If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-113-20122 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.522339,"lon":-76.370442,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Sullivan | |
Municipality: Cherry Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 147987 | |
Farm/Lease Name: CONNELL SUL 2H | |
License Status: INACTIVE | |
Spud Date: 2011-10-28 | |
Permit Date: 2011-09-29 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.522339 | |
Longitude: -76.370442 |
Date | Event |
---|---|
2011-09-29 | New Permit Application |
2011-10-26 | Performed Spud Operation |
2011-12-05 | Drilling Completion |
2012-03-08 | DEVIATED |
2013-09-30 | Perforation |
2018-08-29 | Inactive Well Request Granted |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-10-05 | 2013-10-19 | 8,049 | 5,077,630 | 232,874 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 100 Mesh Sand | PUMPCO | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 1.2653 | 0 |
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 18.4913 | 0 | |
Northern White Sand | PUMPCO | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 11.9639 | 0 | |
SFR-470 | X CHEM | Friction Reducer | Petroleum Distillate Hydrotreated Light | 064742-47-8 | 35 | 0.00411 | 0 | |
Alcohol ethoxylate C-10/16 with 6.5 EO | 068002-97-1 | 5 | 0.00059 | 0 | ||||
Quaternary Ammonium Chloride (Ammonium Chloride) | 012125-02-9 | 15 | 0.00176 | 0 | ||||
Ethoxylated Alcohol | 068439-50-9 | 5 | 0.00059 | 0 | ||||
Alcohols ethoxylated C12-16 | 068551-12-2 | 5 | 0.00059 | 0 | ||||
SC30 | X CHEM | Scale Inhibitor | Sodium Polyacrylate | 009003-04-7 | 100 | 0.00892 | 0 | |
B84 | X CHEM | Anti-Bacterial Agent | Ethanol | 000064-17-5 | 4 | 0.00108 | 0 | |
Quaternary Ammonium Compound | 068424-85-1 | 6 | 0.00149 | 0 | ||||
Didecyl Dimethyl Ammonium Chloride | 007173-51-5 | 8 | 0.00217 | 0 | ||||
Glutaraldehyde (Pentanediol) | 000111-30-8 | 27 | 0.00731 | 0 | ||||
Plexbreak 145 | PUMPCO | Non-Emulsifier | Coconut oil, Diethanolamide | 068603-42-9 | 10 | 0.00006000 | 0 | |
Water | 007732-18-5 | 65 | 0.00041 | 0 | ||||
Diethanolamine | 000111-42-2 | 2 | 0.00001000 | 0 | ||||
Methanol (Methyl Alcohol) | 000067-56-1 | 15 | 0.00009000 | 0 | ||||
2-Butoxyethanol (Ethylene Glycol Monobutyl Ether) | 000111-76-2 | 15 | 0.00009000 | 0 | ||||
Acid HCL | PUMPCO | Acid | Water | 007732-18-5 | 85 | 0.3204 | 0 | |
Hydrochloric Acid | 007647-01-0 | 15 | 0.05654 | 0 | ||||
Ferriplex 40 | PUMPCO | Iron Control Agent | Trisodium Nitrilotriacetate | 005064-31-3 | 40 | 0.0009 | 0 | |
Water | 007732-18-5 | 60 | 0.00135 | 0 | ||||
Sodium Hydroxide | 001310-73-2 | 1 | 0.00002000 | 0 | ||||
Sodium Sulfate | 007757-82-6 | 2 | 0.00005000 | 0 | ||||
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 67.7665 | 0 | |
SFR-451 | X CHEM | Friction Reducer | Petroleum Distillate Hydrotreated Light | 064742-47-8 | 35 | 0.0297 | 0 | |
Ammonium Acetate | 000631-61-8 | 6 | 0.00509 | 0 | ||||
B84, SC30, SFR-451, SFR-470 | X CHEM | Anti-Bacterial Agent, Friction Reducer, Scale Inhibitor | Alcohols ethoxylated C12-16 | 068551-12-2 | 0 | 0.07823 | 0 | |
Sorbitol Tetraoleate | 061723-83-9 | 0 | 0.00946 | 0 | ||||
Polypropenamide | 910644-97-2 | 0 | 0.07823 | 0 | ||||
Sorbitan Monooleate | 001338-43-8 | 0 | 0.0877 | 0 | ||||
Ethoxylated Alcohol | 068439-50-9 | 0 | 0.07823 | 0 | ||||
Proprietary Surfactant | TRADE SECRET | 0 | 0.0877 | 0 | ||||
Ethoxylated Oleylamine | 026635-93-8 | 0 | 0.07823 | 0 | ||||
Polyacrylamide (Acrylamide, Ammonium Acrylate Copolymer) | 026100-47-0 | 0 | 0.00946 | 0 | ||||
Polyethylene Glycol Monooleate | 009004-96-0 | 0 | 0.00946 | 0 | ||||
Alcohol ethoxylate C-10/16 with 6.5 EO | 068002-97-1 | 0 | 0.07823 | 0 | ||||
Water | 007732-18-5 | 0 | 0.12918 | 0 | ||||
Alcohols, C12-C14-Secondary, Ethoxylated | 084133-50-6 | 0 | 0.00946 | 0 | ||||
Plexhib 256 | PUMPCO | Corrosion Inhibitor | Modified Thiourea Polymer | 068527-49-1 | 30 | 0.00017 | 0 | |
Ethoxylated Alcohols^ C14-15 | 068951-67-7 | 30 | 0.00017 | 0 | ||||
Methanol (Methyl Alcohol) | 000067-56-1 | 60 | 0.00034 | 0 | ||||
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.00006000 | 0 | ||||
Alkenes^ C>10 alpha- | 064743-02-8 | 5 | 0.00003000 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 560,939.00 | 49 | 0.00 | 0 | 0.00 | 0 |
2014 | CHESAPEAKE APPALACHIA LLC | 4,293,181.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 3,023,693.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 2,217,745.00 | 347 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 1,688,217.00 | 331 | 0.00 | 0 | 0.00 | 0 |
2018 | CHESAPEAKE APPALACHIA LLC | 1,901,503.00 | 341 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 1,913,464.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHESAPEAKE APPALACHIA LLC | Drilling Fluid Waste | 340.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 1,837.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 569.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC008 |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 9,498.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Fracturing Fluid Waste | 29.46 Tons | LANDFILL | THR029 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 1,542.45 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 554.65 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 641.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 267.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 110.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2001297 | Primary Facility | 2011-09-06 | Routine/Complete Inspection | Violation(s) Noted | Newly completed pad, inspected at the start of heavy rains |
2006521 | Primary Facility | 2011-09-28 | Follow-up Inspection | No Violations Noted | |
2028369 | Primary Facility | 2011-12-20 | Routine/Complete Inspection | No Violations Noted | |
2184618 | Primary Facility | 2013-07-17 | Routine/Complete Inspection | No Violations Noted | |
2379134 | Primary Facility | 2015-06-12 | Routine/Complete Inspection | No Violations Noted | Arrived on site at 12:45 and departed at 13:00. Weather conditions were sunny and ~85°F. No Chesapeake representatives were present during the inspection. |
2493714 | Primary Facility | 2016-06-16 | Routine/Complete Inspection | No Violations Noted | Overall vegetative cover was greater than 70% perennial vegetation. Temporary erosion and sediment control BMPs have been removed. No evidence of accelerated erosion or sedimentation was observed.
According to the Department's records, the Erosion and Sediment Control General Permit for the site expired on 07/29/2015, and no current well permits exist. A 2-year extension of time for site restoration was granted on 02/24/2016. As part of that approval, post-construction stormwater management (PCSM) features were to be installed by 05/24/2016, unless additional time is requested and approved by the Department. At the time of inspection, no PCSM features have been installed, and no staking or other preparations that would indicate imminent construction were observed. In order to remain in compliance with the 2-year extension of time and Title 58 Pa.C.S. § 3216 (2012 Oil and Gas Act), relating to site restoration, additional time to install the PCSM measures should be requested. No violations were noted duri |
2559328 | Primary Facility | 2017-01-31 | Routine/Complete Inspection | No Violations Noted | : Arrived @ 13:00. Weather cold, snow. There is one producing well on a 6 slot set-up.
Connell Sul 2H Water and ice in cellar, no bubbling. 13-3/8” x 9-5/8” shut to the dump line, gas check vent – no combustible gas detected Top gaugue: 818 psi (digital) Left @ 13:20. |
2560102 | Primary Facility | 2017-02-08 | Routine/Complete Inspection | No Violations Noted | Routine inspection to assess overall site conditions. No Chesapeake representatives were present.
Overall vegetative cover was greater than 70% perennial vegetation. Temporary erosion and sediment control BMPs have been removed. No evidence of accelerated erosion or sedimentation was observed. According to the Department's records, the Erosion and Sediment Control General Permit for the site expired on 07/29/2015, and no current well permits exist. A 2-year extension of time for site restoration was granted on 02/24/2016. As part of that approval, post-construction stormwater management (PCSM) features were to be installed by 05/24/2016, unless additional time is requested and approved by the Department. At the time of inspection, no PCSM features have been installed, and no staking or other preparations that would indicate imminent construction were observed. In order to remain in compliance with the 2-year extension of time and Title 58 Pa.C.S. § 3216 (2012 Oil and Gas Act), relating to site restoratio |
2583163 | Primary Facility | 2017-04-17 | Routine/Complete Inspection | No Violations Noted | One well in production phase. One each sand and water separator. No leaks detected from production equipment. Site stable. No violations noted. |
2680284 | Primary Facility | 2018-01-09 | Routine/Complete Inspection | No Violations Noted | Arrived at 1418. Weather: sunny with clouds. One producing well on site on a six slot set up.
Top gauge: 773.98 psi (digital) 5 1/2: 1165.1 psi 9 5/8 x 5 1/2: -2.95 psi 13 3/8 x 9 5/8: open to dump line, 2.16 psi. No violations were observed during this inspection. |
2766060 | Primary Facility | 2018-08-22 | Routine/Complete Inspection | No Violations Noted | One well staged for production phase. One each sand and water separator. No leaks detected from production equipment. No violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2001297 | 619685 | 09/06/2011 | 2011-09-06 | 102.22 - Failure to achieve permanent stabilization of earth disturbance activity. | Administrative | Slopes were not stabilized within 4 days of cessation of earth disturbance activites. Particularly western slope back of the pad. |
2001297 | 619689 | 09/06/2011 | 2011-09-06 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | Slopes were hydroseeded at the same time. Heavy rain washed out the slopes. |
2001297 | 619690 | 09/06/2011 | 2011-09-06 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | Slopes were hydroseeded at the same time. Heavy rain washed out the slopes. |
For data sources see[8]