If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-21719 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.978183,"lon":-76.032169,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Choconut Township | |
Operator Name: REPSOL OIL & GAS USA LLC | |
Well Pad ID: 151517 | |
Farm/Lease Name: CHOCONUT VALLEY FARMS 07 090 04 4H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-03-18 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.978183 | |
Longitude: -76.032169 |
Date | Event |
---|---|
2014-03-18 | New Permit Application |
2014-07-14 | Performed Spud Operation |
2014-09-07 | Drilling Completion |
2014-10-02 | Perforation |
2014-10-14 | Performed Stimulation |
2015-04-03 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-10-02 | 2014-10-26 | 5,943 | 6,358,830 | 47,900 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 3 1/2% HCL | Trican | Carrier | Hydrochloric acid | 7647-01-0 | 3.5 | 0.01717 | 11683.6 |
100 Mesh, Bulk (over 20K lbs)* | Trican | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 7.56393 | 5,146,960.0 | |
FEAC-20 (Iron Control) | Trican | Iron Control | Citric acid | 77-92-9 | 30 | 0.000938 | 638.123 | |
Acetic acid | 64-19-7 | 45 | 0.001407 | 957.185 | ||||
FR-17 (Friction Reducer) | Trican | Friction Reducer | Ethylene Glycol | 107-21-1 | 3 | 0.003095 | 2106.2 | |
Mineral oil/ light hydrotreated pet. distillate | 64742-47-8 | 28 | 0.028889 | 19657.8 | ||||
Ethoxylated alcohols | Proprietary | 4 | 0.004127 | 2808.26 | ||||
Polyacrylamide | Proprietary | 30 | 0.030953 | 21062 | ||||
Water | Customer | Carrier | Water | 7732-18-5 | 100 | 77.9868 | 53,067,000.0 | |
AQUCAR DB 5 (Water Treatment Microbiocide) | Trican | Biocide | Polyethylene glycol | 25322-68-3 | 65.2 | 0.017256 | 11742.1 | |
Dibromoacetonitrile | 3252-43-5 | 0.5 | 0.000132 | 90.047 | ||||
Sodium Bromide | 7647-15-6 | 1.5 | 0.000397 | 270.141 | ||||
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 5 | 0.001323 | 900.47 | ||||
Other Chemicals | Sorbitan monooleate | 1338-43-8 | 0 | 0 | 0 | |||
Trade Secret | Proprietary | 0 | 0 | 0 | ||||
Acrylamide | 79-06-1 | 0 | 0 | 0 | ||||
Water | 7732-18-5 | 0 | 0 | 0 | ||||
LSI-21 (Scale Inhibitor) | Trican | Scale Inhibitor | Acrylic Polymer | 28205-96-1 | 15 | 0.003884 | 2642.99 | |
Sodium Salt of Phosphate Ester | 68131-72-6 | 15 | 0.003884 | 2642.99 | ||||
7 1/2% HCL | Trican | Carrier | Hydrochloric acid | 7647-01-0 | 7.5 | 0.007536 | 5128.1 | |
White 40/70 | Trican | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 8.46682 | 5,761,340.0 | |
AI-7NR (Acid Inhibitor) | Trican | Acid Inhibitor | Prop-2-yn-1-ol | 107-19-7 | 1 | 0.00001300 | 9.01304 | |
White 30/50 | Trican | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 5.23137 | 3,559,740.0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-10-14 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | REPSOL OIL & GAS USA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | REPSOL OIL & GAS USA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | REPSOL OIL & GAS USA LLC | 1,512,769.50 | 334 | 0.00 | 0 | 0.00 | 0 |
2017 | REPSOL OIL & GAS USA LLC | 1,349,442.80 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | REPSOL OIL & GAS USA LLC | 1,005,680.50 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | REPSOL OIL & GAS USA LLC | 814,145.90 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | REPSOL OIL & GAS USA LLC | Fracing Fluid Waste | 16.90 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | REPSOL OIL & GAS USA LLC | Fracing Fluid Waste | 17,568.70 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | REPSOL OIL & GAS USA LLC | Fracturing Fluid Waste | 67.79 Tons | LANDFILL | 100361 |
2014 | REPSOL OIL & GAS USA LLC | Drill Cuttings | 1,422.72 Tons | LANDFILL | 8-0728-0004/013 |
2016 | REPSOL OIL & GAS USA LLC | Produced Fluid | 100.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | REPSOL OIL & GAS USA LLC | Produced Fluid | 4,964.38 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | REPSOL OIL & GAS USA LLC | Produced Fluid | 200.44 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | REPSOL OIL & GAS USA LLC | Produced Fluid | 417.73 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | REPSOL OIL & GAS USA LLC | Produced Fluid | 103.17 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2017 | REPSOL OIL & GAS USA LLC | Other Oil & Gas Wastes | 168.47 Bbl | REUSE (AT WELL PAD) | |
2017 | REPSOL OIL & GAS USA LLC | Produced Fluid | 152.35 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | REPSOL OIL & GAS USA LLC | Produced Fluid | 2,154.60 Bbl | REUSE (AT WELL PAD) | |
2018 | REPSOL OIL & GAS USA LLC | Produced Fluid | 165.78 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | REPSOL OIL & GAS USA LLC | Produced Fluid | 262.74 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | REPSOL OIL & GAS USA LLC | Produced Fluid | 1,316.48 Bbl | REUSE (AT WELL PAD) | |
2018 | REPSOL OIL & GAS USA LLC | Other Oil & Gas Wastes | 71.52 Bbl | REUSE (AT WELL PAD) | |
2018 | REPSOL OIL & GAS USA LLC | Other Oil & Gas Wastes | 51.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 957.96 Bbl | REUSE (AT WELL PAD) | |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 53.56 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2284194 | Primary Facility | 2014-07-03 | Preoperation Inspection | No Violations Noted | The Department was on site at the Talisman Energy Choconut Valley Farms Well Site to conduct a Preoperational Inspection. The Well Permits issued for this pad are the Choconut Valley Farms (115-21718, 115-21719). All perimeter BMP's are in place and pad is currently about 70% complete. Wood chip stockpile on site is currently being removed. Rock Sumps along roadway installed and rock being installed during inspection. The Department reviewed the weekly and post storm inspection and found the latest inspection on 7/2/2014. No violations noted. If there are any questions, feel free to contact me at (570) 346-5539. |
2311440 | Primary Facility | 2014-10-08 | Routine/Complete Inspection | No Violations Noted | The Department was on site at the Talisman Energy Choconut Valley Farms Well Site to conduct a Routine Complete Inspection. The Well Permits issued for this pad are the Choconut Valley Farms (115-21718, 115-21719). |
2375453 | Primary Facility | 2015-06-01 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a Routine Complete Inspection of the Choconut Valley Farms Well Pad. There was previously an NOV for this site due to poor vegetation and while the site has low vegetation in many spots still, a contractor is scheduled to repair all of the affected areas, and the site is being monitored for erosional issues. The site is currently stable, due to flexterra on many of the areas of low vegetation still holding together. |
2402450 | Primary Facility | 2015-08-27 | Routine/Complete Inspection | No Violations Noted | |
2462620 | Primary Facility | 2016-02-29 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a routine complete inspection of the Choconut Valley Farms well site (ESX29-115-14-0047). The site was stable with no ongoing work at the time of inspection.
There are no erosional issues apparent at this time.
If there are any questions, please feel free to contact me. |
2498595 | Primary Facility | 2016-07-05 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 10:40a.m., the cellar was about half full of water with no bubbling noticed, the (20x13) vent pipe was open and venting into the atmosphere with no gas detected, the (13x9) vent pipe was open and venting into the atmosphere with no gas detected, the (9x5) vent pipe was open and venting into the atmosphere with gas detected at 100% LEL and peaked at 66% methane with no measurable flow. There was 1047psi on the production casing and 485psi on the production tubing. The production line was connected to a separator and the bottom line was going to a 500bbl tank that was on containment and the valve was closed. I took a walk around the location and noticed some small stains on the ground, I contacted Talisman Energy and spoke with Kris Perrritt and let him know of the stains and he told me they would get them taken care of. I left the site at 11:15a.m. |
2544498 | Primary Facility | 2016-11-17 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a routine complete inspection of the Choconut Valley Farms well site (ESX29-115-14-0047).
The site was stable and vegetated, however the vegetation on the back side of the retention basin was somewhat light. There was no slippage or evidence of erosion at this time, however it may be recommended to keep an eye on this area to ensure it remains stable. There was evidence of recent repair on some spots of this well pad. There are no violations. If there are any questions, please feel free to contact me |
2588462 | Primary Facility | 2017-04-27 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 13:50p.m.
The cellar was about three quarters full of water with no bubbling noticed. The (20x13) annulus vent pipe was open and venting into the atmosphere with no gas detected, the (13x9) annulus vent pipe was open and venting into the atmosphere with no gas detected, the (9x5) annulus vent pipe was open and venting into the atmosphere with gas detected at 100% LEL and peaked at 26% methane with no measurable flow. There was a 500bbl tank on containment and the containment appeared to be in good condition. There was 615psi on the production casing and 494psi on the production line, the well was producing through a separator. I took a walk around the location and there were no obvious concerns noticed. I left the site at 14:25p.m. |
2627488 | Primary Facility | 2017-08-21 | Routine/Complete Inspection | No Violations Noted | I inspected the site on August 1, 2017. The area roads on the way to the well site were all under repair by township and PADOT, As a recent storm had things in the area quite torn up. The access road had a bit of washing evident, but it appears the most extensive damage was the filling on a sediment basin, which is recommended to be cleaned out. The slopes around the access road and well site were all well vegetated and stable with no observed slides or erosion. The pad surface was solid and stable.
There were no violations noted. |
2697775 | Primary Facility | 2018-02-20 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. The water was 1.5' below grade in the cellar and there was no bubbling noticed. There was a 500bbl tank on containment that was connected to the bottom of the separators, the containment appeared to be in good condition. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2796366 | Primary Facility | 2018-10-30 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was water .5' below grade in the cellar and there was no bubbling noticed. The (20x13), (13x9) and (9x5) annuli were venting to the atmosphere. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
For data sources see[9]