Well ID: 37-115-21351 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.971306,"lon":-76.0874,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Apolacon Township | |
Operator Name: REPSOL OIL & GAS USA LLC | |
Well Pad ID: 149733 | |
Farm/Lease Name: REPINE 07 022 02 T 2H | |
License Status: Active | |
Spud Date: 2013-10-12 | |
Permit Date: 2013-07-22 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.971306 | |
Longitude: -76.0874 |
Date | Event |
---|---|
2013-07-22 | New Permit Application |
2013-09-03 | Performed Spud Operation |
2013-11-14 | Drilling Completion |
2014-03-16 | Perforation |
2014-03-28 | Perforation |
2014-03-28 | Performed Stage 1 of Stimulation |
2014-03-29 | Perforation |
2014-03-29 | Performed Stage 2 of Stimulation |
2014-03-29 | Performed Stage 3 of Stimulation |
2014-03-30 | Perforation |
2014-03-30 | Performed Stage 4 of Stimulation |
2014-03-30 | Performed Stage 5 of Stimulation |
2014-03-31 | Perforation |
2014-03-31 | Performed Stage 6 of Stimulation |
2014-04-01 | Perforation |
2014-04-01 | Performed Stage 7 of Stimulation |
2014-04-01 | Performed Stage 8 of Stimulation |
2014-04-02 | Perforation |
2014-04-02 | Performed Stage 10 of Stimulation |
2014-04-02 | Performed Stage 9 of Stimulation |
2014-04-03 | Perforation |
2014-04-03 | Performed Stage 11 of Stimulation |
2014-04-03 | Performed Stage 12 of Stimulation |
2014-04-04 | Performed Stage 13 of Stimulation |
2019-01-11 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-04-04 | 2014-04-04 | 5,686 | 3,935,820 | 26,000 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | AQUCAR DB 5 (Water Treatment Microbiocide) | Trican | Biocide | Sodium Bromide | 7647-15-6 | 1.5 | 0.000397 | 162.539 |
Dibromoacetonitrile | 3252-43-5 | 0.5 | 0.000132 | 54.1796 | ||||
Polyethylene glycol | 25322-68-3 | 65.2 | 0.017263 | 7065.02 | ||||
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 5 | 0.001324 | 541.796 | ||||
FEAC-20 (Iron Control) | Trican | Iron Control | Citric acid | 77-92-9 | 30 | 0.000924 | 378.147 | |
Acetic acid | 64-19-7 | 45 | 0.001386 | 567.22 | ||||
Water | Customer | Carrier | Water | 7732-18-5 | 100 | 80.2597 | 32,846,000.0 | |
3 1/2% HCL | Trican | Carrier | Hydrochloric acid | 7647-01-0 | 3.5 | 0.014274 | 5841.78 | |
100 Mesh, Bulk (over 20K lbs)* | Trican | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 6.76995 | 2,770,580.0 | |
7 1/2% HCL | Trican | Carrier | Hydrochloric acid | 7647-01-0 | 7.5 | 0.009517 | 3894.76 | |
Other Chemicals | Alkyloxypolyethylene oxyethanol | 84133-50-6 | 0 | 0 | 0 | |||
Acrylamide | 79-06-1 | 0 | 0 | 0 | ||||
Ammonium Acrylate | 10604-69-0 | 0 | 0 | 0 | ||||
Trade Secret | Proprietary | 0 | 0 | 0 | ||||
Nonionic Surfactant | Proprietary | 0 | 0 | 0 | ||||
Sorbitol Tetraoleate | 61723-83-9 | 0 | 0 | 0 | ||||
Water | 7732-18-5 | 0 | 0 | 0 | ||||
Isopropanol | 67-63-0 | 0 | 0 | 0 | ||||
Polyethylene glycol monooleate | 9004-96-0 | 0 | 0 | 0 | ||||
Sorbitan monooleate | 1338-43-8 | 0 | 0 | 0 | ||||
Anionic polyacrylamide copolymer | Proprietary | 0 | 0 | 0 | ||||
Acrylamide P/W acrylic acid ammonium salt | 26100-47-0 | 0 | 0 | 0 | ||||
LSI-21 (Scale Inhibitor) | Trican | Scale Inhibitor | Acrylic Polymer | 28205-96-1 | 15 | 0.003884 | 1589.61 | |
Sodium Salt of Phosphate Ester | 68131-72-6 | 15 | 0.003884 | 1589.61 | ||||
White 40/70 | Trican | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 7.68143 | 3,143,600.0 | |
AI-7NR (Acid Inhibitor) | Trican | Acid Inhibitor | Prop-2-yn-1-ol | 107-19-7 | 1 | 0.00001300 | 5.34106 | |
FR-8 | Trican | Friction Reducer | Petroleum distillates, hydrotreated heavy paraffinic | 64742-54-7 | 8 | 0.003954 | 1618.04 | |
Mineral oil/ light hydrotreated pet. distillate | 64742-47-8 | 28 | 0.013838 | 5663.14 | ||||
Ammonium Chloride | 12125-02-9 | 1.5 | 0.000741 | 303.383 | ||||
Petroleum distillates, dewaxed heavy paraffinic | 64742-65-0 | 8 | 0.003954 | 1618.04 | ||||
White 30/50 | Trican | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 4.64805 | 1,902,200.0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-03-28 | 1 | White | 3,209,409 | 7,630 | 8,586 |
2014-03-29 | 2 | White | 3,209,409 | 7,602 | 8,799 |
2014-03-29 | 3 | White | 3,209,409 | 7,562 | 8,743 |
2014-03-30 | 4 | White | 3,209,409 | 7,324 | 8,786 |
2014-03-30 | 5 | White | 3,209,409 | 7,349 | 8,787 |
2014-03-31 | 6 | White | 3,209,409 | 7,356 | 8,533 |
2014-04-01 | 7 | White | 3,209,409 | 7,465 | 8,576 |
2014-04-01 | 8 | White | 3,209,409 | 7,346 | 8,882 |
2014-04-02 | 9 | White | 3,209,409 | 7,050 | 8,497 |
2014-04-02 | 10 | White | 3,209,409 | 6,878 | 8,383 |
2014-04-03 | 11 | White | 3,209,409 | 7,136 | 8,399 |
2014-04-03 | 12 | White | 3,209,409 | 6,963 | 8,118 |
2014-04-04 | 13 | White | 3,209,409 | 6,785 | 8,293 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | REPSOL OIL & GAS USA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | REPSOL OIL & GAS USA LLC | 175,443.60 | 24 | 0.00 | 0 | 0.00 | 0 |
2015 | REPSOL OIL & GAS USA LLC | 1,271,250.40 | 344 | 0.00 | 0 | 0.00 | 0 |
2016 | REPSOL OIL & GAS USA LLC | 920,972.20 | 359 | 0.00 | 0 | 0.00 | 0 |
2017 | REPSOL OIL & GAS USA LLC | 618,220.80 | 280 | 0.00 | 0 | 0.00 | 0 |
2018 | REPSOL OIL & GAS USA LLC | 565,640.70 | 323 | 0.00 | 0 | 0.00 | 0 |
2019 | REPSOL OIL & GAS USA LLC | 448,414.90 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | REPSOL OIL & GAS USA LLC | Drill Cuttings | 1,098.60 Tons | LANDFILL | 8-0728-0004/013 |
2014 | REPSOL OIL & GAS USA LLC | Fracing Fluid Waste | 67.30 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | REPSOL OIL & GAS USA LLC | Fracing Fluid Waste | 100.90 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | REPSOL OIL & GAS USA LLC | Fracing Fluid Waste | 10,043.63 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | REPSOL OIL & GAS USA LLC | Produced Fluid | 19.53 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2015 | REPSOL OIL & GAS USA LLC | Produced Fluid | 784.28 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | REPSOL OIL & GAS USA LLC | Produced Fluid | 929.27 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2015 | REPSOL OIL & GAS USA LLC | Produced Fluid | 2,099.73 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | REPSOL OIL & GAS USA LLC | Soil Contaminated by Oil | 0.01 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101611 |
2016 | REPSOL OIL & GAS USA LLC | Soil Contaminated by Oil & Gas Related Spills | 0.01 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101611 |
2016 | REPSOL OIL & GAS USA LLC | Produced Fluid | 44.98 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | REPSOL OIL & GAS USA LLC | Produced Fluid | 931.13 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | REPSOL OIL & GAS USA LLC | Produced Fluid | 869.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | REPSOL OIL & GAS USA LLC | Other Oil & Gas Wastes | 120.00 Bbl | REUSE (AT WELL PAD) | |
2017 | REPSOL OIL & GAS USA LLC | Produced Fluid | 2,208.73 Bbl | REUSE (AT WELL PAD) | |
2017 | REPSOL OIL & GAS USA LLC | Produced Fluid | 30.89 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | REPSOL OIL & GAS USA LLC | Synthetic Liner Materials | 15.88 Tons | LANDFILL | 8-0728-0004/013 |
2018 | REPSOL OIL & GAS USA LLC | Soil Contaminated by Oil & Gas Related Spills | 0.05 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101611 |
2018 | REPSOL OIL & GAS USA LLC | Produced Fluid | 1,146.94 Bbl | REUSE (AT WELL PAD) | |
2018 | REPSOL OIL & GAS USA LLC | Soil Contaminated by Oil | 0.05 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101611 |
2018 | REPSOL OIL & GAS USA LLC | Produced Fluid | 813.37 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | REPSOL OIL & GAS USA LLC | Produced Fluid | 116.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | REPSOL OIL & GAS USA LLC | Waste Water Treatment Sludge | 0.04 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101611 |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 22.09 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 9.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | REPSOL OIL & GAS USA LLC | Other Oil & Gas Wastes | 38.38 Bbl | REUSE (AT WELL PAD) | |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 193.69 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 414.72 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2202641 | Primary Facility | 2013-08-14 | Routine/Complete Inspection | Violation(s) Noted | . A review of our records indicate that the required minimum 3 day notification for bulk earth disturbance activity after the installation of all perimeter sediment BMP’s was not received. Paragraph 16 of your permits standard conditions clearly states that this is to be done. A review of your construction sequence also clearly states the condition. This inspection qualifies as the required pre-operational inspection. |
2235856 | Primary Facility | 2014-01-07 | Routine/Complete Inspection | No Violations Noted | |
2247623 | Primary Facility | 2014-02-21 | Routine/Complete Inspection | No Violations Noted | Unable to access location due to snow. |
2340897 | Primary Facility | 2015-01-27 | Routine/Complete Inspection | No Violations Noted | The Department was on site on January 27, 2015 to conduct a Routine Complete Inspection of Talisman's Repine Compressor Station. The wells associated with this site are: |
2400660 | Primary Facility | 2015-08-20 | Routine/Complete Inspection | No Violations Noted | |
2451873 | Primary Facility | 2016-02-01 | Routine/Complete Inspection | No Violations Noted | The Department was on site on 2/1/2016 to conduct a Routine Complete Inspection of Talisman's Repine Well Pad (ESG13-115-0059). The wells associated with this site are:
2H 115-21351 3H 115-21352 4H 115-21353
There are no violations. If there are any questions please feel free to contact me. |
2467830 | Primary Facility | 2016-03-16 | Routine/Partial Inspection | No Violations Noted | The Department was on site to conduct a Routine Partial Inspection of the Repine Well Site located in Apolacon Township, Susquehanna County. At the time of the inspection, it appeared as though the well site met temporary stabilization requirements. |
2500982 | Primary Facility | 2016-07-13 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 10:45a.m., the cellar was empty, there was cement between the (20x13) annulus with no gas detected and there was cement between the (13x9) annulus with no gas detected. The (9x5) vent pipe was open and venting into the atmosphere with gas detected at 100% LEL and 100% methane with no measurable flow. There was 574psi on the production casing and 407psi on the production tubing. I took a walk around the location and everything looked OK.
I left the site at 11:20a.m. |
2534677 | Primary Facility | 2016-11-01 | Routine/Complete Inspection | No Violations Noted | The Department was on site on 2/1/2016 to conduct a Routine Complete Inspection of Talisman's Repine Well Pad (ESG13-115-0059). The wells associated with this site are:
2H 115-21351 3H 115-21352 4H 115-21353 The well pad was stable, but due to recent heavy rainfall, the area covered by a bermed liner surrounding the wellheads had about 4 inches of water covering the surface. There was no bubbling from the well cellars apparent, and the water was contained. It would be recommended to vacuum the water from this area to prevent any potential problems. There was adequate vegetation throughout the site and there were no erosional issues apparent at this time. There are no violations. If there are any questions please feel free to contact me |
2588124 | Primary Facility | 2017-04-13 | Routine/Complete Inspection | No Violations Noted | Arrived at the site at 11:35. The weather conditions were partly sunny with temperatures in the upper 40's. Repsol submitted a notification to the Department in Greenport (esubmissions) on 4/11/17 at 4:10 PM for Notice prior to installation of a modular storage structure per 78.56(a)(4) (unconventional wells). The notice indicated the modular storage structure (DYNA tank) construction/ installation would commence on 4/11/17. The following comments were generated upon submission of the notification. " This proposed date does not meet the regulation’s 3 business day advance notice requirement. See the date provided for the question: "* Date and time construction/installation is to begin" If you wish to send this notification to DEP anyway, you may use the Submit button at the bottom of this page to confirm this alert and send. I was accompanied by Frank Hoehle, DEP O&G WQS of the Scranton District Office. We met with Shaun Smith, site company man of Repsol. Mr. Smith stated the following in reference to sit |
2590057 | Primary Facility | 2017-05-02 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 11:00a.m.
The cellar was about a quarter full of water with no bubbling noticed. There was cement at the (20x13) annulus with water setting on top with no bubbling noticed. There was cement at the (13x9) annulus with no gas detected. The (9x5) annulus vent pipe was open and venting into the atmosphere with gas detected at 100% LEL and 100% methane. There was 540psi on the production casing and 336psi on the production line. I took a walk around the location and there were no obvious concerns noticed. I left the site at 11:40a.m. |
2620100 | Primary Facility | 2017-07-18 | Routine/Complete Inspection | No Violations Noted | I arrived at the site at 11:33. I was accompanied by Frank Hoehle, PADEP O&G WQS during the inspection. The weather conditions were partly cloudy skies with a light breeze, very warm and humid with temperatures in the low to mid 80's. Repsol submitted a stimulation notification to the Department on 7/6/17. The notification indicated that stimulation (hydraulic fracturing) of the wells would commence on 7/12/17 at 6 AM. We met with Dave Coxhead, site safety man of REM Security and Dell Gunn, site company man and completions consultant of Repsol. Mr. Gunn and Mr. Coxhead stated the following in reference to site activities. "Frac operations commenced on 7/14/17. The 1H well is in the process of being stimulated in the 5th of the 36th stage. Zipper frac operations are in progress. The 1H, 4H, 5H and 7H wells will be stimulated. The 2H and 3H wells were in production, but are currently shut in". The Department left the site at 12:41. |
2635923 | Primary Facility | 2017-08-30 | Routine/Complete Inspection | No Violations Noted | |
2646387 | Primary Facility | 2017-10-11 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was a 500bbl tank on containment and the containment appeared to be in good condition. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2686308 | Primary Facility | 2018-01-23 | Routine/Complete Inspection | No Violations Noted | I inspected the Repine T well site on Jan 23, 2018. The site access road was paved and in good shape. The site surface had a lot of standing water due to recent heavy rains and snowmelt. Despite the water, the pad surface was solid. The slopes around the site were well vegetated and stable. The wells were all properly labeled. The area where a large water tank had been (now removed) was well graded and had no issues. There were no erosional issues noted.
The wells associated with this site are as follows: 115-21351 115-21352 115-22146 115-22147 115-22148 115-22149 |
2710187 | Primary Facility | 2018-03-22 | Routine/Complete Inspection | No Violations Noted | I performed a Routine Complete inspection of the Repine well pad. Work was being performed involving the sand separators on the well site. The Access road was paved and plowed, and the pad surface was solid and stable. The fill slope and area surrounding the pad and access road were all vegetated, visible through the snow cover. There were no erosional issues observed. The wells were properly labeled.
The wells associated with this site were as follows: 115-21351 115-21352 115-22146 115-22147 115-22148 115-22149 There were no violations noted. |
2752806 | Primary Facility | 2018-07-17 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was water 4.5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. There was a 500bbl tank on containment and the containment appeared to be in good condition. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2760836 | Primary Facility | 2018-08-06 | Routine/Complete Inspection | No Violations Noted | I performed a RTNC inspection of the Repine well site. The wells associated with this site are as follows: 115-21351, 115-21352, 115-22146, 115-22147, 115-22148, 115-22149.
The wells were properly labeled. (Photo 1). The well cellars were full of water due to recent rains. None appeared to be bubbling at the time of inspection. The access road was paved and the macadam was in good shape. There was no erosional issues observed along the access road ditch. The cut slope and topsoil pile were stable and well vegetated. (Photo 2). The fill slope was stable and well vegetated also. (Photo 3). The grasses were perennial. There was no slumping or erosional issues observed at the time of inspection. The pad surface was well graded and stable. There were no violations noted. |
2763189 | Primary Facility | 2018-08-13 | Routine/Complete Inspection | No Violations Noted | While on site for a reported release I performed a perfunctory e & s inspection, as I was recently at the site. There were no erosional issues noted, and all slopes appeared stable despite the monsoon-like rains the area was experiencing.
The wells were properly labeled. There were no violations noted. |
2853977 | Primary Facility | 2019-03-14 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. The cellar was empty with cement between the (20x13) and (13x9) annuli and there was no gas detected with a MSA Altair 5X multi gas detector that was calibrated on 3/13/19. The (9x5) annulus was venting to the atmosphere, see well information for gas show. There was a 500bbl tank about 3/4 full of fluid on containment and the containment appeared to be in good condition. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2202641 | 677507 | 08/14/2013 | 2013-08-14 | 402CSL B - Failure to meet requirements of permit, rules and regulations, or order of DEP. | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
677507 | 302005 | NOV - Notice of Violation |