If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20463 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.864436,"lon":-75.944919,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Forest Lake Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148373 | |
Farm/Lease Name: FRASER 5 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-11-16 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.864436 | |
Longitude: -75.944919 |
Date | Event |
---|---|
2010-11-16 | New Permit Application |
2011-01-21 | Performed Spud Operation |
2011-03-29 | New Permit Application |
2011-05-05 | Drilling Completion |
2011-07-19 | Perforation |
2011-08-20 | Performed Stimulation |
2011-10-04 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-07-29 | 2011-07-29 | 6,205 | 5,501,496 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Scaletrol 720 | BJ Services Company | Scale Inhibitor | Ethylene glycol | 107-21-1 | 35.00 | 0.00368000 | |
Diethylene glycol | 111-46-6 | 5.00 | 0.00053000 | |||||
XLW-32 | BJ Services Company | Crosslinker | Methanol | 67-56-1 | 90.00 | 0.00333000 | ||
Boric oxide | 1303-86-2 | 20.00 | 0.00074000 | |||||
GBW-15C | BJ Services Company | Breaker | Sodium chloride | 7647-14-5 | 15.00 | 0.00002000 | ||
Sand (Proppant) | Proppant | 100.00 | 11.41 | |||||
FRW-18 | BJ Services Company | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | ||
Ferrotrol 300L | BJ Services Company | Iron Control Product | Citric acid | 77-92-9 | 70.00 | 0.00089000 | ||
BF-7L | BJ Services Company | High pH Buffer | Carbonic acid, dipotassium salt | 584-08-7 | 50.00 | 0.00436000 | ||
Alpha 1427 | BJ Services Company | Antibacterial Agent | Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 7.00 | 0.00160000 | ||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 10.00 | 0.00228000 | |||||
Ethanol | 64-17-5 | 5.00 | 0.00114000 | |||||
Glutaraldehyde | 111-30-8 | 30.00 | 0.00684000 | |||||
GW-3LD Green | BJ Services Company | Gellant | Naphtha, petroleum, hydrotreated heavy | 64742-48-9 | 60.00 | 0.01 | ||
Guar gum | 9000-30-0 | 60.00 | 0.01 | |||||
CI-14 | BJ Services Company | Corrosion Inhibitor | Methanol | 67-56-1 | 68.00 | 0.00060000 | ||
Propargyl alcohol | 5.00 | 0.00004000 | ||||||
Water | Carrier/Base Fluid | 100.00 | 88.41 | |||||
15 HCl | BJ Services Company | Acid Package | Hydrochloric acid | 7647-01-0 | 15.00 | 0.08 | ||
Clay Master-5C | BJ Services Company | Clay Stabilization | No hazardous ingredients | 0.00058000 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-08-20 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 57,914.20 | 47 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 305,028.48 | 362 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 249,133.77 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 138,055.35 | 300 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 100,599.17 | 280 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 161,470.57 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 161,670.65 | 344 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 154,331.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 135,196.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 10.19 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 482.21 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.12 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 3.70 Bbl | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 740.53 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 124.10 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 1,753.07 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 46.11 Tons | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 139.00 Bbl | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1.20 Tons | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 18,865.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 1.31 Tons | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 11,587.23 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 33.72 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 7.12 Tons | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 1,990.15 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 12.65 Tons | LANDFILL | 100945 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 45.97 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 56.42 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 136.65 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 3,577.62 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 2,996.08 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 73.75 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 15.80 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 3,728.44 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 74.17 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 1,744.54 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 44.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 1,132.89 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 1,425.09 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 500.05 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 3,643.79 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 48.31 Bbl | REUSE (AT WELL PAD) | |
2017 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 1.09 Tons | LANDFILL | 101247 |
2017 | CABOT OIL & GAS CORP | Waste Water Treatment Sludge | 1.00 Tons | REUSE (AT WELL PAD) | |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 380.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 66.44 Bbl | REUSE (AT WELL PAD) | |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 2,168.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 1,725.24 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Other Oil & Gas Wastes | 0.21 Tons | LANDFILL | 100933 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 3,522.82 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 17.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1939556 | Primary Facility | 2010-12-29 | Routine/Complete Inspection | No Violations Noted | |
1968893 | Primary Facility | 2011-04-20 | Drilling/Alteration | No Violations Noted | Pioneer Rig 61. Glenn Broussard - Com. Man. Followed BJ Services into site. Will be cementing 9 5/8' string later today. Co. Man provided copy of cement details (attached to inspection report). Walked site with Co. Man. Discussed site conditions - need to improve containment - excessive standing water on pad. maintenance needed in solids handling area - boards need repair and maintenance under open containers. DEP wil follow up on site conditions. Checked cellar - no issues observed. |
2018892 | Primary Facility | 2011-11-09 | Routine/Complete Inspection | No Violations Noted | DEP on site 11:30. Well tenders on site doing production work. Well is online. 6" water in cellar. no bubbling observed. WEll tag present. Site id sign present. Four other wells drilled and completed on site. 1V (not online), and 3H, 7H and 8H which are online. No violations observed. |
2045901 | Primary Facility | 2012-02-13 | Incident- Response to Accident or Event | No Violations Noted | Violations and specifics associated with this inspection report can be referred to in the Fraser 1 inspection report for 2-13-12 Permit number is 115-20447. |
2052562 | Primary Facility | 2012-03-13 | Follow-up Inspection | No Violations Noted | Violations and specifics associated with this inspection report can be referred to in the Fraser 1 3-13-12 inspection report. Permit number is 115-20447. |
2335271 | Primary Facility | 2015-01-09 | Routine/Complete Inspection | No Violations Noted | The Department was on site at the Hawley J, Pad 1. to perform a Routine Complete Inspection. The wells on this site are the 2H, 3H, 4H, 5H, 6H and 7H. The Numbers, respectively, are 115-20516, 20515, 20560, 20518, 20561, and 20463. The site's last E&S inspection was on 1-7-2015. The site was adequately vegetated and stable. There were no violations. |
2354524 | Primary Facility | 2015-03-24 | Routine/Complete Inspection | No Violations Noted | |
2377269 | Primary Facility | 2015-06-04 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a routine complete inspection of the erosion and sedimentation controls at the Fraser E. well pad (ESX10-115-0020) on June 4, 2015. The wells associated with this pad are as follows: |
2422217 | Primary Facility | 2015-11-04 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 11:20, the cellar was full of water, the (20x13) vent pipe was open and venting to a tank, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there were no pressure gauges on the well, I took a walk around the location and everything looked OK. |
2502284 | Primary Facility | 2016-07-13 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a routine complete inspection of the erosion and sedimentation controls at the Fraser E. well pad (ESX10-115-0020) on June 4, 2015. The wells associated with this pad are as follows:
1V 115-20447 2H 115-20477 3H 115-20473 4H 115-20493 5H 115-20463 7H 115-20464 8H 115-20474 The site was in production, and not under any major construction at this time and the site was very well vegetated (>70%) and graded well. Surrounding the site active agriculture (haying operation) was occurring. There were no erosion and sedimentation issues on site and the access road was holding up well.
If there are any questions please feel free to contact me at (570)346-5539. |
2516412 | Primary Facility | 2016-08-30 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 9:30a.m., the cellar was full of water with no bubbling noticed, the (20x13) vent pipe was open and venting into a tank, the (13x9) vent pipe was open and venting into a tank, the (9x5) vent pipe was open and venting into a tank. There was 458psi on the production casing. I took a walk around the location and everything looked OK.
I left the site at 10:15a.m. |
2549891 | Primary Facility | 2017-01-05 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a routine complete inspection of the erosion and sedimentation controls at the Fraser E. well pad (ESX10-115-0020) on June 4, 2015. The wells associated with this pad are as follows:
1V 115-20447 2H 115-20477 3H 115-20473 4H 115-20493 5H 115-20463 7H 115-20464 8H 115-20474 The site was in production, and not under any major construction at this time and the site was very well vegetated (>70%) and graded well. The vegetation surrounding the site has been mowed, and is in great shape. There were no erosion and sedimentation issues on site and the access road was holding up well.
If there are any questions please feel free to contact me at (570)346-5539. |
2568301 | Primary Facility | 2017-02-23 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a Routine Complete Inspection. This well site's ESCGP permit number is 5809802. I reviewed the E&S Inspection Log to find that Mike Brilla (TEC) conducted the most recent inspection on 2-14-17. He identified it as a post precipitation inspection. |
2596334 | Primary Facility | 2017-05-17 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 10:20a.m.
There was a service crew on site to run 2¿ tubing in the wells to enhance production. I met with company man Jim Restly of Restly Oil & Gas Consulting. The tubing was pulled out of the 1V well and will be run in the 5H well. The 3H well has tubing in it and an additional 300' to 400' will be added. The 7H and 8H wells do not have tubing in them but will have new tubing run in them. The production units are also being refurbished. I took a walk around the location and there were no obvious concerns noticed. I left the site at 11:25a.m. |
2645561 | Primary Facility | 2017-10-10 | Site Restoration | No Violations Noted | I inspected the Fraser pad for Notice of Termination (NOT) on October 3, 2017. The site was older but well maintained and all vegetation was very well established. The pad surface was in great shape with no erosional issues apparent at the time of inspection.
There were no violations observed. I recommend APPROVAL of this NOT. |
2703563 | Primary Facility | 2018-03-06 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was snow and ice 2' below grade in the cellar and was unable to check for gas. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2710114 | Primary Facility | 2018-03-26 | Routine/Complete Inspection | No Violations Noted | I inspected the site on March 26, 2018. The weather was sunny and approximately 40 degrees. The access road was solid and stable. The pad surface was solid and the cut and fill slopes were well vegetated and stable. The wells were labeled clearly. The wells associated with this site were as follows:
115-20447 115-20463 115-20464 115-20473 115-20474 115-20477 115-20493 (plugged) |
2740440 | Primary Facility | 2018-06-12 | Routine/Complete Inspection | No Violations Noted | I performed a RTNC inspection of the Fraser Pad. The wells associated with this are the 115-20447, 115-20463, 115-20464, 115-20473, 115-20474, 115-20477 (plugged), 115-20493 (plugged). The wells were properly labeled.
The access road was solid and stable as was the pad surface. There was no puddling onsite. There did not appear to be any issues of concern with the site stability. The cut slope as well as the fill slope was stable and well vegetated. They were gently sloped and there did not appear to be any erosional issues. There were no violations. |
2800727 | Primary Facility | 2018-11-08 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was water 1' below grade in the cellar and there was no bubbling noticed. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 11/2/18. There were five 55 gallon drums on containment (see photo) marked paint waste, a crew from Covanta Environmental Solutions arrived on site to remove the drums as I was about to leave. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
For data sources see[9]