If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-21211 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.661964,"lon":-75.818694,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Lathrop Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 144968 | |
Farm/Lease Name: CARPENETTI R 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2013-04-09 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.661964 | |
Longitude: -75.818694 |
Date | Event |
---|---|
2013-04-09 | New Permit Application |
2013-05-24 | Performed Spud Operation |
2013-09-13 | Drilling Completion |
2013-10-06 | Perforation |
2013-10-25 | Performed Stimulation |
2014-03-11 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-10-24 | 2013-11-09 | 7,640 | 7,623,210 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 100 Mesh Sand | FTSI | proppant | Silica, Quartz | 14808-60-7 | 100 | 0.00591 | 426000 |
40/70 White | FTSI | proppant | Silica, Quartz | 14808-60-7 | 100 | 0.104987 | 7,567,600.0 | |
FE-100L | FTSI | Iron control | Citric acid | 77-92-9 | 55 | 0.00000944 | 680.53 | |
Water | 7732-18-5 | 60 | 0.00001030 | 742.39 | ||||
BIO-3240 | FTSI | Biocide | Sodium Hydroxide | 1310-73-2 | 23 | 0.00006963 | 5019.05 | |
Water | 7732-18-5 | 55 | 0.000166508 | 12002.1 | ||||
Dazomet (Tetrahydro-3, 5-dimethyl-2H-1, 3, 5-thiadiazine-2-thione. |
533-74-4 | 24 | 0.00007266 | 5237.27 | ||||
CS-500 SI | FTSI | Scale inhibitor | Acrylic Polymer | Proprietary | 0 | 0 | 0 | |
Water | 7732-18-5 | 55 | 0.000165559 | 11933.7 | ||||
Ethylene glycol | 107-21-1 | 10 | 0.00003010 | 2169.76 | ||||
Sodium Polyacrylate | 9003-04-7 | 5 | 0.00001505 | 1084.88 | ||||
Sodium chloride | 7647-14-5 | 6 | 0.00001806 | 1301.86 | ||||
Water | Operator | Carrier | Water | 7732-18-5 | 100 | 0.882027 | 63,577,600.0 | |
HVG-1 | FTSI | Water Gelling Agent | Surfactant | 154518-36-2 | 1 | 0.00000064 | 46.11 | |
Guar Gum | 9000-30-0 | 55 | 0.00003518 | 2536.05 | ||||
Surfactant | 24938-91-8 | 1 | 0.00000064 | 46.11 | ||||
Clay | 14808-60-7 | 2 | 0.00000128 | 92.22 | ||||
Raffinates (Petroleum), Sorption Process | 64741-85-1 | 50 | 0.00003198 | 2305.5 | ||||
Petroleum Distillate | 64742-47-8 | 55 | 0.00003518 | 2536.05 | ||||
Clay | 1302-78-9 | 5 | 0.00000320 | 230.55 | ||||
Surfactant | 9043-30-5 | 1 | 0.00000064 | 46.11 | ||||
BXL-2 | FTSI | Borate crosslinker | Boric acid | 10043-35-3 | 15 | 0.00000260 | 187.39 | |
Potassium hydroxide | 1310-58-3 | 12 | 0.00000208 | 149.91 | ||||
Sodium metaborate | 10555-76-7 | 25 | 0.00000433 | 312.32 | ||||
Water | 7732-18-5 | 75 | 0.00001300 | 936.96 | ||||
CI-150 | FTSI | Acid Corrosion Inhibitor | Organic amine resin salt | Proprietary | 30 | 0.00000287 | 206.64 | |
Diethylene glycol | 111-46-6 | 1 | 0.00000010 | 6.89 | ||||
Alkylene Oxide Block Polymer | Proprietary | 10 | 0.00000096 | 68.88 | ||||
Ethylene Glycol | 107-21-1 | 30 | 0.00000287 | 206.64 | ||||
Water | 7732-18-5 | 5 | 0.00000048 | 34.44 | ||||
Dimethylformamide | 68-12-2 | 10 | 0.00000096 | 68.88 | ||||
Aromatic aldehyde | Proprietary | 10 | 0.00000096 | 68.88 | ||||
Isopropanol | 67-63-0 | 30 | 0.00000287 | 206.64 | ||||
Quaternary ammonium compound | Proprietary | 10 | 0.00000096 | 68.88 | ||||
Fatty Acid | Proprietary | 0.1 | 0.00000001 | 0.69 | ||||
Aliphatic alcohol | Proprietary | 0.1 | 0.00000001 | 0.69 | ||||
Fatty Acid Salt | Proprietary | 0.1 | 0.00000001 | 0.69 | ||||
Hydrochloric Acid (HCl) | FTSI | Acid | Hydrogen Chloride | 7647-01-0 | 15 | 0.000811959 | 58527 | |
Water | 7732-18-5 | 85 | 0.0046011 | 331653 | ||||
FRW-200 | FTSI | Friction reducer | Alcohols (C10-C16), ethoxylated | 68002-97-1 | 4 | 0.00003797 | 2737.01 | |
Acrylamide P/W acrylic acid, ammonium salt | 26100-47-0 | 25 | 0.00023732 | 17106.3 | ||||
Isopropanol | 67-63-0 | 0.3 | 0.00000285 | 205.28 | ||||
Sorbitan Monooleate | 1338-43-8 | 3 | 0.00002848 | 2052.76 | ||||
Alcohols (C12-C14), ethoxylated | 68439-50-9 | 4 | 0.00003797 | 2737.01 | ||||
Acrylamide | 79-06-1 | 0.1 | 0.00000095 | 68.43 | ||||
Polyethylene glycol monooleate | 9004-96-0 | 3 | 0.00002848 | 2052.76 | ||||
Ammonium Chloride | 12125-02-9 | 12 | 0.000113914 | 8211.04 | ||||
Water | 7732-18-5 | 48 | 0.000455655 | 32844.2 | ||||
Copolymer of acrylamide and sodium acrylate | 25987-30-8 | 33 | 0.000313263 | 22580.4 | ||||
Surfactant | Proprietary | 7 | 0.00006645 | 4789.77 | ||||
Dewaxed heavy paraffinic | 64742-65-0 | 1.5 | 0.00001424 | 1026.38 | ||||
Petroleum distillate hydrotreated light | 64742-47-8 | 26 | 0.000246813 | 17790.6 | ||||
Alkyloxypolyethyleneoxyethanol | 84133-50-6 | 1 | 0.00000949 | 684.25 | ||||
Sorbitol Tetraoleate | 61723-83-9 | 2 | 0.00001899 | 1368.51 | ||||
Alcohols (C12-C16), ethoxylated | 68551-12-2 | 4 | 0.00003797 | 2737.01 | ||||
Ammonium Acrylate | 10604-69-0 | 0.5 | 0.00000475 | 342.13 | ||||
Hydrotreated heavy paraffinic | 64742-54-7 | 5 | 0.00004746 | 3421.27 | ||||
APB-1 | FTSI | Gel breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.00000178 | 128 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-10-25 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | CABOT OIL & GAS CORP | 213,058.98 | 36 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 2,428,207.26 | 363 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 1,920,767.72 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 1,501,366.23 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 1,103,877.63 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 924,465.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 529,566.00 | 253 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,394.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 25,123.38 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Drill Cuttings | 767.01 Tons | LANDFILL | 101247 |
2013 | CABOT OIL & GAS CORP | Drill Cuttings | 288.97 Tons | LANDFILL | THR029 |
2013 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 102.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 2,585.25 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 5,448.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 2,852.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 7,520.83 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 483.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2014 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 220.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 6.84 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 780.94 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 286.73 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 325.28 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 160.59 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CABOT OIL & GAS CORP | Soil Contaminated by Oil | 0.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 239.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Soil Contaminated by Oil & Gas Related Spills | 0.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 192.62 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 96.74 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 206.48 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 276.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2167827 | Primary Facility | 2013-05-07 | Routine/Partial Inspection | No Violations Noted | -The roadside ditches have not been lined and they have not been shaped as per design. |
2167938 | Primary Facility | 2013-05-08 | Follow-up Inspection | No Violations Noted | |
2167981 | Primary Facility | 2013-05-02 | Routine/Partial Inspection | No Violations Noted | |
2179934 | Primary Facility | 2013-06-12 | Drilling/Alteration | No Violations Noted | Spudder rig on location |
2489086 | Primary Facility | 2016-05-31 | Site Restoration | No Violations Noted | Inspection of the Carpenetti P1 Well Pad in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit.
The site has been stabilized and vegetation was found to be greater than 70% uniform perennial growth. Temporary E&S BMPs have been removed from the site. No E&S problems were observed at the time of the inspection. The restored pad size is consistent with the PCSM/Site Restoration Plan. Post construction storm water management devices were in place according to approved plans and appear to be functioning properly. Based on the site inspection, I recommend this notice of termination be APPROVED. |
2639143 | Primary Facility | 2017-08-09 | Routine/Complete Inspection | No Violations Noted | Today's inspection, 8/9/17 was conducted as a routine inspection. 4 wells have been drilled and all appear to be in production. Very good stability exists at this site. Perennial vegetation is well established. No violations noted. |
2732843 | Primary Facility | 2018-05-18 | Preoperation Inspection | No Violations Noted | The Department (Casy Baldwin and I) was on site to conduct a Preoperational Inspection in accordance with 3258(a.1). Upon arrival the Department reviewed the E&S Inspection Log which indicated that the most recent inspection was conducted on 5/17/18. The Department met with Mike Murnin (Construction Foreman-Cabot ) and Larry Cheatwood (Company Man-Cabot). This site was previously permitted under ESCGP ESX12-115-0191. The previous ESCGP was Terminated in May of 2016 and was re-permitted under the new ESCGP2 to enlarge the pad and drill an additional 9 wells. At the time of the inspection they were placing shot rock on the site. On the eastern side of the access road where it meets the pad they redlined a ditch on the fill and will grade it back and allow stormwater to travel to the previously existing access road roadside ditch. |
For data sources see[9]