37-115-21167

Well Details

Well ID: 37-115-21167
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Springville Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 146670
Farm/Lease Name: T KROPA 3
License Status:
Spud Date:
Permit Date: 2013-03-11
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.651572
Longitude: -75.932686

For data sources see[1][2][3]

Well History

Date Event
2013-03-11 New Permit Application
2013-04-01 Performed Spud Operation
2013-06-07 Drilling Completion
2013-07-07 Perforation
2013-07-07 Performed Stimulation
2014-03-14 DEVIATED
2016-04-29 New Permit Application

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-07-07 2013-07-14 7,598 5,735,520 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 100 Mesh Sand FTSI Proppant 100 Mesh Sand 14808-60-7 100 0.6191 0
BIO-3240 FTSI Biocide Dazomet (Tetrahydro-3, 5-dimethyl-2H-1,
3, 5-thiadiazine-2-thione.
533-74-4 24 0.00767 0
Sodium Hydroxide 1310-73-2 23 0.00735 0
Water 7732-18-5 55 0.01758 0
Water Operator Carrier Water 7732-18-5 100 87.4473 0
Hydrochloric Acid (HCl) FTSI Acid Hydrogen Chloride 7647-01-0 15 0.09426 0
Water 7732-18-5 85 0.53413 0
CS-500 SI FTSI Scale inhibitor Sodium chloride 7647-14-5 6 0.0019 0
Sodium Polyacrylate 9003-04-7 5 0.00158 0
Water 7732-18-5 55 0.01738 0
Ethylene glycol 107-21-1 10 0.00316 0
40/70 White FTSI Proppant 40/70 White 14808-60-7 100 11.1218 0
FRW-200 FTSI Friction reducer Acrylamide P/W acrylic acid, ammonium salt 26100-47-0 25 0.02109 0
Alcohols (C12-C14), ethoxylated 68439-50-9 4 0.00337 0
Alcohols (C10-C16), ethoxylated 68002-97-1 4 0.00337 0
Water 7732-18-5 48 0.04049 0
Ammonium Acrylate 10604-69-0 0.5 0.00042 0
Copolymer of acrylamide and sodium acrylate 25987-30-8 33 0.02784 0
Acrylamide 79-06-1 0.1 0.00008000 0
Sorbitan Monooleate 1338-43-8 3 0.00253 0
Alkyloxypolyethyleneoxyethanol 84133-50-6 1 0.00084 0
Alcohols (C12-C16), ethoxylated 68551-12-2 4 0.00337 0
Sorbitol Tetraoleate 61723-83-9 2 0.00169 0
Ammonium Chloride 12125-02-9 12 0.01012 0
Petroleum distillate hydrotreated light 64742-47-8 26 0.02193 0
Surfactant Proprietary 7 0.0059 0
Proprietary Component Proprietary 1.5 0.00127 0
Polyethylene glycol monooleate 9004-96-0 3 0.00253 0
FE-100L FTSI Iron control Citric acid 77-92-9 55 0.00109 0
Water 7732-18-5 60 0.00118 0
CI-150 FTSI Acid Corrosion Inhibitor Aromatic aldehyde Proprietary 10 0.00011 0
Ethylene Glycol 107-21-1 30 0.00033 0
Fatty Acid Salt Proprietary 0.1 0.00001000 0
Quaternary ammonium compound Proprietary 10 0.00011 0
Diethylene glycol 111-46-6 1 0.00001000 0
Dimethylformamide 68-12-2 10 0.00011 0
Alkylene Oxide Block Polymer Proprietary 10 0.00011 0
Organic amine resin salt Proprietary 30 0.00033 0
Aliphatic alcohol Proprietary 0.1 0.00001000 0
Water 7732-18-5 5 0.00005000 0
Isopropanol 67-63-0 30 0.00033 0
Fatty Acid Proprietary 0.1 0.00001000 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2013-07-07 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CABOT OIL & GAS CORP 2,387,231.53 162 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 2,657,763.98 365 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 1,284,849.79 359 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 661,946.52 220 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 455,856.17 259 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 343,748.75 364 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 204,160.00 364 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CABOT OIL & GAS CORP Fracing Fluid Waste 658.12 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 15,917.56 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Drill Cuttings 1,044.24 Tons LANDFILL 101247
2013 CABOT OIL & GAS CORP Drilling Fluid Waste 175.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2013 CABOT OIL & GAS CORP Drill Cuttings 279.26 Tons LANDFILL THR029
2013 CABOT OIL & GAS CORP Produced Fluid 138.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2013 CABOT OIL & GAS CORP Fracing Fluid Waste 7,215.24 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Fracing Fluid Waste 31.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2014 CABOT OIL & GAS CORP Produced Fluid 2,356.66 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 4.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2015 CABOT OIL & GAS CORP Produced Fluid 482.61 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 862.09 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 264.90 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 1.27 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Produced Fluid 462.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Produced Fluid 286.87 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 186.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 132.54 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 268.92 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 1.50 Tons LANDFILL 101247

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2150061 Primary Facility 2013-03-21 Routine/Partial Inspection No Violations Noted
2244547 Primary Facility 2014-01-27 Incident- Response to Accident or Event Violation(s) Noted Arrived at the site at 13:30 in response to a spill of (125) gallons of production fluid. GDS was in the process of performing an excavation of the fluid released to the Pad surface as we arrived. Cabot indicated the release occurred as a ball valve blew off a production line next to the gas production units due to the line freezing. It is believed the valve was not properly threaded causing it blow off the top of pipe. As the valve blew off, fluid sprayed out of the pipe impacting the ground surface of the Pad. The location of the impacted area is in between the Forum Energy gas production units. The valve has been replaced. The release occured at 6:30 PM on 1/23/14. NERO EC&B granted Act 2 ROL 5/27/14, closed.
2505858 Primary Facility 2016-07-29 Routine/Complete Inspection No Violations Noted
2513587 Primary Facility 2016-08-23 Drilling/Alteration No Violations Noted
2518581 Primary Facility 2016-09-12 Routine/Complete Inspection No Violations Noted
2525589 Primary Facility 2016-10-04 Routine/Complete Inspection No Violations Noted
2565990 Primary Facility 2017-02-22 Routine/Complete Inspection No Violations Noted The Department (Eric Rooney and I) stopped at the well site after finding that the road seemed to have been collecting sediment from vehicles leaving the site earlier in the day as we were en route to a meeting. At the time of our inspection, it was noted that it appeared as though the access road had recently been maintained. Additionally, it appeared as though sediment was no longer leaving the site in the amount it was prior.
2568347 Primary Facility 2017-02-24 Follow-up Inspection No Violations Noted The Department returned to the site to conduct a Follow-Up Inspection concerning the sediment being deposited on State Route 29. Ken Wilson (EHS Foreman -Cabot Completions) was on site and walked along the access road and SR 29 with me. I also met with Larry Fulmer (Frac Superintendent). We walked along the road and found that the sediment mentioned in the Department's 2/22/2017 inspection is still present. Mr. Wilson explained that they have added rock to an area adjacent to the access road and that they have been adding stone to the access road which has built it up.

While on site I explained that any sediment that originated from their site should be collected and returned to within their limits of disturbance (LOD) and stabilized. I requested that they come up with a plan to remove the sediment in a timely and safe manner. Mr. Wilson also explained that they will be relocating a small pile of sediment adjacent to their access road, near the base of the road, and stabilizing it.

2570095 Primary Facility 2017-03-08 Routine/Complete Inspection No Violations Noted I conducted a Follow-Up Inspection in response to Steve Watson's (Cabot) email dated 2/27/17 concerning the clean up of sediment accumulations along SR 29. Photos attached to the email were dated 2/24/17.
2659478 Primary Facility 2017-11-13 Routine/Complete Inspection No Violations Noted Arrived on location at: 10:00. Weather: Winter mix, Cold, ~ 35 degs. A total of (9) wells have been drilled on this pad, the Kropa, T. 1H, 3H, 4H, 5H, 6H, 7H, 8H, 9H and 10H. All wells were in production at time of inspection. All wells (13x9) and (9x5) annuli were open and venting, plumbed to a common vent tank. The 5H, 6H, 7H, 8H, 9H and 10H wells (20x13) annuli were also open and venting, plumbed to a common vent tank. A Gas check performed at the common annular vent tank showed 100% LEL, 100% CH4. -All wells Prod. casing, Static and Differential pressures were being monitored by wireless sending units to onsite Total Flow Control Unit "TFCU". (See individual well insp. reports for pressures.) - TFCU readings were taken off control panel at ~ 10:45. (SP= static press., CP= prod. casing press., DP= differential press.)

- 3H: SP= 540 psi, CP= 560 psi., DP= 75 psi. - Overall, wells and pad were found in good condition. No obvious concerns noted at time of inspection. No violations noted. Left location at 11:

2659870 Primary Facility 2017-11-13 Routine/Complete Inspection No Violations Noted Ken Kennedy (OGI) was on site during the inspection. There was no activity occurring at the site during the inspection. No violations were noted. If you have any questions, please contact me.
2819602 Primary Facility 2019-03-11 Site Restoration No Violations Noted I arrived onsite at 1405 hours to perform a site restoration inspection of the pad.

As I drove up the access road, I noticed some recently-disturbed areas near infiltration berm 1. It appeared as if equipment had been driven over the grass to create a small muddy trail. The berm itself was well-vegetated.

When I arrived on the pad surface, I observed that most of the pad surface was muddy and in poor condition. GDS was onsite vacuuming up water off both the pad surface and secondary containment. I also noticed additional muddy trails similar in appearance to the one I observed near infiltration berm 1, and these trails appeared to run all along the perimeter of the pad. There was a worker in a bobcat on one of the trails, and piles of filter sock scattered about the site, many of them near these trails.

I contacted Steve Catalfamo (Senior EHS Specialist-Cabot) to ask about the piles of filter sock and the disturbed areas that appeared to be trails of some sort. He did not know offhand, but he had Brody We

2834520 Primary Facility 2019-01-23 Routine/Complete Inspection No Violations Noted I arrived on site at 1449 to conduct a site restoration inspection in response to a post-drilling site restoration report received from the Operator. The weather was ~38 degrees F and cloudy with moderate freezing rain. There was no activity onsite at the time of inspection. The pad surface was plowed but extremely icy.

Vegetative stabilization requirements were unable to be assessed due to snow cover. Another inspection will have to be conducted when the snow melts in order to determine whether the site meets the post-drilling restoration requirements.

No violations were noted. Please contact me with any questions.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2244547 688652 01/27/2014 2014-01-27 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. Environmental Health & Safety NERO EC&B granted Act 2 ROL 5/27/14, closed. Potential for pollutional substances to enter the waters of the commonwealth.
2244547 688653 01/27/2014 2014-01-27 78.57 - Failure to post pit approval number Administrative NERO EC&B granted Act 2 ROL 5/27/14, closed. Failure to collect the brine and other fluids produced during the operation and service of the well in a tank, pit or a series of pits or tanks, or other device approved by the Department for subsequent disposal or reuse.
2244547 688655 01/27/2014 2014-01-27 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. Environmental Health & Safety NERO EC&B granted Act 2 ROL 5/27/14, closed. Failure to properly store, transport, process or dispose of a residual waste.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
688652 307510 NOV - Notice of Violation Comply/Closed 2014-05-27
688653 307510 NOV - Notice of Violation Comply/Closed 2014-05-27
688655 307510 NOV - Notice of Violation Comply/Closed 2014-05-27

For data sources see[9]