If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20603 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.764153,"lon":-75.862317,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Dimock Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 149134 | |
Farm/Lease Name: R VANDERMARK 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-07-14 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.764153 | |
Longitude: -75.862317 |
Date | Event |
---|---|
2011-07-14 | New Permit Application |
2011-09-20 | Performed Spud Operation |
2012-01-03 | Drilling Completion |
2012-01-14 | Perforation |
2012-01-14 | Performed Stimulation |
2012-06-22 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-01-27 | 2012-01-27 | 6,560 | 6,945,960 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | WFR-3B | Superior Well Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 50.00 | 0.03 | |
Poly(oxy-1,2-ethanediyl), .alpha.,.alpha.'-[[(9Z)-9-octadecenylimino]di-2,1-ethanediyl]bis[.omega.-hydroxy - |
26635-93-8 | 5.00 | 0.00366000 | |||||
1,2-Propylene glycol | 57-55-6 | 15.00 | 0.01 | |||||
Ethoxylated alcohol blend | 15.00 | 0.01 | ||||||
Water | Carrier/Base Fluid | 100.00 | 88.77 | |||||
AI-2 | Superior Well Services | Corrosion Inhibitor | 2-Butoxyethanol | 111-76-2 | 30.00 | 0.00028000 | ||
Propargyl alcohol | 107-19-7 | 30.00 | 0.00028000 | |||||
Proprietary Component | 7.00 | 0.00007000 | ||||||
Isopropanol | 67-63-0 | 30.00 | 0.00028000 | |||||
Sand (Proppant) | Proppant | 11.03 | ||||||
15 HCl | Superior Well Services | Acid Package | Hydrochloric acid | 7647-01-0 | 15.00 | 0.08 | ||
KR-153SL | Superior Well Services | Biocide | Polyethylene glycol | 25322-68-3 | 50.00 | 0.01 | ||
Diethylene glycol | 111-46-6 | 3.50 | 0.00098000 | |||||
Ethylene glycol | 107-21-1 | 1.00 | 0.00028000 | |||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20.00 | 0.00559000 | |||||
Super TSC | Superior Well Services | Scale Control | Anionic polymer | 15.00 | 0.00390000 | |||
2-Phosphonobutane-1,2,4-tricarboxylic acid, potassium salt | 93858-78-7 | 15.00 | 0.00390000 | |||||
Anionic copolymer | 15.00 | 0.00390000 | ||||||
1,2-Propylene glycol | 57-55-6 | 40.00 | 0.01 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2012-01-14 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 3,740,755.69 | 303 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 2,053,636.33 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 1,282,772.58 | 363 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 514,695.95 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 820,658.75 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 614,432.21 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 547,693.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 437,346.00 | 359 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 615.78 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 10.22 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1,374.52 Tons | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 7.17 Tons | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 12.70 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 24.77 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 3,580.97 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,090.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 5.04 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 42.14 Tons | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 11,691.21 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 8.17 Tons | LANDFILL | 100945 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 12.81 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 166.94 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2012 | CABOT OIL & GAS CORP | Drill Cuttings | 258.93 Tons | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 255.47 Bbl | LANDFILL | THR029 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 759.12 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 427.21 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 716.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 73.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 193.97 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 27.53 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 122.26 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 79.44 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 45.56 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 21.47 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 86.72 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 36.24 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 95.06 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2006917 | Primary Facility | 2011-08-24 | Routine/Complete Inspection | No Violations Noted | |
2011573 | Primary Facility | 2011-10-18 | Routine/Complete Inspection | Violation(s) Noted | DEP on site 11:15. No activity on site. Conductor set. permit number not posted. Violation cited. Operator shall post permit number while drilling. |
2027709 | Primary Facility | 2011-12-07 | Drilling/Alteration | No Violations Noted | Patterson 252. Waiting on fishing tools. Tried runing casing but could not get centralizers through shoe of conductor. Have a mill bit assembly and will be milling out later today. Will be running 13 3/8" once hole cleaned out and cementing with Halliburton. Drillers log on site and up to date. Walked site. Secondary containment in place. One area of plastic near storage tanks should be repaired. No bubbling observed in cellar. |
2028199 | Primary Facility | 2011-12-13 | Drilling/Alteration | Pending | patterson 252. Co. Man Eric Sharp. Plan to install B section on and Schlumberger will be on site to run USIT logs. Currently there are no reported bubbles in cellar. Operator will report all findings to DEP and update with progress of fixing leaking cement job on intermediate string. |
2039828 | Primary Facility | 2012-01-04 | Incident- Response to Accident or Event | Violation(s) Noted | 10/6/12 approx 20 gal prod fluid (brine) released from tanks and impacted soil. 1/4/13 NERO EC&B rec'vd a final report. NERO EC&B Act 2 ROL granted 2/4/13, MBC data clean-up 4/13/15. |
2113563 | Primary Facility | 2012-10-09 | Incident- Response to Accident or Event | No Violations Noted | Violations associated with this inspection have been attached to (115-20604) |
2386684 | Primary Facility | 2015-07-10 | Routine/Complete Inspection | No Violations Noted | |
2440621 | Primary Facility | 2015-09-07 | Routine/Complete Inspection | No Violations Noted | Inspection in conjunction with the notice of termination inspection of the Vandermark Pipeline. No issued observed at the time of the inspection. |
2486434 | Primary Facility | 2016-05-20 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 12:55 p.m., the cellar was full of water with no bubbling noticed, the (20x13) vent pipe was open and venting to a tank, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there was 635psi on the production casing. I took a walk around the location and everything looked OK.
I left the site at 13:20 p.m. |
2641290 | Primary Facility | 2017-09-28 | Site Restoration | No Violations Noted | The Vandermark well site was inspected by me for Notice of Termination (NOT) on September 26, 2017. The site was in very good shape, with no erosional issues occurring at the time of inspection. All slopes were well vegetated, over the 70% required perennial growth and all surfaces were solid and stable. There were two corners of the cut slope which appear to have been repaired with no. 4 stone. These areas were in good shape and appear to have been repaired some time ago. The pad surface was good as well with no apparent ponding issues. The signage in front of the pad was legible and overall the site appeared stable.
There were no violations noted at the time of inspection. I recommend APPROVAL of this NOT. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2011573 | 622432 | 10/18/2011 | 2011-10-18 | 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling | Administrative | permit number not posted. |
2039828 | 631181 | 01/04/2012 | 2012-01-04 | 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | Administrative | NERO EC&B Act 2 ROL granted 2/4/13, MBC data clean-up 4/13/15. |
2039828 | 631182 | 01/04/2012 | 2012-01-04 | 691.1 - Clean Streams Law-General. Used only when a specific CLS code cannot be used | Administrative | NERO EC&B Act 2 ROL granted 2/4/13, MBC data clean-up 4/13/15. 402- potential for pollutional substances to enter the waters of the Commonwealth |
2039828 | 631183 | 01/04/2012 | 2012-01-04 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | NERO EC&B Act 2 ROL granted 2/4/13, MBC data clean-up 4/13/15. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
631181 | 280218 | NOV - Notice of Violation | Comply/Closed | 2013-02-04 | |||
631182 | 280218 | NOV - Notice of Violation | Comply/Closed | 2013-02-04 | |||
631183 | 280218 | NOV - Notice of Violation | Comply/Closed | 2013-02-04 |
For data sources see[9]