If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20041 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.724239,"lon":-75.871352,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Dimock Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148289 | |
Farm/Lease Name: ELY 6H | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2008-04-16 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.724239 | |
Longitude: -75.871352 |
Date | Event |
---|---|
2008-04-16 | New Permit Application |
2008-04-18 | Performed Spud Operation |
2008-08-11 | Drilling Completion |
2008-10-01 | Perforation |
2008-10-01 | Performed Stimulation |
2009-02-27 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2008-10-01 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | CABOT OIL & GAS CORP | 46678.00 | 67 | 0.00 | 0 | 0.00 | 0 |
2009 | CABOT OIL & GAS CORP | 1224063.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | CABOT OIL & GAS CORP | 575,016.50 | 358 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 180,645.89 | 268 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 180,248.72 | 360 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 165,673.09 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 193,356.24 | 358 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 218,304.34 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 140,683.80 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 147,130.60 | 362 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 110,275.00 | 310 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 120,156.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | Brine | 1,144.00 Bbl | Municipal Sewage Treatment Plant | PA0026034 |
2009 | CABOT OIL & GAS CORP | Drilling | 2,154.00 Bbl | Municipal Sewage Treatment Plant | PA0026034 |
2010 | CABOT OIL & GAS CORP | Basic Sediment | 2.22 Bbl | LANDFILL | 101534 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 52.90 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101247 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 174.70 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CABOT OIL & GAS CORP | Produced Fluid | 111.98 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 15.00 Tons | LANDFILL | NY # 50S08 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 86.10 Tons | LANDFILL | NY # 02S17 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 105.20 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 1.10 Tons | LANDFILL | 100955 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 86.10 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 8-4630-00010/00 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 0.11 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 185.97 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 323.08 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 26.92 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 21.51 Tons | LANDFILL | 100945 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 0.47 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 40.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 23.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 27.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 70.07 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 3.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 51.46 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 89.53 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 129.76 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Servicing Fluid | 200.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 2.88 Tons | LANDFILL | 101247 |
2018 | CABOT OIL & GAS CORP | Servicing Fluid | 14.07 Tons | LANDFILL | 100933 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 62.91 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1703774 | Primary Facility | 2008-04-23 | Drilling/Alteration | Violation(s) Noted | |
1703801 | Primary Facility | 2008-04-29 | Drilling/Alteration | Outstanding Violations - No Viols Req'd | |
1705371 | Primary Facility | 2008-05-06 | Drilling/Alteration | Outstanding Violations - No Viols Req'd | |
1713946 | Primary Facility | 2008-06-03 | Routine/Complete Inspection | Violation(s) Noted | |
1716898 | Primary Facility | 2008-06-26 | Routine/Complete Inspection | No Violations Noted | |
1723010 | Primary Facility | 2008-07-24 | Drilling/Alteration | No Violations Noted | |
1733021 | Primary Facility | 2008-08-06 | Drilling/Alteration | No Violations Noted | |
1738430 | Primary Facility | 2008-09-03 | Routine/Complete Inspection | Violation(s) Noted | |
1741058 | Primary Facility | 2008-09-16 | Drilling/Alteration | Outstanding Violations - No Viols Req'd | |
1748732 | Primary Facility | 2008-11-04 | Routine/Complete Inspection | No Violations Noted | |
1752410 | Primary Facility | 2008-11-20 | Routine/Complete Inspection | No Violations Noted | |
1753553 | Primary Facility | 2008-11-24 | Routine/Complete Inspection | No Violations Noted | |
1755668 | Primary Facility | 2009-01-06 | Routine/Complete Inspection | No Violations Noted | |
1764300 | Primary Facility | 2009-01-20 | Routine/Complete Inspection | No Violations Noted | |
1764301 | Primary Facility | 2009-01-21 | Routine/Complete Inspection | No Violations Noted | |
1774900 | Primary Facility | 2009-02-18 | Administrative/File Review | Violation(s) Noted | |
1799657 | Primary Facility | 2008-12-09 | Routine/Complete Inspection | No Violations Noted | |
1833459 | Primary Facility | 2009-09-25 | Follow-up Inspection | No Violations Noted | An existing road was used to access the well site. The road and drill pad are stoned with limestone. The Site ID sign and E/S Plan were present at the entrance of the access road. |
1845081 | Primary Facility | 2009-11-10 | Follow-up Inspection | No Violations Noted | I inspected the well head for evidence of leakage. There was no standing water present and no visible bubbling observed. The base of the well was filled in with P-gravel to ground level. |
1956795 | Primary Facility | 2011-02-18 | Drilling/Alteration | No Violations Noted | Met with Co. man on site. Stone Service Rig. Squeeze cement in 7 x 8-3/4" annulus. 46 - 1725'. Killed well and then pulled 2 3/8" tubing. Set a RBP in 4 1/2" prod. string at 5000'. Dumped in 50' of sand on top of plug and filled hole with freshwater. Truied to freepoint 4 1/2" but could not move the A section. Have service company coming to get A section free. Perforated 7" casing 4 shots/ft (8 total shots) then will do another squeeze at top of zone 9460'). cementing with Class ! with gas block/latex from 460-1725'. |
1960381 | Primary Facility | 2011-03-16 | Drilling/Alteration | No Violations Noted | Stone Service Rig on site. Running 4 1/2" casing back in hole. Set patch in 4 1/2" at 2530'. Weill be testing shortly to 3000 lbs. If test ok, then will run tubing and install well head. Completed three individual perforation/squeeze jobs. Each one did not show any injectivity. Secondary containment in place. |
1973731 | Primary Facility | 2011-05-13 | Site Restoration | No Violations Noted | |
2124146 | Primary Facility | 2012-12-12 | Complaint Inspection | No Violations Noted | Please refer to the Ely 4H 12-12-12 inspection report for details. Permit number is 115-20034. |
2436220 | Primary Facility | 2015-12-22 | Site Restoration | No Violations Noted | Inspection of the Ely K P3 Well Pad in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit. |
2490163 | Primary Facility | 2016-06-01 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 12:20 p.m., the cellar was full of gravel with no gas detected at the perimeter of the cellar, the (9x7) vent pipe was open and venting to a tank, the (7x4) vent pipe was open and venting to a tank, there was 559psi on the production casing. I took a walk around the location and everything looked OK.
I left the site at 1:15 p.m. |
2629142 | Primary Facility | 2017-08-22 | Routine/Complete Inspection | No Violations Noted | Arrived at location at: 09:00. There are (2) wells currently on this pad, the Ely, K 4V and 6H wells. Upon arrival I spoke with Cabot O&G Rep., Brian Pert, a Meter Tech Trainee. Brian informed that He and other Meter Techs. were in the process of retrofitting all the existing producing wells on all (3) of the Ely, K Pads (1, 2 & 3) with updated metering and Pad layouts. This work should be completed on all (3) Pads in next few weeks.
Upon inspection of the Ely 4V and 6 H wells, both wells were set-up for automated production. Neither wells were producing at time of inspection. Both wells annuli, the (9 5/8"x 7") & (7"x 4 1/2") were open and venting to a small, shared vent tank via a common vent pipe. A gas check performed at the open top of vent tank showing 4% methane detected. A follow-up inspection will be arranged with Cabot to separate vent lines and perform individual annuli gas checks to confirm source of venting gas. Both wells prod casing annuli were shut in and prod. Trees were lined up to pro |
2632362 | Primary Facility | 2017-08-29 | Routine/Complete Inspection | No Violations Noted | On location to perform gas checks at the Ely 4V and 6H wells annuli prior to starting a 48 Hr PBUT on these two wells. The 4V and 6H wells (9 5/8"x 7") and (7"x 4 1/2") have been separated and individually vented to onsite vent tanks. (2) Cabot Field techs and (2) Selman and Associates techs were onsite to initiate 48 hr. PBUT. At ~ 09:15 initial gas checks were performed. The Depts gas checks were performed using an Altair 5X gas meter calibrated on 8/17/17. The Depts initial gas checks showed:
- Ely 4V: (9x7)= 0% gas, Peak 10% LEL diminishing to 0% LEL; (7x4)= 100% gas, 100% LEL. - Ely 6H: (9x7)= 0% gas, Peak 20% LEL diminishing to 0% LEL; (7x4)= 0% gas, 0% LEL. Cabot Field techs shut both wells (9x7) and (7x4) annuli in at ~ 09:30. PBUT pressure will be recorded through test period via Total Flow Control Unit. Both wells will remain lined up for automated production throughout test period. We will return to conclude PBUT on 8/31/17 @ ~ 10:00. |
2726658 | Primary Facility | 2018-05-04 | Routine/Complete Inspection | No Violations Noted | Arrived on location at 09:30. Weather: Light rain, mild ~ 65 degs. Onsite to witness the start of 72 hr. PBUT to be performed on the Ely 6H well. Upon arrival, Both wells, the Ely 4H & 6H wells were in production. Both wells (9 5/8"x 7") & (7"x 4 1/2") annular vents were open and venting to separate poly vent tanks. Gas checks performed at both wells vent tanks showed:
- 4H: (9x7) = 0% LEL, 0% CH4; (7x4) = 4% LEL, 0% CH4 - 6H: (9x7) = 0% LEL, 0% CH4; (7x4) = 100% LEL, 100% CH4 Both wells Prod. Casing, Static and Differential pressure were being monitored by Cygnet monitoring system. Each wells pressures were collected off LED read outs by gas production units "GPU". Both wells pressures are listed below: (Prod. Casing Press. = "PCP"; Static Press. = "SP"; Differential Press. = "DP") - 4H: PCP = 484.4 psi.; SP = 491.3 psi.; DP = 69.8 psi. - 6H: PCP = 470.2 psi.; SP = 494.6 psi.; DP = 147.2 psi. Cabot O&G Reps. Jeremy Rapp and Steven Catalfamo arrived onsite at ~ 09:50. The 6Hs annuli vents were shut in at 10: |
2727173 | Primary Facility | 2018-05-07 | Routine/Complete Inspection | No Violations Noted | Arrived on location at 09:30. Weather: Overcast, mild ~ 55degs. Onsite to conclude the 72 hr. Pressure build-up test ¿PBUT¿ being performed on the Ely 6H well. This wells (9 5/8"x 7") & (7"x 4 1/2") were SI on 5/4/18 @ 10:00. Upon arrival, I met with Cabot O&G Reps., Jeremy Rapp and Steven Catalfamo; Selma & Assoc. Rep., Matt Went; D.E.P. Geologist, Eric Rooney; D.E.P. WQS Supervisor, Brianna Cunningham and WQS, Casey Baldwin.
- At 10:00 the ending pressures were checked with digital gauge and recorded. (9x7) = 0.0 psi.; (7x4) = 84.4 psi. Gas checks performed at each annuli showed: (9x7) = 0% LEL, 0% CH4; (7x4) = 100% LEL, 100% CH4. Gas samples were collected off the (7x4) annulus by the Dept. and Selma & Assoc. at ~ 10:00. Samples will be sent out for laboratory analysis. At conclusion of sampling, both these annuli were opened up to vent to separate poly vent tanks. - The presence of venting gas and pressure build-up detected in the 6H wells (7"x 4 1/2") annulus appears to be indicative of Defective Cement |
2754772 | Primary Facility | 2018-07-23 | Routine/Complete Inspection | No Violations Noted | Arrived on location at 10:15. Weather: Overcast, rain ~ 75 degs. Onsite to conclude the 72 hr. Pressure build-up test ¿PBUT¿ being performed on the Ely 6H wells (7"x 4 1/2") annulus. This PBUT is being performed to assess the recent remedial activities performed on this well from 6/26 - 7/15/18. (See attached WBD for details). The (7"x 4 1/2") annulus was SI on 7/20/18 @ 09:00. The (9 5/8"x 7") annulus was open and venting to onsite vent tank. Both wells on pad, the 6H & 4V were shut-in during this PBUT.
- Upon arrival, I met with Cabot O&G Rep., Jeremy Rapp and Selman & Assoc. Reps., Tyler Thomas and Kaydee Oliver. At 10:30 the ending pressure was checked with digital gauge and recorded. (7"x 4 1/2") = 60.5 psi. Gas checks performed at this annulus showed: 100% LEL, 100% CH4. Gas samples were collected off the (7"x 4 1/2") annulus by the Dept. and Selman & Assoc. at ~ 11:30. Following sampling, the (7x4) annulus was bled down and opened up to vent to poly vent tank at ~ 11:40. Pressure bled off annulus in |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1703774 | 538185 | 04/23/2008 | 2008-04-23 | 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling | Administrative | |
1703774 | 538186 | 04/23/2008 | 2008-04-23 | 102.4NOPLAN - No E&S plan developed, plan not on site | Administrative | |
1713946 | 541458 | 06/03/2008 | 2008-06-03 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | 601.201g |
1713946 | 541459 | 06/03/2008 | 2008-06-03 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | 102.22 & 102.4b2 |
1738430 | 548348 | 09/03/2008 | 2008-09-03 | 102.4INADPLN - E&S Plan not adequate | Administrative | |
1774900 | 557997 | 02/18/2009 | 2009-02-18 | 212WELLRCD - Failure to submit well record within 30 days of completion of drilling | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
538185 | 233810 | NOV - Notice of Violation | Comply/Closed | 2008-06-26 | |||
538186 | 233810 | NOV - Notice of Violation | Comply/Closed | 2008-06-26 | |||
541458 | 235101 | NOV - Notice of Violation | Comply/Closed | 2008-06-26 | |||
541459 | 235101 | NOV - Notice of Violation | Comply/Closed | 2008-06-26 | |||
548348 | 239244 | NOV - Notice of Violation | Comply/Closed | 2008-11-04 | |||
557997 | 244244 | NOV - Notice of Violation | Superseded | 2010-04-15 | |||
557997 | 252129 | COA - Consent Order and Agreement | Superseded | 2010-04-15 | $120,000.00 | $120,000.00 |
For data sources see[8]