If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20047 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.73648,"lon":-75.862799,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Dimock Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 149151 | |
Farm/Lease Name: RATZEL 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2008-05-14 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.736480 | |
Longitude: -75.862799 |
Date | Event |
---|---|
2008-05-14 | New Permit Application |
2008-10-31 | Performed Spud Operation |
2009-04-08 | Drilling Completion |
2009-08-08 | Perforation |
2009-08-08 | Performed Stimulation |
2009-09-17 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2009-08-08 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | 1216864.00 | 132 | 0.00 | 0 | 0.00 | 0 |
2010 | CABOT OIL & GAS CORP | 1,706,622.50 | 341 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 681,888.25 | 348 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 455,895.98 | 364 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 407,005.87 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 269,279.55 | 222 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 528,374.46 | 297 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 370,101.72 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 335,319.60 | 360 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 310,326.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 236,720.00 | 250 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | Brine | 4,467.00 Bbl | Municipal Sewage Treatment Plant | PA0026034 |
2009 | CABOT OIL & GAS CORP | Brine | 1,949.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0008451 |
2009 | CABOT OIL & GAS CORP | Drilling | 3,080.00 Bbl | Municipal Sewage Treatment Plant | PA0026034 |
2009 | CABOT OIL & GAS CORP | Drilling | 300.00 Bbl | Brine or Industrial Waste Treatment Plt | PAR9000009 |
2009 | CABOT OIL & GAS CORP | Brine | 1,650.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0027057 |
2009 | CABOT OIL & GAS CORP | Brine | 491.00 Bbl | Brine or Industrial Waste Treatment Plt | PAR9000009 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 65.80 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101247 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 217.30 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CABOT OIL & GAS CORP | Produced Fluid | 265.22 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010 | CABOT OIL & GAS CORP | Basic Sediment | 2.60 Bbl | LANDFILL | 101534 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 18.60 Tons | LANDFILL | NY # 50S08 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 107.10 Tons | LANDFILL | NY # 02S17 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 130.80 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 1.40 Tons | LANDFILL | 100955 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 107.10 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 8-4630-00010/00 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 1.22 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 312.37 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 0.60 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 59.55 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 13.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 26.52 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 79.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 60.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2014 | CABOT OIL & GAS CORP | Servicing Fluid | 216.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Servicing Fluid | 540.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 145.98 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 17.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 86.96 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 99.65 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 17.65 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Servicing Fluid | 1.02 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 21.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 61.82 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 19.02 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1738462 | Primary Facility | 2008-09-03 | Routine/Complete Inspection | Violation(s) Noted | |
1748734 | Primary Facility | 2008-11-04 | Routine/Complete Inspection | No Violations Noted | |
1755643 | Primary Facility | 2008-12-10 | Routine/Complete Inspection | No Violations Noted | |
1770596 | Primary Facility | 2009-02-18 | Drilling/Alteration | No Violations Noted | |
1833748 | Primary Facility | 2009-08-06 | Routine/Complete Inspection | No Violations Noted | |
1845082 | Primary Facility | 2009-11-10 | Follow-up Inspection | No Violations Noted | I inspected the well head for evidence of leakage. There was no standing water present in the cellar and no visible bubbling observed. The well is currently on-line. |
1869130 | Primary Facility | 2010-03-09 | Routine/Complete Inspection | No Violations Noted | |
1876643 | Primary Facility | 2010-04-13 | Follow-up Inspection | Violation(s) Noted | I inspected the well head for evidence of leakage. No standing water was present in the cellar and no visible bubbling observed. The area around the base of the well has been filled to grade with P-gravel. The well is online. Gas readings were collected around the well head using a Model 60 gas meter. No readings were detected. There was no activity on site. The site has not been restored. My inspection revealed you failed to properly maintain the liner, and have failed to maintain at least 2 feet of freeboard in the reserve pit. This is a violation of Section 78.56(a) (2) of the Department¿s regulations, 25 PA Code 78.56(a) (2). |
1891115 | Primary Facility | 2010-06-09 | Routine/Complete Inspection | No Violations Noted | |
1917685 | Primary Facility | 2010-10-04 | Routine/Complete Inspection | No Violations Noted | Inspected well for evidence of gas seepage around well head. Due to work being done on Ratxel 2H, the area around the well is covered with plastic as secondary containment. The area around the well could not be inspected. Will have to inspect well at a later date. Well is online. |
1973812 | Primary Facility | 2011-05-13 | Routine/Complete Inspection | Violation(s) Noted | Adequate company response submitted 11/16/2011. |
2258385 | Primary Facility | 2014-03-25 | Follow-up Inspection | No Violations Noted | Nipple/Valve replaced. Bubbling in cellar ceased. |
2295290 | Primary Facility | 2014-07-16 | Complaint Inspection | No Violations Noted | |
2295353 | Primary Facility | 2014-07-21 | Follow-up Inspection | No Violations Noted | |
2295366 | Primary Facility | 2014-07-23 | Follow-up Inspection | No Violations Noted | |
2528778 | Primary Facility | 2016-10-12 | Site Restoration | No Violations Noted | Inspection of the Ratzel P1 Well Pad in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit.
The site has been stabilized and vegetation was found to be greater than 70% uniform perennial growth. Temporary E&S BMPs have been removed from the site. No E&S problems were observed at the time of the inspection. Post Construction Stormwater Management BMPs appear to be installed properly according to the site restoration plans. The well pad is less than or equal to the size indicated on the site restoration plans. Based on the site inspection, I recommend this notice of termination be APPROVED. |
2791956 | Primary Facility | 2018-10-19 | Routine/Complete Inspection | No Violations Noted | Arrived on location at 09:00. Weather: Clear ~ 35 degs. with slight breeze. Onsite to initiate 72 hr. pressure build up test "PBUT" on the annuli of the Ratzel 1H, 2H & 3V wells. Vac Truck had emptied well cellars to verify annuli vent connections. All wells (9 5/8"x 7") & (7"x 4 1/2") annuli have been isolated and were venting to onsite poly vent tanks. All wells (20"x 13 3/8") & (13 3/8"x 9 5/8") cemented annuli had open top casings in cellar. The 2H & 3V wells open casings tops were beneath the cement floor of cellars. (See individual well insp. pictures for cellar details).
- Upon arrival, I met with Cabot O&G Rep. Jeremy Rapp. Prior to shutting in wells annuli, initial gas screenings and flow checks were performed at the wells annuli using the Depts. Altair 5X gas meter, calibrated yesterday, and Cabots' RS-484 Alicat "Whisper" flow meter. Pre-shut in screenings showed gas and flow detected at the following annui: - 2H: (7"x 4 1/2") = 100% CH4, 575 cf/d - 3V: (7"x 4 1/2") = 100% CH4, 18.5 cf/d All well |
2795876 | Primary Facility | 2018-10-22 | Routine/Complete Inspection | No Violations Noted | Arrived on location at: 08:45. Weather: Overcast ~ 38 degs. Onsite to conclude the 72-hr. pressure build up test ¿PBUT¿ being performed on the Ratzel 1H, 2H & 3V wells annuli.
- Upon arrival I met with Cabot O&G Reps. Jeremy Rapp and Selman and Associates Reps. Kaydee Oliver and Tyler Thomas. There was also a GDS Vac Truck and Operator onsite to add or remove water to cellar areas as needed. The ending PBUT pressures were checked by Cabot Rep. using a digital Crystal pressure gauge.Ending pressures are listed below: - 1H: (7"x 4 1/2") = 0.0 psi., No gas detected.; (9 5/8"x 7") = -2.2 psi., No gas detected. Cellar was full of water, no bubbling was noted. - 2H: (7"x 4 1/2") = 170.1 psi., Gas sample taken = 100% CH4; (9 5/8"x 7") = -3.1 psi., No gas detected. Cellar was full of water. No bubbling was noted. - 3V: (7"x 4 1/2") = 61.0 psi.*, Gas sample taken = 100% CH4; (9 5/8"x 7") = 24.2 psi.*, Gas sample taken = 100% CH4. Cellar was full of water, no bubbling noted. All shut-in annuli were opened back up, ven |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1738462 | 548358 | 09/03/2008 | 2008-09-03 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
1738462 | 548359 | 09/03/2008 | 2008-09-03 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | 102.22 |
1876643 | 585084 | 04/13/2010 | 2010-04-13 | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | Administrative | |
1973812 | 611323 | 05/13/2011 | 2011-05-13 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | Adequate company response submitted 11/16/2011. |
1973812 | 611324 | 05/13/2011 | 2011-05-13 | 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102. | Administrative | Adequate company response submitted 11/16/2011. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
548358 | 239250 | NOV - Notice of Violation | Comply/Closed | 2008-11-04 | |||
548359 | 239250 | NOV - Notice of Violation | Comply/Closed | 2008-11-04 |
For data sources see[8]