If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.7234,"lon":-75.87833,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Dimock Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 146214 | |
Farm/Lease Name: LEWIS 2 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2008-03-07 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 41.7234 | |
Longitude: -75.878330 |
Date | Event |
---|---|
2008-03-07 | New Permit Application |
2008-05-28 | Performed Spud Operation |
2008-08-18 | Perforation |
2008-08-19 | Performed Stimulation |
2008-09-06 | Drilling Completion |
2009-02-27 | NEWLY DRILLED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2008-08-19 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | CABOT OIL & GAS CORP | 104549.00 | 104 | 0.00 | 0 | 0.00 | 0 |
2009 | CABOT OIL & GAS CORP | 172500.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | CABOT OIL & GAS CORP | 99,412.50 | 366 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 41,075.11 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 41,268.00 | 351 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 34,850.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 34,240.00 | 255 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 42,259.00 | 337 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 29,379.00 | 349 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 26,858.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 28,052.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 21,801.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2008 | CABOT OIL & GAS CORP | Brine | 242.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0026034 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 162.70 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CABOT OIL & GAS CORP | Produced Fluid | 37.04 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010 | CABOT OIL & GAS CORP | Basic Sediment | 1.85 Bbl | LANDFILL | 101534 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 97.90 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 49.30 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101247 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 13.90 Tons | LANDFILL | NY # 50S08 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 80.20 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 8-4630-00010/00 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 80.20 Tons | LANDFILL | NY # 02S17 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 1.00 Tons | LANDFILL | 100955 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 0.04 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 9.25 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 21.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 30.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 40.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 76.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1705352 | Primary Facility | 2008-05-06 | Routine/Complete Inspection | No Violations Noted | |
1713913 | Primary Facility | 2008-06-03 | Drilling/Alteration | Violation(s) Noted | |
1716885 | Primary Facility | 2008-06-26 | Routine/Complete Inspection | No Violations Noted | |
1731762 | Primary Facility | 2008-08-21 | Routine/Complete Inspection | No Violations Noted | |
1753516 | Primary Facility | 2008-10-31 | Routine/Complete Inspection | No Violations Noted | |
1764331 | Primary Facility | 2009-01-20 | Routine/Complete Inspection | No Violations Noted | |
1764334 | Primary Facility | 2009-01-21 | Routine/Complete Inspection | No Violations Noted | |
1774914 | Primary Facility | 2009-02-18 | Administrative/File Review | Violation(s) Noted | |
1833453 | Primary Facility | 2009-09-25 | Follow-up Inspection | No Violations Noted | An existing road was used to access the well site. The road and drill pad are stoned with limestone. The Site ID sign and E/S Plan were present at the entrance of the access road. |
1869155 | Primary Facility | 2010-03-09 | Routine/Complete Inspection | No Violations Noted | |
1884572 | Primary Facility | 2010-01-06 | Follow-up Inspection | Viol(s) Noted & Immediately Corrected | |
1967817 | Primary Facility | 2011-04-14 | Site Restoration | No Violations Noted | |
2050922 | Primary Facility | 2012-03-13 | Site Restoration | No Violations Noted | |
2065320 | Primary Facility | 2012-05-03 | Follow-up Inspection | No Violations Noted | Follow up on report of well "spewing". At time of inspection Cabot crew on site repairing production unit. According to Cabot, a gauge for dump mechanism inside production unit wore out due to sand flow. As a result water was dumping directly to holding tanks in a manner that created a loud hissing noise to be heard. No spills were reported or observed. |
2247507 | Primary Facility | 2014-02-20 | Complaint Inspection | Pending | I traveled to the Lewis 2 Well Site (115-20030) in response to a complaint of a commotion on the well site. Mr. Smales(well tender) explained the following: While Mr. Depue was plowing snow on 2/19/14 at 12:00 PM, he backed up and hit the Lewis 2 well head. At that time, gas began to leak from a threaded fitting with a valve causing gas to escape. Crews were working on site from 12PM-9PM. It was reported that no fluid was lost but just a hissing sound was heard escaping from the well. EPS was called in and they installed a choke manifold and vented gas to the production tank. It was reported that they put a hydraulic line on top of the well head to pump 55 bbl of “brine” transported from Comtech’s A&M Hibbard Water Treatment Facility on Rte. 29 into the Lewis 2 well to kill the well (reported as successful). Cabot reported that it took 4 hours to complete this. This was done because the valve was below the shut off on the well head.Diversified Security was on site last night. |
2248398 | Primary Facility | 2014-02-20 | Administrative/File Review | Violation(s) Noted | |
2398204 | Primary Facility | 2015-08-13 | Routine/Complete Inspection | No Violations Noted | |
2497393 | Primary Facility | 2016-06-28 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 12:45p.m., the cellar was full of gravel with no gas detected, the (7x4) vent pipe was open and venting to a tank, there was 604psi on the production casing and 515psi on the production tubing. I took a walk around the location and everything looked OK.
I left the site at 13:50p.m. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1713913 | 541442 | 06/03/2008 | 2008-06-03 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | 102.22 & 102.4b2 |
1774914 | 558005 | 02/18/2009 | 2009-02-18 | 212WELLRCD - Failure to submit well record within 30 days of completion of drilling | Administrative | |
1884572 | 587046 | 01/06/2010 | 2010-01-06 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | 78.56 Failure to contain a pollutional substance in a lined pit or tank |
2248398 | 689507 | 02/19/2014 | 2014-02-19 | 78.73A - Operator shall prevent gas and other fluids from lower formations from entering fresh groundwater. | Environmental Health & Safety | Failure to operate and construct the well to ensure the integrity of the well is maintained and health, safety, environment, and property are protected. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
541442 | 235092 | NOV - Notice of Violation | Comply/Closed | 2008-06-26 | |||
558005 | 244244 | NOV - Notice of Violation | Superseded | 2010-04-15 | |||
558005 | 252129 | COA - Consent Order and Agreement | Superseded | 2010-04-15 | $120,000.00 | $120,000.00 | |
689507 | 307934 | NOV - Notice of Violation | Administrative Close Out | 2014-03-14 |
For data sources see[8]