.884
formic acid 64-18-6 10 0.00007733 98.471
Biocide, MBC-516 Keane Biocide ethonal 64-17-5 2.8 0.000256631 326.797
Water 7732-18-5 56.7 0.00519862 6619.97
Glutaral 111-30-8 26.7 0.00244716 3116.24
didecyldimethylammonium chloride 7173-51-5 8 0.000730483 930.204
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000486683 619.747
Other Chemical(s) Listed Above See Trade Name(s) List didecyldimethylammonium chloride 7173-51-5 8 0.000730483 930.204
Citric acid 77-92-9 30 0.000649442 827.006
Glutaral 111-30-8 26.7 0.00244716 3116.24
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000486683 619.747
formic acid 64-18-6 10 0.00007733 98.471
organic phosphonic salts 15827-60-8 15 0.0026815 3414.65
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007733 98.471
oleic acid diethanolamide 93-83-4 2 0.00224811 2862.76
Ethoxylated alcohol 68131-39-5 10 0.00007733 98.471
Water 7732-18-5 7.5 0.0187659 23896.6
isoproyl alcohol 67-63-0 5 0.00003866 49.236
alcohols, C12-16, ethoxylated 68551-12-2 2 0.00224811 2862.76
ethonal 64-17-5 2.8 0.000256631 326.797
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000154657 196.942
Cinnamaldehyde 104-55-2 10 0.00007733 98.471
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0224811 28627.6
copolymer of 2-propenamide 69418-26-4 20 0.0224811 28627.6
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 12.2669 15,620,700.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 CABOT OIL & GAS CORP 1,604,870.00 114 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 3,388,869.00 363 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 37.00 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 8.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Drill Cuttings 1,210.36 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 651.61 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018 CABOT OIL & GAS CORP Produced Fluid 36,064.58 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Waste Water Treatment Sludge 100.65 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 3.55 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 658.45 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 5.48 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Produced Fluid 3,643.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2721228 Primary Facility 2018-04-19 Drilling/Alteration No Violations Noted Arrived on location at: 13:30. Weather: Snow flurries, cold, ~ 30 degs. On location in response to a spill notification received from Cabot O&G Environmental Rep. Steve Watson. Steve called in notification to report a hydraulic oil spill of ~ 20 gals from a GDS Lowboy truck which occurred on the lower tank pad for the Mackey, R. Well pad. (See the 012 well inspection for further spill details)

- While on location I performed inspections of the (4) newly spud wells on well pad, the O06, 008, 010 & 012 wells. All (4) wells 20" conductors have been set at ~ 103' and cemented to surface. All (4) wells 20" mouse holes have been set at 70' and Cellar Tech Cellar units have been set in place. Pad liner and drilling mats were being placed at time of inspection. - (1) existing well on pad, the 1H was shut-in and has had production tree removed and night cap installed. All production equipment has been disconnected and removed in preparation for drilling new wells on pad. No issues of violations were noted at well p

2730726 Primary Facility 2018-05-04 Drilling/Alteration No Violations Noted Arrived on site at 11:00. Met with Cabot Co Man Perk McDowell. Nabors X36 Rig is presently RU on the Mackey, R. 8H well. Drilling the 17 1/2" Surface hole at ~ 450', drilling on fresh water base mud, to a projected set depth of ~ 887'. Mr. McDowell plans to be cementing the 8H wells Surface casing string later this afternoon.

- Since my last insp., Rig has drilled, set and cemented the 13 3/8" Surface casings in the 6H, 12H & 10H wells. (See individual inspections for these wells for casing and cementing details.) - While cementing the 10H wells Surface casing string, problems were encountered with Schlumbergers pumps and had to switch over to Rig pumps to complete pumping cement job. This switch over resulted in a loss of cement circulation, returns to surface. Following 10H cement job, the TOC was estimated at ~ 30'. Cabot is planning to perform a top job on 10H wells Surface casing later this afternoon and will also be running a CBL on this string to confirm cementing results. I requested a copy of Cement

2760956 Primary Facility 2018-07-31 Routine/Complete Inspection No Violations Noted Today's inspection was conducted in response to Cabot's self reporting of a release of produced fluid directly to the COG Mackey R Tank Pad. On 7/30/18, Jon Sassi, Department EPS contacted Brody Webster, Senior Environmental Health and Safety Specialist of Cabot of Oil and Gas at 14:54 hours to inquire of the specifics of a reported spill of (2) barrels of water at the R Mackey site. Mr. Webster provided the following details in reference to the spill during that phone conversation. “A Susquehanna Gas Field Services Water Truck was in the process of delivering recycled water from Comtech to the Mackey Site to use it for completion of the wells. Mechanical failure of a pressure relief valve on the truck released an estimated (2) barrels of recycled water to the tank pad surface. The spill occurred at 1:45 AM on 7/30/18. I contacted the DEP after hours number at 2:04 AM. I spoke to the answering service and did not receive a return phone call. The area where the spill occurred , which is in front of the frac

For data sources see[8]

References