If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20563 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.862878,"lon":-75.964553,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Forest Lake Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148592 | |
Farm/Lease Name: J HAWLEY 7 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-05-10 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.862878 | |
Longitude: -75.964553 |
Date | Event |
---|---|
2011-05-10 | New Permit Application |
2011-06-13 | Performed Spud Operation |
2011-09-04 | Drilling Completion |
2011-12-24 | Perforation |
2011-12-24 | Performed Stimulation |
2012-06-22 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-12-26 | 2011-12-26 | 6,296 | 4,881,366 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | KR-153SL | Superior Well Services | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20.00 | 0.00543000 | |
Diethylene glycol | 111-46-6 | 3.50 | 0.00095000 | |||||
Polyethylene glycol | 25322-68-3 | 50.00 | 0.01 | |||||
Ethylene glycol | 1.00 | 0.00027000 | ||||||
Super TSC | Superior Well Services | Scale Control | Anionic polymer | 15.00 | 0.00392000 | |||
Anionic copolymer | 15.00 | 0.00392000 | ||||||
2-Phosphonobutane-1,2,4-tricarboxylic acid, potassium salt | 93858-78-7 | 15.00 | 0.00392000 | |||||
1,2-Propylene glycol | 57-55-6 | 40.00 | 0.01 | |||||
AI-2 | Superior Well Services | Corrosion Inhibitor | Propargyl alcohol | 107-19-7 | 30.00 | 0.00029000 | ||
2-Butoxyethanol | 111-76-2 | 30.00 | 0.00029000 | |||||
Isopropanol | 67-63-0 | 30.00 | 0.00029000 | |||||
Proprietary Component | 7.00 | 0.00007000 | ||||||
15 HCl | Superior Well Services | Acid Package | Hydrochloric acid | 7647-01-0 | 15.00 | 0.08 | ||
WFR-3B | Superior Well Services | Friction Reducer | Ethoxylated alcohol blend | 15.00 | 0.01 | |||
1,2-Propylene glycol | 57-55-6 | 15.00 | 0.01 | |||||
Poly(oxy-1,2-ethanediyl), .alpha.,.alpha.'-[[(9Z)-9-octadecenylimino]di-2,1-ethanediyl]bis[.omega.-hydroxy - |
26635-93-8 | 5.00 | 0.00339000 | |||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 50.00 | 0.03 | |||||
Sand (Proppant) | Proppant | 100.00 | 10.94 | |||||
Water | Carrier/Base Fluid | 100.00 | 88.86 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-12-24 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 920,429.32 | 345 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 744,120.52 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 355,728.62 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 190,026.30 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 383,637.65 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 450,063.60 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 338,964.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 296,357.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 736.02 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.89 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 317.07 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1,107.52 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1.15 Tons | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 2.67 Tons | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 47.21 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 7,597.74 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 27.50 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 35.08 Tons | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 11,029.79 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 69.54 Tons | LANDFILL | 100945 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 8.07 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 95.71 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 2,742.65 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 1,883.68 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 95.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 1,884.11 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 18.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 794.83 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 778.92 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 593.88 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 392.23 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 219.95 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 27.10 Bbl | REUSE (AT WELL PAD) | |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 2,318.34 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 32.41 Bbl | REUSE (AT WELL PAD) | |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 1,293.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 972.21 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 1,857.06 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 9.51 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2143134 | Primary Facility | 2011-08-19 | Drilling/Alteration | No Violations Noted | Patterson 538 currently on J. Hawley 6H. Have TD'd well and preparing to cement long string. Conductor set for 7H at 101'. Plan to skid tomorrow to 7H. No violations observed at this time. |
2407829 | Primary Facility | 2015-09-17 | Routine/Complete Inspection | No Violations Noted | |
2505650 | Primary Facility | 2016-07-28 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 8:55a.m., the cellar was about half full of water with no bubbling noticed, the (13x9) vent pipe was open and venting into a tank, the (9x5) vent pipe was open and venting into a tank, there was 568psi on the production casing. There was a crew doing remedial work on the lower side of the location, I took a walk around the location and everything looked OK.
I left the site at 9:50a.m. |
2600903 | Primary Facility | 2017-06-01 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 14:05p.m.
The cellar was about three quarters full of water with no bubbling noticed. The (13x9) annulus vent pipe was open and venting into a small plastic tank, the (9x5) annulus vent pipe was open and venting into a small plastic tank. There was 562psi on the production casing and 475psi on the production line. I took a walk around the location and there were no obvious concerns noticed. I left the site at 14:45p.m |
2648776 | Primary Facility | 2017-10-18 | Routine/Complete Inspection | No Violations Noted | I inspected the J. Hawley pad for Notice of Termination on October 3, 2017. The site was well constructed and had no apparent erosional problems. The vegetation was at or exceeding 70%.
There were no violations noted. I recommend APPROVAL of this NOT. |
2709556 | Primary Facility | 2018-03-16 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was water and ice 1.5' below grade in the cellar and there was no bubbling noticed. The (13x9) and (9x5) annuli vent pipes were connected together and going to the same tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2710108 | Primary Facility | 2018-03-26 | Routine/Complete Inspection | No Violations Noted | I inspected the J. Hawley well pad on March 26, 2018. It was sunny and about 38 degrees out. The access road was solid and the pad surface was partly snow covered yet stable. The cut and fill slopes were not steep and were well vegetated. The wells associated with the site are as follows:
115-20515 115-20516 115-20518 115-20560 115-20561 115-20563 There were no apparent erosional issues. There were no violations noted. |
2808808 | Primary Facility | 2018-11-30 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. The cellar was full of water and there was no bubbling noticed. The (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 11/2/18. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
For data sources see[9]