If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-21643 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.812831,"lon":-75.786739,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Brooklyn Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: | |
Farm/Lease Name: SQUIER R 6 | |
License Status: | |
Spud Date: | |
Permit Date: 2014-01-13 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.812831 | |
Longitude: -75.786739 |
Date | Event |
---|---|
2014-01-13 | New Permit Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2474555 | Primary Facility | 2016-03-30 | Routine/Partial Inspection | No Violations Noted | The Department was on site at the Squire, R Pad to conduct a Routine Partial Inspection. David Schoonover (DEP-OGI), Jon Sassi (DEP-EPS), and I walked the site and noted that areas on the fill slope do not appear to be temporarily stabilized. Slope drains are present as well. The Department requests that the operator review the noted areas and deploy a method of erosion control that is consistent with your E&S plan. |
For data sources see[5]