37-115-20377

Well Details

Well ID: 37-115-20377
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Lathrop Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 148675
Farm/Lease Name: KERR UNIT
License Status: Inactive
Spud Date:
Permit Date: 2010-05-19
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: No
Latitude: 41.697639
Longitude: -75.840083

For data sources see[1][2][3]

Well History

Date Event
2010-05-19 New Permit Application
2010-06-19 Performed Spud Operation
2010-07-18 Drilling Completion
2011-03-01 Perforation
2011-03-01 Performed Stimulation
2012-02-06 NEWLY DRILLED
2016-09-20 Inactive Well Request Granted

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-03-16 2011-03-16 7,630 729,708
2 2011-03-15 2011-03-15 8,000 411,726

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 BE-9M Halliburton Energy Services Biocide Tributyl tetradecyl phophonium
chloride 81741-28-8
5.0
- 10.0 Methanol

67-56-1 10.0 - 30.0
0.01
Tributyl tetradecyl phophonium
chloride 81741-28-8
5.0
- 10.0 Methanol

67-56-1 10.0 - 30.0
CS 650 OS Halliburton Energy Services Oxygen Scavenger Ammonium bisulfite 10192-30-0 0.01
Nickel Chelate Catalyst
n/a
2.00
Water Base Fluid Fresh Water 100.00 86.35
Sand (Proppant) Halliburton Energy Services Propping Agent
Quartz 14808-60-7 99.90 13.51
LP-65 Halliburton Energy Services Scale Inhibitor Ammonium Chloride

12125-02-9 5.0 - 10.0
0.05
FRW-66 Halliburton Energy Services Friction Reducer Hydrotreated Light Distillate

64742-47-8 10.0 - 30.0
0.06
2 FRW-18 BJ Services Company Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 0.06
Water Base Fluid Water 100.00 89.21
Alpha 1427 BJ Services Company Biocide Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1
Ethanol 64-17-5
Water 7732-18-5
Didecyl dimethyl ammonium chloride 7173-51-5
Glutaraldehyde 111-30-8 0.02
Sand (Proppant) BJ Services Company Propping Agent Quartz 14808-60-7 99.90 10.63
Scaletrol 720 BJ Services Company Scale Inhibitor Ethylene glycol 107-21-1 0.05
Diethylene glycol 111-46-6
Techni-Hib 604 BJ Services Company Oxygen Scavenger Ammonium bisulfite 10192-30-0 75.00 0.01
Water 7732-18-5 5.00

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2011-03-01 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2011 CHIEF OIL & GAS LLC 119.00 1 0.00 0 0.00 0
2012 CHIEF OIL & GAS LLC 135.00 27 0.00 0 0.00 0
2013 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2014 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHIEF OIL & GAS LLC Produced Fluid 111.00 Bbl REUSE OTHER THAN ROAD SPREADING
2018 CHIEF OIL & GAS LLC Produced Fluid 43.10 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1899502 Primary Facility 2010-07-07 Drilling/Alteration No Violations Noted
1918865 Primary Facility 2010-10-08 Drilling/Alteration Pending Gas Migration is a problem with this well, it is leaking between the 13-3/8"-and 16". Follow-up investigation will follow.
1923944 Primary Facility 2010-10-12 Routine/Complete Inspection Violation(s) Noted inspected well head for evidence of gas leakage. Dep personnel Steve Watson, KEvin Costello, Bruce Jankura. Cellar has 1' of standing water. Constant bubbling present on outside of 13 3/8" casing. Well is shut in and has not been fracced. Chief notified of condition of well.
2009107 Primary Facility 2011-09-12 Routine/Complete Inspection No Violations Noted
2327711 Primary Facility 2014-11-25 Routine/Partial Inspection No Violations Noted release occurred at 2:58 AM on 11/25/14. Originally staff estimated that 20 bbl. were lost but after they calculated loss it was 8.6 bbl. so they re-estimated 8-10bbl of synthetic oil based drill mud (Invert). The Patterson 254 rig was on site drilling the Kerr Unit 3H well when the release occurred. It was reported that the hose ruptured releasing the product onto the cage and barrier on the well site. Originally, an estimated 2 bbl. were released to the well site and the remainder was to containment. When the Department made the site visit, Mr. Vales explained that the thinks it was less than a gallon that reached the well site. The impacted area was reported as being a 1’X3’X1” section of pad. Chief explained that they immediately shut down the rig and began to contain the material. Southland was hired to pressure wash the area and Patrik’s Vacuum and Wash Services LTD. Was hired to vacuum the site.
2443023 Primary Facility 2016-01-20 Incident- Response to Accident or Event No Violations Noted Arrived at site at 12:00 in response to an estimated (8-10) barrel spill to secondary containment of a combination of freshwater and re-use water. Universal Well Services is the subcontractor for Chief performing hydraulic fracturing operations. According to Chief Personnel on-site, Universal is on the 18th stage of frac operations on the 3H well and frac operations should be completed for the well tomorrow, 1/21/16. The Kerr 1H, 2H and 3V wells were in production, but are currently shut in. The spill occurred during the 17th stage of the frac. The result of the spill was sand washing out an elbow/90 degree joint of the iron flow line while under pressure. Fluid was released out of the flow pipe onto containment as the sand wore away the pipe. The reuse water is production fluid from other Chief Well Sites transported to the site via trucks. There was no evidence the fluid spilled escaped containment and impacted the ground surface of the well pad.
2445595 Primary Facility 2016-01-28 Routine/Complete Inspection No Violations Noted On 1/28/2016, the Department conducted an inspection of the Chief Kerr Unit Well Pad in response to a complaint that hydraulic fracturing activities currently occurring on this pad are causing the ground to vibrate off-site and that the noise levels from the pad activity are extremely loud. Upon arrival at the site, I parked at the entrance to the well pad just off the side of the Dimock to Nicholson Road. The well pad is approximately 300’ from the road. During the inspection, the operation was pressured up with an active frac job occurring. The noise levels experienced from my location at the entrance was not unusual for this type of operation and did not reach a level which I felt required hearing protection. No vibrations were felt while standing at the access road entrance. No action is required of Chief for this complaint at this time.
2445693 Primary Facility 2016-01-25 Routine/Complete Inspection No Violations Noted Inspection in response to an estimated 25-gallon spill of a combination of freshwater and re-use water. I was accompanied by Jon Sassi, DEP Environmental Protection Specialist. Rich Adams of Chief Oil and Gas contacted the Department approximately 3PM on Friday, January 22, 2016 to report the spill. Mr. Adams reported that an estimated 25 gallons of a combination of fresh and brine water was spilled onto the dirt/gravel of the access road to the Kerr Unit Pad while moving equipment during fracking operations due to a missing or uninstalled cap. I contacted Mr. Adams via telephone for more information upon receiving the notification. Mr. Adams confirmed that a combination of fresh/brine water had spilled from equipment (missile) as it was moved onto the incline of the access road. He further stated that clean-up of the spill was underway; affected dirt and gravel was being removed from the access road and stock piled onto containment. Violations were immediately corrected. Violations were to the 3H well, i
2473899 Primary Facility 2016-03-24 Routine/Complete Inspection No Violations Noted Inspection of the Kerr Unit Pad in conjunction with the Notice of Termination inspection for the Kerr B Lateral Pipeline. Crews were removing containment and equipment from the recent fracking of the 3H and 4H wells. There were two spills reported to the Department during these fracking operations. One occurred on the pad itself on January 19, 2016 when an elbow on frack piping ruptured during fracking of the 3H, and the other occurred on January 22, 2016 on the access road of the pad while moving equipment around in preparation of the 4H. The Department responded to both incidents. No staining or other indications of soil impact was noticed during a quick observation of the pad in the area of the spill, but there was still some containment and equipment staged on the pad so the area could not be fully assessed at the time of the inspection.
2502537 Primary Facility 2016-07-11 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2509978 Primary Facility 2016-08-10 Follow-up Inspection Outstanding Violations - No Viols Req'd
2544730 Primary Facility 2016-11-22 Routine/Complete Inspection No Violations Noted The Department was on site to conduct a routine complete inspection of the Kerr Unit 1H-3H well site (ESX11-115-0031).

The wells associated with this site are as follows: 115-20212 115-20276 115-20377 115-21772 115-21773

The Kerr site is an older site, and was stable and vegetated well. There were no erosional problems with the site at this time and the site appeared to be built to specification.

There are no violations.

If there are any questions, feel free to contact me at (570)346-5539

2709069 Primary Facility 2018-03-14 Routine/Complete Inspection No Violations Noted Arrived at site at: 09:00. Weather: Light snow, cold, ~25 degs. Onsite in response to application received for Reg. Inactive Status for the 2H well on this pad. A total of (5) wells have been drilled on this pad. The 1H, 3H &4H wells were in production. The 2H and 3V were shut-in at time of inspection. The 3V well was put on Reg. Inactive Status on 9/20/16. All (5) wells had prod. trees "PT" installed atop wellheads. The 1H, 2H, 3H &4H were tied into production units. Prod. tree top press. "PTTP", Prod. casing press. "PCP" and Prod. line press. "PLP", were being monitored by wireless data sending units and/or analog gauges. The 1H, 3H and 4H wells had (2) annular vents present at the (9x5) and (13x9) annuli. These wells (9x5) vents were open and venting to shared poly vent tanks. The 3H and 4H wells had (13x9) vents open and venting to shared poly tanks. The 1H wells (13x9) annulus was shut-in at time of inspection. The 2H well had (1) annular vent present at the (9x5) annulus and was open and venting to sha
2828105 Primary Facility 2019-01-14 Routine/Complete Inspection No Violations Noted I performed a RTNC inspection of the Kerr well pad. The weather was sunny, cloudless and cold, at around 17 degrees F.

The entrance was in good shape, as was the access road. They were both in good shape and solid with no rills or erosional problems noted.

The cut and fill slopes were well vegetated. The vegetation was healthy and quite thick. There were a few personal items from the landowner staged on the wellpad.

There was some activity in the compressor station but there did not appear to any detrimental effects to the pad surface.

The erosion and sedimentation log was up so date and there were no erosional issuesnoted there.

There were no violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1923944 598335 10/12/2010 2010-10-12 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative
1923944 598336 10/12/2010 2010-10-12 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used Administrative cited 601.207 failure to prevent gas migration into sources of fresh groundwater.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
598335 378961 NOV - Notice of Violation
598336 378961 NOV - Notice of Violation

For data sources see[9]

References