37-115-20033

Well Details

Well ID: 37-115-20033
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Dimock Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 148407
Farm/Lease Name: GESFORD 2
License Status: ACTIVE
Spud Date:
Permit Date: 2008-03-12
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.738713
Longitude: -75.878913

For data sources see[1][2][3]

Well History

Date Event
2008-03-12 New Permit Application
2008-09-23 Performed Spud Operation
2008-10-14 Drilling Completion
2008-11-14 Perforation
2008-11-18 Performed Stimulation
2009-02-27 NEWLY DRILLED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2008-11-18 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 CABOT OIL & GAS CORP 16460.00 13 0.00 0 0.00 0
2009 CABOT OIL & GAS CORP 239128.00 365 0.00 0 0.00 0
2010 CABOT OIL & GAS CORP 107,459.50 323 0.00 0 0.00 0
2011 CABOT OIL & GAS CORP 44,126.00 365 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 36,796.84 362 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 41,384.00 362 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 44,233.49 293 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 26,176.74 365 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 42,573.67 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 34,852.29 362 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 35,449.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 2,097.00 143 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 CABOT OIL & GAS CORP Brine 1,667.00 Bbl Municipal Sewage Treatment Plant PA0026034
2009 CABOT OIL & GAS CORP Drilling 2,420.00 Bbl Municipal Sewage Treatment Plant PA0026034
2009 CABOT OIL & GAS CORP Drilling 610.00 Bbl Brine or Industrial Waste Treatment Plt PAR9000009
2010 CABOT OIL & GAS CORP Drill Cuttings 47.30 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 101247
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 156.10 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CABOT OIL & GAS CORP Produced Fluid 5.05 Bbl REUSE OTHER THAN ROAD SPREADING
2010 CABOT OIL & GAS CORP Basic Sediment 1.85 Bbl LANDFILL 101534
2010 CABOT OIL & GAS CORP Drill Cuttings 13.40 Tons LANDFILL NY # 50S08
2010 CABOT OIL & GAS CORP Drill Cuttings 76.90 Tons LANDFILL NY # 02S17
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 94.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 CABOT OIL & GAS CORP Drill Cuttings 1.00 Tons LANDFILL 100955
2010 CABOT OIL & GAS CORP Drill Cuttings 76.90 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 8-4630-00010/00
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 110.19 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Produced Fluid 1.68 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 0.23 Tons LANDFILL 101534
2011 CABOT OIL & GAS CORP Drill Cuttings 0.30 Tons LANDFILL 100081
2011 CABOT OIL & GAS CORP Basic Sediment 0.41 Bbl LANDFILL 100081
2013 CABOT OIL & GAS CORP Produced Fluid 35.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 51.24 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 63.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 17.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 3.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 5.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 5.68 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2018 CABOT OIL & GAS CORP Servicing Fluid 0.07 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 CABOT OIL & GAS CORP Produced Fluid 43.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Produced Fluid 46.92 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid 72.35 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 8.49 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Servicing Fluid 119.86 Tons LANDFILL 100933
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 1.53 Tons RESIDUAL WASTE TRANSFER FACILITY 101714
2019 CABOT OIL & GAS CORP Servicing Fluid 100.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1713932 Primary Facility 2008-06-03 Routine/Complete Inspection Violation(s) Noted
1716876 Primary Facility 2008-06-26 Routine/Complete Inspection No Violations Noted
1746800 Primary Facility 2008-10-07 Drilling/Alteration No Violations Noted
1761031 Primary Facility 2009-01-05 Routine/Complete Inspection No Violations Noted
1761491 Primary Facility 2009-01-08 Routine/Complete Inspection No Violations Noted
1764247 Primary Facility 2009-01-20 Routine/Complete Inspection No Violations Noted
1764254 Primary Facility 2009-01-21 Routine/Complete Inspection No Violations Noted
1774902 Primary Facility 2009-02-18 Administrative/File Review Violation(s) Noted
1799923 Primary Facility 2009-05-01 Routine/Complete Inspection No Violations Noted
1833406 Primary Facility 2009-09-25 Follow-up Inspection No Violations Noted An existing road was used to access the well site. The road and drill pad are stoned with limestone. The Site ID sign and E/S Plan were present at the entrance of the access road.
1869163 Primary Facility 2010-03-09 Routine/Complete Inspection No Violations Noted
1876543 Primary Facility 2010-04-13 Follow-up Inspection No Violations Noted I inspected the well head for evidence of leakage. No standing water was present in the cellar and no visible bubbling observed. The cellar has been removed and the area around the base of the well has been filled to grade with P-gravel. The vents on the 9-5/8" and 7" casings were open. The well is online. Based on visual observations, no leakage was detected. Gas readings were collected around the well head using a Model 60 gas meter. No readings were detected. There was no activity on site. The site has not been restored.
1890866 Primary Facility 2010-06-08 Routine/Complete Inspection No Violations Noted
1917653 Primary Facility 2010-10-04 Routine/Complete Inspection No Violations Noted inspected well head for evidence of gas seepage. Standing water around well head. No gas expressions observed at time of inspection. Well is online. Bobcat operator spreading gravel on site at time of inspection.
1959392 Primary Facility 2011-03-22 Routine/Complete Inspection No Violations Noted
2430026 Primary Facility 2015-12-04 Site Restoration No Violations Noted
2430027 Primary Facility 2015-12-04 Site Restoration No Violations Noted
2431684 Primary Facility 2015-12-04 Site Restoration No Violations Noted Verify square footage of Gesford K P2 well pad for the notice of termination of the Erosion and Sedimentation permit.
2481811 Primary Facility 2016-04-26 Routine/Partial Inspection No Violations Noted

The Department conducted a Routine Partial Inspection at the Gesford Pad 2 Well Site. The E&S Inspection Log indicated that Mike Brilla (TEC) completed a Post Rain Event Inspection on 12/15/15. At the time of the inspection, the site appeared to meet temporary stabilization requirements. It was noted that there was black material alongside the lines running to the production tanks. Also, there was what appeared to be recently disturbed pad surface adjacent to the production containment.

2548417 Primary Facility 2016-12-01 Routine/Complete Inspection No Violations Noted The Department was on site to conduct a Routine Complete inspection for the Gesford P2 well site (Erosion and sediment permit 58-09-802). The wells associated with this site are as follows:

2V 115-20033 7H 115-20163

The site was well vegetated with perennial grass, and there were no erosion or sedimentation issues with the site. This site is stable at this time, and there were no issues to report.

There were no violations


If there are any questions please feel free to contact me at (570) 346-5539

2771572 Primary Facility 2018-09-04 Routine/Complete Inspection Pending Arrived on location at 09:00. Onsite to initiate a 72 hr. pressure build up test "PBUT" on the annuli of the Gesford 2V and 7H wells. Both wells annuli have been isolated and were venting to onsite poly vent tanks.

- Upon arrival I met with Cabot O&G Rep. Jeremy Rapp. Prior to shutting in wells annuli, initial gas screenings and flow checks were performed using the Depts. Altair 5X gas meter, calibrated this morning, and Cabots' RS-484 Alicat "Whisper" flow meter. Pre-shut in screenings showed gas and flow detected at both wells cemented annuli. - 2V: (9 5/8"x 7") = 100% CH4; 69.8 cf/d * - 7H: (13 3/8"x 9 5/8") = 100% CH4; 435 cf/d * Both wells annuli were shut in to start 72 hr PBUT at approx. 09:15. We will meet back on location to conclude PBUT on Friday 9/7/18 and collect gas samples off annuli, where present, for isotopic analysis. Left location at 09:40. (Please see attached well bore diagrams for the Gesford 2V and 7H wells for further details.)

    • Please Disregard Insp ID# 2771566 previously submitt
2772765 Primary Facility 2018-09-07 Routine/Complete Inspection Pending Arrived on location at 09:00. Onsite to conclude the 72 hr. pressure build up test "PBUT" being performed on the annuli of the Gesford 2V and 7H wells. Upon arrival I met with Cabot O&G Rep. Jeremy Rapp. and Selman and Associates Rep. Kaydee Oliver. At approx. 09:15 the ending PBUT pressures were checked by Mr. Rapp using a Crystal digital pressure gauge. Ending pressures are listed below:

- 2V: (7"x 4 1/2") = -5.9 psi.; (9 5/8"x 7") = 94.7 psi.* - 7H: (9 5/8"x 4 1/2") = 0.0 psi.; (13 3/8"x 9 5/8") = 162.7 psi.*

(*) The presence of venting gas and pressure detected in the Gesford 2H and 7H cemented annuli appears to be indicative of Defective Cement and/or Defective Casing. Since this condition was simultaneously detected by the Dept. and Cabot O&G, no violation for 78a.86 will be issued at this time. Please respond to the Dept. within 30 days of receipt of this inspection with a plan how Cabot O&G plans to address this defective condition per 78a.86.

While checking ending PBUT pressures, continuous bubbli

2785741 Primary Facility 2018-09-24 Follow-up Inspection Pending Arrived on location at 09:00. Onsite to conclude this repeat / follow-up 72 hr. pressure build up test "PBUT" being performed on the annuli of the Gesford 2V and 7H wells. Since conclusion of the last PBUT on these wells, concluded on 9/7/18, Cabot has emptied well cellars, verified and tightened all annular vent line connections. On 9/21/18 Dept. Rep., Eric Rooney met with Cabot Reps. to perform initial gas checks and annular vent flows prior to starting PBUT. (See Erics notes of this insp. attached, Photo #2). Summary of detected results below:

- Gesford 7H: 4 ½¿ x 9 5/8¿ annulus = 100% LEL, 100% methane, flow = 422 cf/d, annulus was shut in at 0932 hours - Gesford 2V: 7¿ x 9 5/8¿ annulus = 100 LEL, 100% methane, flow = 71 cf/d, annulus was shut in at 0945 hours

                2V: 4 ½¿ x 7¿ annulus = 100% LEL, 3% methane peak dissipated to 0, flow = fluctuating between 0 cf/d ¿ 1.5 cf/d, annulus was shut in at 0950 hours.

- Upon arrival today, I met with Cabot O&G Rep. Jeremy Rapp. and Selman and Associ

2835007 Primary Facility 2019-02-04 Drilling/Alteration Pending Arrived on location at 08:30. Onsite to check on progress of remedial activities underway on the Gesford 2H well. Weather: Clear, mild ~ 40 degs. Upon arrival I met with WSS, James Restley. Workover "WO" Rig had moved onto location on Jan. 18th. Prod. tubing was pulled. GAPS and CBL logs were ran and interpreted. WO activities resumed on Jan. 30th. To date, 4 1/2" casing was cut and pulled at 1050'. 7".casing was perf'd at ~ 1030', no injection rate could be established.
 - Present plan moving forward is to mill top of 4 1/2" casing stub down to depth of 7" casing shoe at 1575'. Additional CBL will be ran to  gather further data to develop plan for next remedial efforts.
 - Cabot will continue to keep The Department informed as remedial work progresses.

The Gesford 7H well will remain shut in during remedial efforts. An additional PBUT to be ran on the 7H wells (13x9) annulus when conductor cap installation is completed.

Left location at 10:00.

2840310 Primary Facility 2019-02-11 Drilling/Alteration Pending Arrived on location at 08:30. Onsite to check on progress of remedial activities underway on the Gesford 2V. Weather: Clear, cold ~ 20 degs. Upon arrival I met with WSS, James Restley. Workover "WO" Rig had moved onto location on Jan. 18th. Prod. tubing was pulled. GAPS and CBL logs were ran and interpreted. WO activities resumed on Jan. 30th. 4 1/2" casing was cut and pulled at 1050'. 7" casing was perf'd at ~ 1030', no injection rate could be established. Cabot's plan moving forward is to mill ~ 600' of 4 1/2" casing to below the 9 5/8" casing shoe.
 - Presently, rig has milled ~ 22' of casing and is changing out mill. This  will be third mill used. Progress has been slow but good metal and cement returns have been seen.
 - Cabot will continue to keep The Department informed as remedial work progresses.
 - The Gesford 7H well will remain shut in during remedial efforts. Mr. Restley confirmed that a conductor cap had been welded atop the 13 3/8"x 9 5/8" annulus. A newly installed 1" pipe was visible a
2846544 Primary Facility 2019-02-20 Drilling/Alteration Pending Arrived on location at 09:00. Onsite to check on progress of remedial activities underway on the Gesford 2V. Weather: Clear, cold ~ 20 degs. Upon arrival I met with WSS, James Restley. Workover "WO" Rig had moved onto location on Jan. 18th. Prod. tubing was pulled. GAPS and CBL logs were ran and interpreted. WO activities resumed on Jan. 30th. 4 1/2" casing was cut and pulled at 1050'. 7" casing was perf'd at ~ 1030', no injection rate could be established. Cabot's plan moving forward is to mill out 4 1/2" casing and perform additional perf and squeeze at a lower depth, to be determined.
 - Presently, rig has milled ~ 100' of 4 1/2" to ~ 1148'. Rig has perf'd 7" casing at 1030', 1027' and most recently at ~ 1115'. No injection rate could be established. Last PT performed on 7" held 1500 psi for 14 hrs showing a gradual press drop to ~ 750 psi. Cabot has decided to spot cement plug accross perfs with calculated TOCP at ~ 800'. 1500 psi will be held on 7" overnight.
 - Cabot will continue to keep The Depart

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1713932 541445 06/03/2008 2008-06-03 102.4NOPLAN - No E&S plan developed, plan not on site Administrative
1774902 557998 02/18/2009 2009-02-18 212WELLRCD - Failure to submit well record within 30 days of completion of drilling Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
541445 235106 NOV - Notice of Violation Comply/Closed 2008-06-26
557998 244244 NOV - Notice of Violation Superseded 2010-04-15
557998 252129 COA - Consent Order and Agreement Superseded 2010-04-15 $120,000.00 $120,000.00

For data sources see[8]