If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20366 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.697617,"lon":-75.855056,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148115 | |
Farm/Lease Name: COSNER 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-07-27 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.697617 | |
Longitude: -75.855056 |
Date | Event |
---|---|
2010-07-27 | New Permit Application |
2010-12-27 | Performed Spud Operation |
2011-03-24 | Drilling Completion |
2011-05-29 | Perforation |
2011-05-29 | Performed Stimulation |
2011-11-01 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-07-07 | 2011-07-07 | 7,379 | 3,901,800 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Ferrotrol 300L | BJ Services Company | Iron Control Product | Citric acid | 77-92-9 | 70.00 | 0.00095000 | |
FRW-18 | BJ Services Company | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.03 | ||
15 HCl | BJ Services Company | Acid Package | Hydrochloric acid | 7647-01-0 | 15.00 | 0.09 | ||
BF-7L | BJ Services Company | High pH Buffer | Carbonic acid, dipotassium salt | 584-08-7 | 50.00 | 0.00159000 | ||
Scaletrol 720 | BJ Services Company | Scale Inhibitor | Ethylene glycol | 107-21-1 | 35.00 | 0.00374000 | ||
Diethylene glycol | 111-46-6 | 5.00 | 0.00053000 | |||||
GBW-15C | BJ Services Company | Breaker | Sodium chloride | 7647-14-5 | 15.00 | 0.00008000 | ||
Alpha 1427 | BJ Services Company | Antibacterial Agent | Didecyl dimethyl ammonium chloride | 7173-51-5 | 10.00 | 0.00229000 | ||
Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 7.00 | 0.00161000 | |||||
Ethanol | 64-17-5 | 5.00 | 0.00115000 | |||||
Glutaraldehyde | 111-30-8 | 30.00 | 0.00688000 | |||||
GW-3LD Green | BJ Services Company | Gellant | Naphtha, petroleum, hydrotreated heavy | 64742-48-9 | 60.00 | 0.04 | ||
Guar gum | 9000-30-0 | 60.00 | 0.04 | |||||
CI-14 | BJ Services Company | Corrosion Inhibitor | Methanol | 67-56-1 | 68.00 | 0.00064000 | ||
Propargyl alcohol | 5.00 | 0.00005000 | ||||||
XLW-32 | BJ Services Company | Crosslinker | Boric oxide | 1303-86-2 | 20.00 | 0.00040000 | ||
Methanol | 67-56-1 | 90.00 | 0.00178000 | |||||
Water | Carrier/Base Fluid | 100.00 | 88.61 | |||||
Sand (Proppant) | Proppant | 100.00 | 11.15 | |||||
Clay Master-5C | BJ Services Company | Clay Stabilization | No hazardous ingredients | 0.00062000 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-05-29 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 346,466.50 | 133 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 628,721.39 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 361,084.34 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 332,490.96 | 352 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 230,309.77 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 256,532.51 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 218,815.23 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 192,282.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 166,737.00 | 353 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 664.91 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 161.95 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 11.67 Bbl | LANDFILL | 100955 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 5.04 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 0.25 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 384.16 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 9.42 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 667.37 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 1,309.27 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 3,541.40 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1.50 Tons | LANDFILL | NY # 50S08 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.72 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 0.25 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 658.48 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1.12 Tons | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 5.04 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2011 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 8.49 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 1.32 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 9.11 Bbl | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 18.00 Tons | LANDFILL | NY STATE #32S11 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 6.87 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD014286009 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 4.35 Tons | LANDFILL | 132310 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 6.89 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 3.61 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 7.67 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 20.40 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 1,563.81 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 178.98 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 343.79 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 550.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 47.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 292.92 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 5.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 217.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 230.15 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 169.42 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 137.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 220.26 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 80.22 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 330.43 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1918609 | Primary Facility | 2010-09-22 | Routine/Complete Inspection | No Violations Noted | The well is under construction in a field off of SR 3004. The following facilities are also present on this site: 115-20404, 115-20405, and 115-20406. Grading and blasting operations were being conducted during the inspection. No drilling rig is on site. Exposed soil in areas that were not under construction are seeded, mulched, and are growing. Sediment controls are in place but alterations do not meet current plan. Please update the Control Plan. Sediment filter sock has been installed; however, the support stakes were installed at shallow depths (<12 inches). Please correct the installation of the support stakes. |
1954717 | Primary Facility | 2011-02-24 | Drilling/Alteration | No Violations Noted | skidded over to Cosner 2H. Drilling water string and intermediate on water based mud. will be switching over to synthetic oil based mud to drill out intermediate. |
1960364 | Primary Facility | 2011-03-16 | Drilling/Alteration | No Violations Noted | H&P 290. Trippping out of hole at time of inspection. Walked site with Company Man. Drillers log on site and up to date. Site conditions very neat and clean. Secondary containment in place. Drilling with synthetic oil-based mud. |
2007585 | Primary Facility | 2011-09-01 | Routine/Complete Inspection | No Violations Noted | |
2033209 | Primary Facility | 2012-01-06 | Incident- Response to Accident or Event | No Violations Noted | Violations and specifics associated with this inspection report can be referred to in the Cosner 5H inspection report for 1-6-12. Permit number is 115-20404. |
2053596 | Primary Facility | 2012-01-10 | Follow-up Inspection | No Violations Noted | Violations and specifics associated with this inspection report can be referred to in the Cosner 5H 1-0-12 inspection report. Permit number is 115-20404. |
2436424 | Primary Facility | 2015-12-29 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a Notice of Termination (NOT) for the Cosner W P1 well site. The wells associated with this site are as follows: |
2552137 | Primary Facility | 2017-01-06 | Administrative/File Review | No Violations Noted | |
2720357 | Primary Facility | 2018-04-18 | Routine/Complete Inspection | No Violations Noted | Arrived on location at: 11:30. Weather: Clear, cool, ~ 40 degs. (4) wells were present and in production, the Cosner 4H, 5H, 2H & 3H. All wells (13 3/8"x 9 5/8") and (9 5/8"x 5 1/2") annuli were open and venting, plumbed to a common, shared vent tank. A Gas check performed at shared vent tank showed 100% LEL, 100% CH4. *Due to the possible commingling of gas within the (13x9) and (9x5) annular vents to shared vent tank, a follow-up inspection will need to be scheduled to check the (13x9) cemented annuli for any sustained presence of gas. Please contact me when these (13x9) vents can be isolated and rechecked. (kenkennedy@pa.gov).
- All wells Prod. casing, Static and Differential pressures were being monitored by wireless sending units sending data to onsite Total Flow Control Unit "TFCU". Well pressures were taken off of TFCU readouts beside each wells gas production units "GPUs". See individual well pressures listed below: (PCP= prod. casing press., SP= static press., DP= differential press.) - 4H: PCP = |
2724369 | Primary Facility | 2018-04-30 | Follow-up Inspection | No Violations Noted | Arrived on location at: 08:45. Weather: Clear, cool, ~ 40 degs. (4) wells were present and in production, the Cosner 4H, 5H, 2H & 3H. Onsite in follow-up to recheck the isolated, venting (13 3/8"x 9 5/8") cemented annuli as requested in initial insp. report of 4/18/18. Upon arrival I met with Cabot O&G Rep., Aaron Onks. This morning Aaron had isolated all (4) wells (13 3/8"x 9 5/8") annuli and vented to atmosphere at ~ 08:00. Gas checks were performed at all (4) wells (13 3/8"x 9 5/8") annuli using a ALTAIR 5X gas meter, calibrated on 4/26/18. No gas was detected at any of the wells (13 3/8"x 9 5/8") cemented annuli. It appears that the initial gas detected at the shared poly vent tank on 4/18/18 was from the (9 5/8"x 5 1/2") annuli vents. Being that all (4) wells 5 1/2" casing cement was left down, beneath the intermediate casing shoe, this venting is expected and not a violation.
- Following the gas rechecks, Aaron realigned and opened all (4) wells (13 3/8"x 9 5/8") and (9 5/8"x 5 1/2") annuli vents to c |
For data sources see[9]