Well ID: 37-115-20186 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.742144,"lon":-76.103072,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Rush Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 148566 | |
Farm/Lease Name: HUNSINGER 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2009-06-25 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.742144 | |
Longitude: -76.103072 |
Date | Event |
---|---|
2009-06-25 | New Permit Application |
2009-10-30 | Performed Spud Operation |
2009-11-25 | Drilling Completion |
2010-03-10 | Perforation |
2010-03-11 | Performed Stimulation |
2011-04-08 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2010-03-11 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | CHESAPEAKE APPALACHIA LLC | 1,543,075.50 | 208 | 0.00 | 0 | 0.00 | 0 |
2011 | CHESAPEAKE APPALACHIA LLC | 961,615.00 | 197 | 0.00 | 0 | 0.00 | 0 |
2012 | CHESAPEAKE APPALACHIA LLC | 794,916.00 | 260 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 985,136.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CHESAPEAKE APPALACHIA LLC | 764,677.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 328,874.00 | 295 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 559,611.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 427,402.00 | 353 | 0.00 | 0 | 0.00 | 0 |
2018 | CHESAPEAKE APPALACHIA LLC | 334,732.00 | 353 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 435,446.00 | 359 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 2,176.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 972.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 4,387.89 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 722.08 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 455.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 83.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 72.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 101.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 46.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 36.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 8.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 15.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 0.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1845236 | Primary Facility | 2009-11-16 | Drilling/Alteration | No Violations Noted | At time of inspection drilling depth at 8586' in middle of lateral. TD proposed to be 11,400'. Operator will be setting 5-1/2" production string at TD. Nomac Rig 112 on site. I met with CO. Man Dorsey Rogers, and Drilling Supt. Hayward White on site. |
1846589 | Primary Facility | 2009-11-30 | Follow-up Inspection | Violation(s) Noted | The discharge line was over-pressurized which caused the rope to break and the hose to come loose. It was reported that approximately 8 barrels of water-based drilling mud was spilled onto the ground. According to Mr. Keith, the spill occurred at approximately 2:00 am on 11/30/09. |
1884561 | Primary Facility | 2010-01-05 | Follow-up Inspection | Viol(s) Noted & Immediately Corrected | |
2031980 | Primary Facility | 2012-01-05 | Routine/Complete Inspection | No Violations Noted | On site 9:15 am. No activity on site. Well is online. No noticeable leaks or gas bubbling in cellar. Security fence partially installed around wells. |
2045505 | Primary Facility | 2011-10-23 | Administrative/File Review | No Violations Noted | Flowback Fluid Spill Notification and Emergency Response Document. |
2113651 | Primary Facility | 2012-11-06 | Routine/Partial Inspection | Pending | During the inspection it was noted that the site appeared to have reached >70% perennial vegetative cover. No E&S controls were found to be installed during the inspection. The plan maps reflect that 18” silt fence was to be installed however the fence was redlined as of 3/17/2010 by “JHF” and18” composite sock was to replace the fence. An additional section of sock was also redlined into the plan in the north side of the well site between the pad and the access road. It was noted on the plan map the the filter sock was removed as of 11/2/2010 with “JR” initials. Geotextile material was noted to be in the area of the removed filter sock. In the course of the inspection, it was noted that areas to the west of the well pad between the pad and the access road had wetlands flagged. The flagged areas do not appear to be detailed on the 11/12/2009 plan maps. Vegetation commonly associated with wetlands was noted within feet of the fill slope.Additionally, it appears that rock and timber were situated in this area. |
2359296 | Primary Facility | 2015-04-08 | Routine/Complete Inspection | No Violations Noted | The Department was on site to conduct a routine complete inspection of the Hunsinger well site. The site was well vegetated and stable. There was no recent E&S Inspection on site. |
2361841 | Primary Facility | 2015-04-16 | Routine/Complete Inspection | No Violations Noted | |
2415780 | Primary Facility | 2015-10-15 | Routine/Complete Inspection | No Violations Noted | |
2450168 | Primary Facility | 2016-02-17 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 9:30 a.m., the cellar was full of water and ice with no bubbling noticed, the (13x9) vent pipe was open and set up with a pop valve with 0psi on it and the valve going to the tank was closed, the was no vent pipe on the (9x5). There was 0psi on the production casing and 900psi on the production line. I took a walk around the location and everything looked OK.
I left the site at 10:10 a.m. |
2736887 | Primary Facility | 2018-05-25 | Routine/Complete Inspection | No Violations Noted | The Department arrived on site at 1230 hrs to conduct a RTNC inspection. The Department was represented by Frank Hoehle (WQS-DEP) and myself.
Proper signage was displayed at the entrance to the access road. The access road was mostly solid and stable. However, several areas containing minor erosion were present on the access road, which the Department recommends be addressed promptly. Water bars were also in place which were slightly deteriorated but functional. While examining the production fluid tanks on site, the Department noticed that one of the tanks displayed significant corrosion, including pitting, and heavy staining. The Department requests that the deteriorated tank be examined and either replaced or repaired. The Department noticed that a new empty tank was present on site, most likely for this purpose. The cut slope and fill slope were both well-vegetated and stable with no apparent erosional issues. The pad surface was also solid and stable. The well heads were all clearly and properly lab |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1846589 | 576725 | 11/30/2009 | 2009-11-30 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | violation 78.56 and SWMA 35 Section 6018.301 cited in NOV dated 11/30/09 |
1884561 | 587042 | 01/05/2010 | 2010-01-05 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | 78.56 Failure to contain a pollutional substance in a lined pit or tank |
1884561 | 587043 | 01/05/2010 | 2010-01-05 | 691.1 - Clean Streams Law-General. Used only when a specific CLS code cannot be used | Administrative | 691.402 Potential pollution |
1884561 | 587044 | 01/05/2010 | 2010-01-05 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | 6018.301 Failure to manage a residual waste |
For data sources see[8]