If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20889 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.906042,"lon":-75.922072,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Silver Lake Township | |
Operator Name: BKV OPR LLC | |
Well Pad ID: 145336 | |
Farm/Lease Name: TRECOSKE NORTH 6H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-03-28 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.906042 | |
Longitude: -75.922072 |
Date | Event |
---|---|
2012-03-28 | New Permit Application |
2012-07-10 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-02-19 | 2014-03-09 | 6,503 | 5,600,910 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Ferrotrol 300L | Baker Hughes | Iron Control | Citric Acid | 77-92-9 | 60 | 0.0020994 | 1122.17 |
Water | Operator | Carrier | Water | 7732-18-5 | 100 | 87.3683 | 46,699,300.0 | |
Sand, White, 30/50 | Baker Hughes | Proppant | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 6.11513 | 3,268,600.0 | |
FRW-18 | Baker Hughes | Friction Reducer | Petroleum Distillates | 64742-47-8 | 30 | 0.0200443 | 10713.9 | |
InFlo 250W | Baker Hughes | Surfactant | Methanol | 67-56-1 | 30 | 0.0002714 | 145.078 | |
Surfactants | Trade Secret | 80 | 0.0007238 | 386.874 | ||||
2-Butoxyethanol | 111-76-2 | 5 | 0.00004520 | 24.1796 | ||||
Sand, White, 100 mesh | Baker Hughes | Proppant | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 0.784082 | 419100 | |
HCl, 5.1 - 7.5% | Baker Hughes | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0461207 | 24652 | |
Water | 7732-18-5 | 92.5 | 0.568822 | 304041 | ||||
Sand, White, 40/70 | Baker Hughes | Proppant | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 4.69532 | 2,509,700.0 | |
CI-14 | Baker Hughes | Corrosion Inhibitor | Olefin | Trade Secret | 5 | 0.00007870 | 42.05 | |
Fatty Acids | Trade Secret | 10 | 0.0001573 | 84.1 | ||||
Methanol | 67-56-1 | 100 | 0.0015734 | 841 | ||||
Propargyl Alcohol | 107-19-7 | 5 | 0.00007870 | 42.05 | ||||
Polyoxyalkylenes | Trade Secret | 30 | 0.000472 | 252.3 | ||||
HCl, 10.1 - 15% | Baker Hughes | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0217039 | 11600.9 | |
Water | 7732-18-5 | 85 | 0.122989 | 65738.7 | ||||
Scaletrol 720 | Baker Hughes | Scale Inhibitor | Calcium Chloride | 10043-52-4 | 5 | 0.0007889 | 421.684 | |
Ethylene Glycol | 107-21-1 | 30 | 0.0047335 | 2530.1 | ||||
Calcium Chloride | Baker Hughes | Salts | Sodium Chloride | 7447-40-7 | 5 | 0.00007020 | 37.5 | |
Potassium Chloride | 7447-40-7 | 5 | 0.00007020 | 37.5 | ||||
Calcium Chloride | 10043-52-4 | 100 | 0.0014032 | 750 | ||||
HCl, 7.6 - 10% | Baker Hughes | Acidizing | Water | 7732-18-5 | 90 | 0.130223 | 69605.6 | |
Hydrochloric Acid | 7647-01-0 | 10 | 0.0144692 | 7733.96 | ||||
Other Chemicals | Ethoxylated Alcohol | Trade Secret | 0 | 0.0013363 | 714.26 | |||
Sodium Chloride | 7647-14-5 | 0 | 0.00000470 | 2.5301 | ||||
Potassium Chloride | 7447-40-7 | 0 | 0.00000790 | 4.2168 | ||||
Modified Thiorea Polymer | 68527-49-1 | 0 | 0.0001101 | 58.87 | ||||
Poly (acrylamide-co-acrylic acid) | Trade Secret | 0 | 0.0200443 | 10713.9 | ||||
Salt | Trade Secret | 0 | 0.0033407 | 1785.65 | ||||
Sorbitan Monooleate | Trade Secret | 0 | 0.0033407 | 1785.65 | ||||
Hydrochloric Acid | 7647-01-0 | 0 | 0.00001570 | 8.41 | ||||
Polyacrylate | Trade Secret | 0 | 0.0031557 | 1686.74 | ||||
Formaldehyde | 50-00-0 | 0 | 0.00001570 | 8.41 | ||||
Water | 7732-18-5 | 0 | 0.057436 | 30700.2 | ||||
Alpha 1427 | Baker Hughes | Biocide | Ethanol | 64-17-5 | 5 | 0.0011451 | 612.063 | |
Glutaraldehyde | 111-30-8 | 30 | 0.0068705 | 3672.38 | ||||
Quaternary Ammonium Compound | 68424-85-1 | 5 | 0.0011451 | 612.063 | ||||
Didecyl Dimethyl Ammonium Chloride | 7173-51-5 | 10 | 0.0022902 | 1224.13 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CARRIZO (MARCELLUS) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CARRIZO (MARCELLUS) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CARRIZO (MARCELLUS) LLC | 322,037.92 | 144 | 0.00 | 0 | 0.00 | 0 |
2015 | CARRIZO (MARCELLUS) LLC | 331,283.86 | 167 | 0.00 | 0 | 0.00 | 0 |
2016 | CARRIZO (MARCELLUS) LLC | 335,923.96 | 212 | 0.00 | 0 | 0.00 | 0 |
2017 | CARRIZO (MARCELLUS) LLC | 381,618.02 | 359 | 0.00 | 0 | 0.00 | 0 |
2018 | BKV OPR LLC | 225,377.55 | 360 | 0.00 | 0 | 0.00 | 0 |
2019 | BKV OPR LLC | 191,841.56 | 364 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CARRIZO (MARCELLUS) LLC | Drill Cuttings | 340.22 Tons | LANDFILL | 301626 |
2013 | CARRIZO (MARCELLUS) LLC | Drill Cuttings | 417.00 Tons | LANDFILL | 100933 |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 1,649.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 497.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 739.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 67,556.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 15,948.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | CARRIZO (MARCELLUS) LLC | Basic Sediment | 29.82 Bbl | LANDFILL | THR029 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 360.75 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 2,472.36 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 364.23 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 1,417.14 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2015 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 647.21 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CARRIZO (MARCELLUS) LLC | Other Oil & Gas Wastes | 8.77 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 610.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 311.32 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 1,878.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 169.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 1,012.52 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 302.83 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | CARRIZO (MARCELLUS) LLC | Other Oil & Gas Wastes | 8.77 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2016 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 320.68 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 1,450.85 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 196.16 Bbl | REUSE (AT WELL PAD) | |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 906.96 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 570.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 43.76 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | BKV OPR LLC | Produced Fluid | 17.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2018 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 360.86 Bbl | REUSE (AT WELL PAD) | |
2018 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 158.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2018 | BKV OPR LLC | Produced Fluid | 17.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2018 | BKV OPR LLC | Other Oil & Gas Wastes | 17.50 Bbl | REUSE (AT WELL PAD) | |
2018 | BKV OPR LLC | Synthetic Liner Materials | 1.15 Tons | LANDFILL | 101247 |
2018 | CARRIZO (MARCELLUS) LLC | Produced Fluid | 3,736.85 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | BKV OPR LLC | Produced Fluid | 632.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2019 | BKV OPR LLC | Produced Fluid | 87.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2019 | BKV OPR LLC | Synthetic Liner Materials | 0.67 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101714 |
2019 | BKV OPR LLC | Produced Fluid | 105.32 Bbl | REUSE (AT WELL PAD) | |
2019 | BKV OPR LLC | Produced Fluid | 1,575.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2068036 | Primary Facility | 2012-04-27 | Routine/Complete Inspection | No Violations Noted | Pre-operations inspection. |
2165455 | Primary Facility | 2013-05-09 | Drilling/Alteration | No Violations Noted | |
2244838 | Primary Facility | 2013-07-03 | Routine/Complete Inspection | No Violations Noted | Unable to access wellhead. Cellar filled with water. Metal grates/wooden boards over cellar. |
2244855 | Primary Facility | 2013-07-03 | Routine/Complete Inspection | No Violations Noted | Unable to access wellhead. Cellar filled with water. Metal grates/wooden boards over cellar. |
2271359 | Primary Facility | 2014-05-08 | Routine/Complete Inspection | No Violations Noted | Flowback procedures were in progress during the inspection. Erick Flowback Services LLC was the subcontractor conducting flowback operations at the site. Items surveyed during the inspection included the secondary containment system for the flowback equipment, the gas buster tanks and frac tank battery next to the Pad berm used to store flowback water, the production containment system and the ground surface of the Pad. I observed several small petroleum sheens, rainbow in color, on the containment near the well heads. The containment systems for the gas buster tanks and frac tank battery consists of (40) mil HDPE liner, an (8) ounce layer of felt below the liner, and an (18) inch corrugated pipe berm. There were areas of compromised integrity observed in the liner in the frac tank containment. Overall, the containment systems at the site appeared to be in good condition. |
2295056 | Primary Facility | 2014-07-15 | Routine/Partial Inspection | No Violations Noted | |
2358367 | Primary Facility | 2015-04-06 | Routine/Complete Inspection | No Violations Noted | |
2413901 | Primary Facility | 2015-10-07 | Routine/Complete Inspection | No Violations Noted | Remarks: At time of inspection, arrived on site at 13:10 p.m., the cellar had water at the bottom, the (13x9) vent pipe was closed, the (9x5) vent pipe was open and venting to a tank, there was about 700psi on the production casing and 443psi on the production line. I took a walk around the site and everything looked OK. |
2474904 | Primary Facility | 2016-03-10 | Routine/Complete Inspection | No Violations Noted | The Department was on site to inspect the Trecoske North Well Site(ESX11-115-0090). The wells associated with the pad are as follows:
115-20884 115-20885 115-20886 115-20887 115-20887 115-20888 115-20889 There was evidence of earth work on site, on cut slope side, from last growing season, however work was mulched and stable. The remainder of the site was stable and well vegetated with no apparent erosional issues. The last company inspection of the erosion and sedimentation controls of the site was on 3/7/2016. There were no violations. If there are any issues please feel free to contact me. |
2511271 | Primary Facility | 2016-08-15 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 12:40p.m., the cellar was about half full of water with no bubbling noticed, the (9x5) vent pipe was open and venting into a tank. There was 595psi on the production casing and 435psi on the production line. I took a walk around the location and everything looked OK. It appeared the wells were recently serviced because there was rig mats stacked and on containment, and a role off container with used containment in it.
I left the site at 13:25p.m. |
2544295 | Primary Facility | 2016-11-03 | Site Restoration | No Violations Noted | The Department was on site to inspect the Trecoske North Well Site(ESX11-115-0090). The wells associated with the pad are as follows:
115-20884 115-20885 115-20886 115-20887 115-20887 115-20888 115-20889 During last growing season, there was work performed on the cut slope side of the pad. This has all grown in well, and the site had in excess of 70% vegetative cover. All BMPs have been removed, and there were no erosional issues with the site at the time of inspection. I recommend APPROVAL of this NOT. There were no violations. If there are any issues please feel free to contact me. |
2602073 | Primary Facility | 2017-06-07 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 10:25a.m.
The cellar was about half full of water with no bubbling noticed. The (9x5) annulus vent pipe was open and venting into the production tank. There was 407psi on the production casing and 295psi on the production line. I took a walk around the location and there were no obvious concerns noticed. I left the site at 11:00a.m. |
2688963 | Primary Facility | 2018-01-30 | Routine/Complete Inspection | No Violations Noted | On January 30, 2017 I inspected the Trekoske well pads. The access road was very solid and stable. The cut and fill slopes were well vegetated where not stone lined. The wells were all clearly and properly labeled and the pad surface was solid. The surrounding farm field edges had been previously undergoing enhancements and cleanup by the landowner near the access road, but the work has been completed and is now growing well and stable. There were no erosional issues noted. The wells associated with this site are the
115-20884 115-20885 115-20886 115-20887 115-20888 115-20889. There were no violations observed |
2709575 | Primary Facility | 2018-03-19 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. The cellar was empty and there was no gas detected. There was a 500bbl flow back tank connected to 5 out of the 6 well on containment and the containment appeared to be in good condition. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2810599 | Primary Facility | 2018-12-05 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was water 1.5¿ below grade in the cellar and there was no bubbling noticed. There was a crew on site working on upgrading the electrical system. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
For data sources see[8]