X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20825

Well Details

Well ID: 37-115-20825
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Bridgewater Township
Operator Name: BKV OPR LLC
Well Pad ID: 145321
Farm/Lease Name: FRYSTAK CENTRAL 5H
License Status:
Spud Date:
Permit Date: 2011-12-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.8662
Longitude: -75.919642

For data sources see[1][2][3]

Well History

Date Event
2011-12-15 New Permit Application
2012-01-05 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-06-20 2013-07-01 6,438 3,814,610 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCl, 10.1 - 15% Baker Hughes Acidizing Water 7732-18-5 85 0.180295 65738.7
Hydrochloric Acid 7647-01-0 15 0.0318168 11600.9
InFlo 250W Baker Hughes Surfactant Surfactants Trade Secret 80 0.0007318 266.81
Methanol 67-56-1 30 0.0002744 100.054
2-Butoxyethanol 111-76-2 5 0.00004570 16.6756
Ferrotrol 300L Baker Hughes Iron Control Citric Acid 77-92-9 60 0.0020748 756.521
Scaletrol 720 Baker Hughes Scale Inhibitor Calcium Chloride 10043-52-4 5 0.0007565 275.831
Ethylene Glycol 107-21-1 30 0.004539 1654.99
Sand, White, 30/50 Baker Hughes Proppant Crystalline Silica (Quartz) 14808-60-7 100 6.04196 2,203,000.0
FRW-18 Baker Hughes Friction Reducer Petroleum Distillates 64742-47-8 30 0.014143 5156.78
Sand, White, 100 mesh Baker Hughes Proppant Crystalline Silica (Quartz) 14808-60-7 100 0.84198 307000
HCl, 5.1 - 7.5% Baker Hughes Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0477252 17401.4
Water 7732-18-5 92.5 0.588611 214617
Alpha 1427 Baker Hughes Biocide Ethanol 64-17-5 5 0.0011123 405.563
Quaternary Ammonium Compound 68424-85-1 5 0.0011123 405.563
Glutaraldehyde 111-30-8 30 0.0066738 2433.38
Didecyl Dimethyl Ammonium Chloride 7173-51-5 10 0.0022246 811.125
CI-14 Baker Hughes Corrosion Inhibitor Olefin Trade Secret 5 0.00003980 14.5
Polyoxyalkylenes Trade Secret 30 0.0002386 87
Propargyl Alcohol 107-19-7 5 0.00003980 14.5
Fatty Acids Trade Secret 10 0.00007950 29
Methanol 67-56-1 100 0.0007954 290
Other Chemicals Salt Trade Secret 0 0.0023572 859.463
Sodium Chloride 7647-14-5 0 0.00000450 1.655
Formaldehyde 50-00-0 0 0.00000800 2.9
Sorbitan Monooleate Trade Secret 0 0.0023572 859.463
Ethoxylated Alcohol Trade Secret 0 0.0009429 343.785
Potassium Chloride 7447-40-7 0 0.00000760 2.7583
Modified Thiorea Polymer 68527-49-1 0 0.00005570 20.3
Hydrochloric Acid 7647-01-0 0 0.00000800 2.9
Polyacrylate Trade Secret 0 0.003026 1103.32
Water 7732-18-5 0 0.0468615 17086.5
Poly (acrylamide-co-acrylic acid) Trade Secret 0 0.014143 5156.78
Water Operator Carrier Water 7732-18-5 100 87.2298 31,805,400.0
Sand, White, 40/70 Baker Hughes Proppant Crystalline Silica (Quartz) 14808-60-7 100 4.93313 1,798,700.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2012 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2013 CARRIZO (MARCELLUS) LLC 354,502.68 143 0.00 0 0.00 0
2014 CARRIZO (MARCELLUS) LLC 559,540.53 337 0.00 0 0.00 0
2015 CARRIZO (MARCELLUS) LLC 257,627.31 180 0.00 0 0.00 0
2016 CARRIZO (MARCELLUS) LLC 297,906.40 210 0.00 0 0.00 0
2017 CARRIZO (MARCELLUS) LLC 460,429.06 345 0.00 0 0.00 0
2018 BKV OPR LLC 208,293.89 228 0.00 0 0.00 0
2019 BKV OPR LLC 325,428.51 236 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CARRIZO (MARCELLUS) LLC Drill Cuttings 244.00 Tons LANDFILL NY STATE #32S11
2012 CARRIZO (MARCELLUS) LLC Drill Cuttings 561.46 Tons LANDFILL 301626
2012 CARRIZO (MARCELLUS) LLC Drill Cuttings 509.00 Tons LANDFILL THR029
2013 CARRIZO (MARCELLUS) LLC Produced Fluid 5,229.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 554.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 19.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 214.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 31,600.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 4,445.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 413.96 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 310.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 150.85 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 819.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 2,047.93 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CARRIZO (MARCELLUS) LLC Other Oil & Gas Wastes 13.13 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 59.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 340.35 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 226.74 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 574.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 252.74 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 108.83 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 CARRIZO (MARCELLUS) LLC Other Oil & Gas Wastes 13.13 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 284.97 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 1,054.85 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 214.80 Bbl REUSE (AT WELL PAD)
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 713.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 399.88 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 CARRIZO (MARCELLUS) LLC Produced Fluid 10,048.93 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2018 BKV OPR LLC Waste Water Treatment Sludge 17.65 Tons LANDFILL 301358
2018 CARRIZO (MARCELLUS) LLC Produced Fluid 149.77 Bbl REUSE (AT WELL PAD)
2018 BKV OPR LLC Filter Socks 0.36 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 BKV OPR LLC Synthetic Liner Materials 5.65 Tons LANDFILL 101247
2018 CARRIZO (MARCELLUS) LLC Produced Fluid 5,882.52 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 BKV OPR LLC Other Oil & Gas Wastes 0.06 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019 BKV OPR LLC Produced Fluid 30.00 Bbl REUSE (AT WELL PAD)
2019 BKV OPR LLC Produced Fluid 900.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2019 BKV OPR LLC Produced Fluid 2,644.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2112220 Primary Facility 2012-11-01 Drilling/Alteration Pending well drilling has progressed to a depth 6650",top of Onandaga is approx. 6413" Conservation formation entered to a depth of 732'
2113268 Primary Facility 2012-11-05 Drilling/Alteration Violation(s) Noted Drilled Pilot hole to 7080'. Tagged Onondaga at 6674' md. Drilled into Oriskany @ 7015' md. Set two cement plugs and have skidded over to Frystak 8H East. Expect to be spudding that well tomorrow morning. Drillers log on site and up to date for Frustak 5H. Violations cited for penetrating Onondaga without a permit to drill a Conservation Well.
2125251 Primary Facility 2012-12-05 Drilling/Alteration No Violations Noted Operator contacted DEP on 12/4/12 and reported drilling into Onondaga formation. Formation shallower than anticipated. Onondaga encountered at 6687' md; 6460 TVD. Oriskany 7018' MD; 6791 TVD. Top of pilot hole 7080' MD. Plugged back - plug #1 = 6215' - 7080' 15 ppg 50/50 poz. Plug #2 = 5350' - 6215' 17ppg Class H. Sidetracked - TOC at 5385'. At 5409 in new hole - TD of well = 11028'.
2176496 Primary Facility 2013-06-19 Drilling/Alteration No Violations Noted pre-frac inspection no problems discovered
2344173 Primary Facility 2015-02-13 Routine/Complete Inspection No Violations Noted The Department was on site to inspect the Frystak Well Pad, ESX11-115-0096. The wells associated with the pad are the:
2369784 Primary Facility 2015-05-14 Routine/Complete Inspection No Violations Noted
2433856 Primary Facility 2015-12-17 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 10:00 a.m., the cellar was about half full of water, the (9x5) vent pipe was open and venting to a tank, there was about 990psi on the tree top. I took a walk around the location and everything looked OK.
2528482 Primary Facility 2016-10-13 Site Restoration No Violations Noted The Department was on site to conduct a Notice of Termination Inspection of the Frystak Well Pad, ESX11-115-0096. The wells associated with the pad are the:

5H (115-20825)


The Frystak site had all temporary BMPs removed and complied with PCSM and Restoration Plan Option 1. The site was stable and well vegetated with no apparent erosional issues.

I recommend APPROVAL of this Notice of Termination for the Frystak Pad.

There were no violations.

If there are any issues please feel free to contact me.

2535790 Primary Facility 2016-11-10 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 11:15a.m., the cellar was full of water with no bubbling noticed, the (9x5) vent pipe was open and venting into a tank. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 12:20p.m.

2566309 Primary Facility 2017-02-23 Routine/Complete Inspection No Violations Noted The Department arrived on site to conduct a Routine Complete Inspection. At the time of the inspection, I reviewed the Inspection Checklist. The checklist showed that the most recent inspection was conducted on December 9, 2016 by Bruce Bonnice. He indicated that the filter sock had been removed.
2624173 Primary Facility 2017-08-09 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 9:15a.m.

The cellar was full of water with no bubbling noticed. The (9x5) annulus vent pipe was open and venting into the production tank. There was 522psi on the production casing and 219psi on the production line. I took a walk around the location and there were no obvious concerns noticed. I left the site at 10:10a.m.

2731177 Primary Facility 2018-05-17 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water 4.5' below grade in the cellar and there was no bubbling noticed, there was no gas detected in the remainder of the cellar. There were three 500bbl tanks on containment and the containment appeared to be in good condition. I took a walk around the location and there were no obvious concerns noticed.

2774382 Primary Facility 2018-09-04 Routine/Complete Inspection No Violations Noted I performed a routine E&S inspection at the Frystack well pad in conjunction with Jon Sassi. The pad had a small slip due to very heavy localized rains, but the fill slope was reworked and stabilized well when I arrived. The area was seeded and mulched as well. The cut slope, pad surface and access road were all in good shape, despite heavy traffic during onsite operations.

There were no violations.

2784005 Primary Facility 2018-09-04 Routine/Complete Inspection No Violations Noted Frank Hoehle, DEP O&G WQS and I arrived at the site at 12:13 to conduct an inspection. The weather conditions are mostly cloudy skies, breezy, warm and humid with temperatures in the mid to upper 70's. Representing BKV at the site is Tom Mattern, Vice President of Operations and Dale Bennett, Site Safety Man. BKV consultants included Kevin Brady of Whitetail Environmental Services and Larry Gerard, Site Company Man. Halliburton is the BKV subcontractor in the process of conducting hydraulic fracturing (stimulation) operations. BKV personnel provided me with following information regarding operations. “Wireline is on the 2H well. Frac is on the 3H well. Perforation casing is on the 2H well. Zipper frac is in progress. Frac operations started on 8/17/18. Frac operations on the 6H and 8H wells have been completed. The 5H and 7H wells were in production, but are currently are shut in. Frac on the 1H well is also in progress. The 4H well has been drilled to total depth but not yet stimulated. We are
2786905 Primary Facility 2018-09-11 Follow-up Inspection No Violations Noted I arrived at the site at 13:11. The weather conditions are mostly cloudy skies, calm winds, and humid with temps in the upper 60's to low 70's. I met with Jesse Bonnice, Senior Production Foreman of BKV, and Kevin Brady, Hydrologist, Environmental Scientist and Wetland Delineator of Whitetail Environmental Services, LLC. The main intent of the follow-up inspection is to evaluate the pad surface and secondary containment on the back side of the pad adjacent to site perimeter berm at the top of the fill slope, due to elevated specific conductance (conductivity) readings measured during the Department's 9/4/18 inspection. Refer to the Department's 9/4/18 inspection report, Inspection ID # 2782158 for additional details.

Frac operations have been recently completed. The next phase of operations to take place at the site is the drilling out of hydraulic fracturing plugs in the he recently stimulated wells, the Frystak 1H-3H, 6H and 8H wells. This will take place in the near future according to Mr. Bonnice

2808731 Primary Facility 2018-11-30 Routine/Complete Inspection No Violations Noted At time of inspection.

The well in production. There was water 1' below grade in the cellar and there was no bubbling noticed. There were twenty eight 500bbl tanks on containment from a recent frac of the 1H, 2H, 3H, 6H and 8H wells. I spoke with Nick Cona of (J P Reilly) and he said 8 of the tanks were being used for production fluid and the rest were empty. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2113268 653034 11/05/2012 2012-11-05 78.12* - Oil or gas well drilled, altered or operated not in accordance with a permit or the regulations. Administrative

For data sources see[8]

References