Well ID: 37-115-20177 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.725275,"lon":-75.908914,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Dimock Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148552 | |
Farm/Lease Name: HOOVER 2H SE | |
License Status: | |
Spud Date: | |
Permit Date: 2009-06-25 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.725275 | |
Longitude: -75.908914 |
Date | Event |
---|---|
2009-06-25 | New Permit Application |
2009-09-19 | Performed Spud Operation |
2009-12-19 | Perforation |
2009-12-31 | Drilling Completion |
2010-03-13 | Performed Stimulation |
2010-10-27 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2010-03-13 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | CABOT OIL & GAS CORP | 943,079.50 | 232 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 659,301.00 | 352 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 457,001.60 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 338,179.36 | 363 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 361,074.07 | 345 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 193,187.43 | 273 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 292,251.75 | 357 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 231,647.53 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 186,662.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 171,246.00 | 359 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | Drilling | 2,550.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0027057 |
2009 | CABOT OIL & GAS CORP | Drilling | 1,100.00 Bbl | Municipal Sewage Treatment Plant | PA0026034 |
2009 | CABOT OIL & GAS CORP | Drilling | 119.00 Bbl | Brine or Industrial Waste Treatment Plt | PAR9000009 |
2010 | CABOT OIL & GAS CORP | Basic Sediment | 2.22 Bbl | LANDFILL | 101534 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 58.60 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101247 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 193.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CABOT OIL & GAS CORP | Produced Fluid | 327.51 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 16.60 Tons | LANDFILL | NY # 50S08 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 95.40 Tons | LANDFILL | NY # 02S17 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 116.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 1.20 Tons | LANDFILL | 100955 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 55.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 95.40 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 8-4630-00010/00 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 119.05 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 1.15 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 270.27 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 0.91 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 0.91 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 149.74 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 45.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 44.95 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 249.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 88.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 10.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 53.78 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 42.82 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 21.74 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 100.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 88.27 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1830157 | Primary Facility | 2009-09-18 | Drilling/Alteration | Viol(s) Noted & Immediately Corrected | |
1841111 | Primary Facility | 2009-10-14 | Drilling/Alteration | No Violations Noted | : At time of inspection depth of drilling was at 1507¿. Operator was in process of running pressure test on their BOP¿s. A bond log was completed on the surface casing. During installation of surface casing, there were no returns of cement to surface. Operator pumped 30% excess downhole. An additional 120 sks of grout was pumped on the backside of the surface casing. According to Operator, the bond log showed a good bond to depth. A copy of the bond log was provided to DEP. Bond log was completed approximately 8 hours after cementing. |
1841682 | Primary Facility | 2009-10-18 | Routine/Complete Inspection | No Violations Noted | |
1849749 | Primary Facility | 2009-12-10 | Drilling/Alteration | No Violations Noted | Drilling rig on site is Pioneer Rig #63. Depth of drilling was 7670¿ (in lateral). TD proposed for this well is 8552¿. Operator is planning on setting packers on production string. Reserve pit had approximately 8 ¿ 10¿ of freeboard and liner appeared to be in good condition. |
1890369 | Primary Facility | 2010-05-24 | Routine/Complete Inspection | No Violations Noted | |
1967277 | Primary Facility | 2011-04-13 | Site Restoration | Violation(s) Noted | |
1967724 | Primary Facility | 2011-04-15 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
2138004 | Primary Facility | 2013-02-05 | Follow-up Inspection | Violation(s) & Outstanding Violations | Arrived at the site at 9:20 AM. I encountered Steve Watson, OGI, leaving the site on the access road as I was mobilizing to the site. He informed me of a brine spill that occurred at the site on 2/4/13. Upon arrival on the Well Pad, I met with Brody Webster and Randi Matthew of Cabot and Charles Minturn and Mallory Santoro of Civil and Environmental Consultants Incorporated. Mr. Webster informed me that the spill occurred at 20:30 on 2/4/13. The spill occurred as result of a production fluid tank falling off a front end loader as the tank was being mobilized off-site as Cabot was in preparation to remove the mud shelf section of the pit. Production fluid leaked out of the tank and impacted the surface of the ground on the Well Pad. The quantity of the release was determined to be one barrel, (42) gallons. |
2138579 | Primary Facility | 2013-02-07 | Follow-up Inspection | Violation(s) & Outstanding Violations | Between 12:05 and 12:30 the remaining section of the felt layers and the liner in the mud shelf were pulled back to examine the condition of the ground below. I observed dark gray material and dark staining primarily in the eastern section of the pit, NE corner of the Well Pad. The surface of the ground appeared darker in color from the center of the mud shelf to the eastern section. Compromised felt and liner integrity were observed, in particular where the highest concentration of dark gray material and staining was observed. Also, hay was observed on the ground surface at the bottom of the mud shelf. Apparently, hay has been utilized as a sub base below the felt underlying the liner. |
2140765 | Primary Facility | 2013-02-06 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Throughout the course of the day, Cabot continued the process of removing the contents of the mud shelf section of the drilling pit. The depth of the mud shelf is believed to be (4) feet. The top (3) feet of the material in the mud shelf has been mostly removed and the excavation has reached to the eastern section of the shelf, close to the wooden stakes used to delineate the boundary of the shelf in the NE corner of the Well Pad. As the overlying felt layer of the liner was pulled back in several areas in preparation for disposal, dark gray material and dark staining was observed mainly on top of the liner. Some small punctures and perforations were observed in the liner as well. The liner and underlying felt layer were not pulled out of position to determine if the ground below was impacted. This phase of the operation is most likely to take place tomorrow, 2-7-13. |
2397715 | Primary Facility | 2015-08-12 | Routine/Complete Inspection | No Violations Noted | |
2439612 | Primary Facility | 2016-01-07 | Site Restoration | No Violations Noted | Inspection conducted of the COG Hoover D P1 Well Pad covered under E&S permit # 58-09-802b20. Inspection conducted on 1/7/16. The inspection was conducted to confirm COG’s assessment that the site meets the minimum requirements as defined in Chapter 102.22(C) for permanent stabilization which would thus fulfill the physical requirements necessary for the permits termination. The Department’s determination is that the entire site is in fact permanently stabilized and meets the criteria necessary for the permit’s termination. I recommend this notice of termination be approved. |
2490195 | Primary Facility | 2016-06-03 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 9:00 a.m., the cellar had water at the bottom with no bubbling noticed, the (9x5) vent pipe was open and venting to a tank, I couldn’t get a pressure reading on the production casing. I took a walk around the location and everything looked OK.
I left the site at 9:45 a.m. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1830157 | 572132 | 09/18/2009 | 2009-09-18 | 201A - Failure to have permit on site during drilling | Environmental Health & Safety | Permit generated |
1967277 | 609245 | 04/13/2011 | 2011-04-13 | 78.62 - Improper encapsulation of waste | Administrative | |
2138004 | 660265 | 02/05/2013 | 2013-02-05 | 691.1 - Clean Streams Law-General. Used only when a specific CLS code cannot be used | Administrative | O&G review of report under small spill aspect of policy, final remediation summary report is adequate, closed, MBC 4/25/15. 691.402; Potential Pollution |
2138004 | 660266 | 02/05/2013 | 2013-02-05 | 78.57 - Failure to post pit approval number | Administrative | O&G review of report under small spill aspect of policy, final remediation summary report is adequate, closed, MBC 4/25/15. Failure to collect the brine and other fluids produced during the operation and service of the well in a tank, pit or a series of pits or tanks, or other device approved by the |
2138004 | 660267 | 02/05/2013 | 2013-02-05 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | O&G review of report under small spill aspect of policy, final remediation summary report is adequate, closed, MBC 4/25/15. |
2138579 | 660493 | 02/07/2013 | 2013-02-07 | 691.1 - Clean Streams Law-General. Used only when a specific CLS code cannot be used | Administrative | NERO EC&B granted Act 2 ROL 5/17/13, closed. 691.402; Potential Pollution |
2138579 | 660494 | 02/07/2013 | 2013-02-07 | 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | Administrative | NERO EC&B granted Act 2 ROL 5/17/13, closed. |
2138579 | 660495 | 02/07/2013 | 2013-02-07 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | NERO EC&B granted Act 2 ROL 5/17/13, closed. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
660265 | 293871 | NOV - Notice of Violation | Administrative Close Out | 2013-02-27 | |||
660266 | 293871 | NOV - Notice of Violation | Administrative Close Out | 2013-02-27 | |||
660267 | 293871 | NOV - Notice of Violation | Administrative Close Out | 2013-02-27 | |||
660493 | 294018 | NOV - Notice of Violation | Comply/Closed | 2013-05-17 | |||
660494 | 294018 | NOV - Notice of Violation | Comply/Closed | 2013-05-17 | |||
660495 | 294018 | NOV - Notice of Violation | Comply/Closed | 2013-05-17 |
For data sources see[8]