Well ID: 37-115-21167 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.651572,"lon":-75.932686,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 146670 | |
Farm/Lease Name: T KROPA 3 | |
License Status: | |
Spud Date: | |
Permit Date: 2013-03-11 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.651572 | |
Longitude: -75.932686 |
Date | Event |
---|---|
2013-03-11 | New Permit Application |
2013-04-01 | Performed Spud Operation |
2013-06-07 | Drilling Completion |
2013-07-07 | Perforation |
2013-07-07 | Performed Stimulation |
2014-03-14 | DEVIATED |
2016-04-29 | New Permit Application |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-07-07 | 2013-07-14 | 7,598 | 5,735,520 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 100 Mesh Sand | FTSI | Proppant | 100 Mesh Sand | 14808-60-7 | 100 | 0.6191 | 0 |
BIO-3240 | FTSI | Biocide | Dazomet (Tetrahydro-3, 5-dimethyl-2H-1, 3, 5-thiadiazine-2-thione. |
533-74-4 | 24 | 0.00767 | 0 | |
Sodium Hydroxide | 1310-73-2 | 23 | 0.00735 | 0 | ||||
Water | 7732-18-5 | 55 | 0.01758 | 0 | ||||
Water | Operator | Carrier | Water | 7732-18-5 | 100 | 87.4473 | 0 | |
Hydrochloric Acid (HCl) | FTSI | Acid | Hydrogen Chloride | 7647-01-0 | 15 | 0.09426 | 0 | |
Water | 7732-18-5 | 85 | 0.53413 | 0 | ||||
CS-500 SI | FTSI | Scale inhibitor | Sodium chloride | 7647-14-5 | 6 | 0.0019 | 0 | |
Sodium Polyacrylate | 9003-04-7 | 5 | 0.00158 | 0 | ||||
Water | 7732-18-5 | 55 | 0.01738 | 0 | ||||
Ethylene glycol | 107-21-1 | 10 | 0.00316 | 0 | ||||
40/70 White | FTSI | Proppant | 40/70 White | 14808-60-7 | 100 | 11.1218 | 0 | |
FRW-200 | FTSI | Friction reducer | Acrylamide P/W acrylic acid, ammonium salt | 26100-47-0 | 25 | 0.02109 | 0 | |
Alcohols (C12-C14), ethoxylated | 68439-50-9 | 4 | 0.00337 | 0 | ||||
Alcohols (C10-C16), ethoxylated | 68002-97-1 | 4 | 0.00337 | 0 | ||||
Water | 7732-18-5 | 48 | 0.04049 | 0 | ||||
Ammonium Acrylate | 10604-69-0 | 0.5 | 0.00042 | 0 | ||||
Copolymer of acrylamide and sodium acrylate | 25987-30-8 | 33 | 0.02784 | 0 | ||||
Acrylamide | 79-06-1 | 0.1 | 0.00008000 | 0 | ||||
Sorbitan Monooleate | 1338-43-8 | 3 | 0.00253 | 0 | ||||
Alkyloxypolyethyleneoxyethanol | 84133-50-6 | 1 | 0.00084 | 0 | ||||
Alcohols (C12-C16), ethoxylated | 68551-12-2 | 4 | 0.00337 | 0 | ||||
Sorbitol Tetraoleate | 61723-83-9 | 2 | 0.00169 | 0 | ||||
Ammonium Chloride | 12125-02-9 | 12 | 0.01012 | 0 | ||||
Petroleum distillate hydrotreated light | 64742-47-8 | 26 | 0.02193 | 0 | ||||
Surfactant | Proprietary | 7 | 0.0059 | 0 | ||||
Proprietary Component | Proprietary | 1.5 | 0.00127 | 0 | ||||
Polyethylene glycol monooleate | 9004-96-0 | 3 | 0.00253 | 0 | ||||
FE-100L | FTSI | Iron control | Citric acid | 77-92-9 | 55 | 0.00109 | 0 | |
Water | 7732-18-5 | 60 | 0.00118 | 0 | ||||
CI-150 | FTSI | Acid Corrosion Inhibitor | Aromatic aldehyde | Proprietary | 10 | 0.00011 | 0 | |
Ethylene Glycol | 107-21-1 | 30 | 0.00033 | 0 | ||||
Fatty Acid Salt | Proprietary | 0.1 | 0.00001000 | 0 | ||||
Quaternary ammonium compound | Proprietary | 10 | 0.00011 | 0 | ||||
Diethylene glycol | 111-46-6 | 1 | 0.00001000 | 0 | ||||
Dimethylformamide | 68-12-2 | 10 | 0.00011 | 0 | ||||
Alkylene Oxide Block Polymer | Proprietary | 10 | 0.00011 | 0 | ||||
Organic amine resin salt | Proprietary | 30 | 0.00033 | 0 | ||||
Aliphatic alcohol | Proprietary | 0.1 | 0.00001000 | 0 | ||||
Water | 7732-18-5 | 5 | 0.00005000 | 0 | ||||
Isopropanol | 67-63-0 | 30 | 0.00033 | 0 | ||||
Fatty Acid | Proprietary | 0.1 | 0.00001000 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-07-07 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | CABOT OIL & GAS CORP | 2,387,231.53 | 162 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 2,657,763.98 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 1,284,849.79 | 359 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 661,946.52 | 220 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 455,856.17 | 259 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 343,748.75 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 204,160.00 | 364 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 658.12 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 15,917.56 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Drill Cuttings | 1,044.24 Tons | LANDFILL | 101247 |
2013 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 175.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Drill Cuttings | 279.26 Tons | LANDFILL | THR029 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 138.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 7,215.24 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 31.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 2,356.66 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 4.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 482.61 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 862.09 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 264.90 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 1.27 Tons | LANDFILL | 101247 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 462.47 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 286.87 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 186.15 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 132.54 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 268.92 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 1.50 Tons | LANDFILL | 101247 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2150061 | Primary Facility | 2013-03-21 | Routine/Partial Inspection | No Violations Noted | |
2244547 | Primary Facility | 2014-01-27 | Incident- Response to Accident or Event | Violation(s) Noted | Arrived at the site at 13:30 in response to a spill of (125) gallons of production fluid. GDS was in the process of performing an excavation of the fluid released to the Pad surface as we arrived. Cabot indicated the release occurred as a ball valve blew off a production line next to the gas production units due to the line freezing. It is believed the valve was not properly threaded causing it blow off the top of pipe. As the valve blew off, fluid sprayed out of the pipe impacting the ground surface of the Pad. The location of the impacted area is in between the Forum Energy gas production units. The valve has been replaced. The release occured at 6:30 PM on 1/23/14. NERO EC&B granted Act 2 ROL 5/27/14, closed. |
2505858 | Primary Facility | 2016-07-29 | Routine/Complete Inspection | No Violations Noted | |
2513587 | Primary Facility | 2016-08-23 | Drilling/Alteration | No Violations Noted | |
2518581 | Primary Facility | 2016-09-12 | Routine/Complete Inspection | No Violations Noted | |
2525589 | Primary Facility | 2016-10-04 | Routine/Complete Inspection | No Violations Noted | |
2565990 | Primary Facility | 2017-02-22 | Routine/Complete Inspection | No Violations Noted | The Department (Eric Rooney and I) stopped at the well site after finding that the road seemed to have been collecting sediment from vehicles leaving the site earlier in the day as we were en route to a meeting. At the time of our inspection, it was noted that it appeared as though the access road had recently been maintained. Additionally, it appeared as though sediment was no longer leaving the site in the amount it was prior. |
2568347 | Primary Facility | 2017-02-24 | Follow-up Inspection | No Violations Noted | The Department returned to the site to conduct a Follow-Up Inspection concerning the sediment being deposited on State Route 29. Ken Wilson (EHS Foreman -Cabot Completions) was on site and walked along the access road and SR 29 with me. I also met with Larry Fulmer (Frac Superintendent). We walked along the road and found that the sediment mentioned in the Department's 2/22/2017 inspection is still present. Mr. Wilson explained that they have added rock to an area adjacent to the access road and that they have been adding stone to the access road which has built it up.
While on site I explained that any sediment that originated from their site should be collected and returned to within their limits of disturbance (LOD) and stabilized. I requested that they come up with a plan to remove the sediment in a timely and safe manner. Mr. Wilson also explained that they will be relocating a small pile of sediment adjacent to their access road, near the base of the road, and stabilizing it. |
2570095 | Primary Facility | 2017-03-08 | Routine/Complete Inspection | No Violations Noted | I conducted a Follow-Up Inspection in response to Steve Watson's (Cabot) email dated 2/27/17 concerning the clean up of sediment accumulations along SR 29. Photos attached to the email were dated 2/24/17. |
2659478 | Primary Facility | 2017-11-13 | Routine/Complete Inspection | No Violations Noted | Arrived on location at: 10:00. Weather: Winter mix, Cold, ~ 35 degs. A total of (9) wells have been drilled on this pad, the Kropa, T. 1H, 3H, 4H, 5H, 6H, 7H, 8H, 9H and 10H. All wells were in production at time of inspection. All wells (13x9) and (9x5) annuli were open and venting, plumbed to a common vent tank. The 5H, 6H, 7H, 8H, 9H and 10H wells (20x13) annuli were also open and venting, plumbed to a common vent tank. A Gas check performed at the common annular vent tank showed 100% LEL, 100% CH4. -All wells Prod. casing, Static and Differential pressures were being monitored by wireless sending units to onsite Total Flow Control Unit "TFCU". (See individual well insp. reports for pressures.) - TFCU readings were taken off control panel at ~ 10:45. (SP= static press., CP= prod. casing press., DP= differential press.)
- 3H: SP= 540 psi, CP= 560 psi., DP= 75 psi. - Overall, wells and pad were found in good condition. No obvious concerns noted at time of inspection. No violations noted. Left location at 11: |
2659870 | Primary Facility | 2017-11-13 | Routine/Complete Inspection | No Violations Noted | Ken Kennedy (OGI) was on site during the inspection. There was no activity occurring at the site during the inspection. No violations were noted. If you have any questions, please contact me. |
2819602 | Primary Facility | 2019-03-11 | Site Restoration | No Violations Noted | I arrived onsite at 1405 hours to perform a site restoration inspection of the pad.
As I drove up the access road, I noticed some recently-disturbed areas near infiltration berm 1. It appeared as if equipment had been driven over the grass to create a small muddy trail. The berm itself was well-vegetated. When I arrived on the pad surface, I observed that most of the pad surface was muddy and in poor condition. GDS was onsite vacuuming up water off both the pad surface and secondary containment. I also noticed additional muddy trails similar in appearance to the one I observed near infiltration berm 1, and these trails appeared to run all along the perimeter of the pad. There was a worker in a bobcat on one of the trails, and piles of filter sock scattered about the site, many of them near these trails. I contacted Steve Catalfamo (Senior EHS Specialist-Cabot) to ask about the piles of filter sock and the disturbed areas that appeared to be trails of some sort. He did not know offhand, but he had Brody We |
2834520 | Primary Facility | 2019-01-23 | Routine/Complete Inspection | No Violations Noted | I arrived on site at 1449 to conduct a site restoration inspection in response to a post-drilling site restoration report received from the Operator. The weather was ~38 degrees F and cloudy with moderate freezing rain. There was no activity onsite at the time of inspection. The pad surface was plowed but extremely icy.
Vegetative stabilization requirements were unable to be assessed due to snow cover. Another inspection will have to be conducted when the snow melts in order to determine whether the site meets the post-drilling restoration requirements. No violations were noted. Please contact me with any questions. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2244547 | 688652 | 01/27/2014 | 2014-01-27 | 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. | Environmental Health & Safety | NERO EC&B granted Act 2 ROL 5/27/14, closed. Potential for pollutional substances to enter the waters of the commonwealth. |
2244547 | 688653 | 01/27/2014 | 2014-01-27 | 78.57 - Failure to post pit approval number | Administrative | NERO EC&B granted Act 2 ROL 5/27/14, closed. Failure to collect the brine and other fluids produced during the operation and service of the well in a tank, pit or a series of pits or tanks, or other device approved by the Department for subsequent disposal or reuse. |
2244547 | 688655 | 01/27/2014 | 2014-01-27 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | NERO EC&B granted Act 2 ROL 5/27/14, closed. Failure to properly store, transport, process or dispose of a residual waste. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
688652 | 307510 | NOV - Notice of Violation | Comply/Closed | 2014-05-27 | |||
688653 | 307510 | NOV - Notice of Violation | Comply/Closed | 2014-05-27 | |||
688655 | 307510 | NOV - Notice of Violation | Comply/Closed | 2014-05-27 |
For data sources see[9]