If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-105-21834 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.71725,"lon":-77.899939,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Potter | |
Municipality: Summit Township | |
Operator Name: JKLM ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: SWEDEN VALLEY PAD B 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2013-09-10 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 41.717250 | |
Longitude: -77.899939 |
Date | Event |
---|---|
2013-09-10 | New Permit Application |
2014-09-03 | Permit Renewal Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2365515 | Primary Facility | 2015-04-23 | Routine/Partial Inspection | No Violations Noted | Preconstruction meeting prior to expansion of the pad. TLT |
2375249 | Primary Facility | 2015-06-02 | Preoperation Inspection | No Violations Noted | Preop inspection at Sweden Valley 102 pad. Pad has been expanded. Construction/stabilization work nearly complete. Perimeter controls installed and majority of disturbed areas stabilized. Anticipate spudding of 3HU well on 6/2/15. TLT |
2377493 | Primary Facility | 2015-06-09 | Routine/Complete Inspection | No Violations Noted | |
2386092 | Primary Facility | 2015-06-29 | Incident- Response to Accident or Event | No Violations Noted | Incident inspection to document release of an estimated 275 gallons of phosphonic acid. Release occurred when a tote of anti-corrosion agent was punctured. Release cleanup and mitigation was initiated shortly after the release was discovered. Violations cited against the Sweden Valley 102 3HU permit (105-21850). TLT |
2392189 | Primary Facility | 2015-07-13 | Incident- Response to Accident or Event | No Violations Noted | Purpose of the inspection was to document a 63 gal calcium chloride release reported 7/7/15, which had been cleaned up. While on site, evidence of a new release was observed along the east side of the pad. Observed multiple damp areas on pad surface immediately adjacent to the containment. Containment nearly full with high conductivity fluid. Two samples collected. Sample results confirm pollutional substance on pad surface. Violations cited against the 3HU permit (105-21850). TLT |
2442659 | Primary Facility | 2016-01-19 | Follow-up Inspection | No Violations Noted | Inspection to follow up on the 6/27/15 phosphonic acid spill and the 7/13/15 brine release. Areas where soil has been excavated in association with the spills were observed. The site was snow covered and ground was frozen. No new violations were cited. The spill violations remain outstanding against the 3HU well (105-21850) and will be resolved upon receipt and review of the Remedial Action Completion Reports. TLT |
2595695 | Primary Facility | 2017-05-15 | Routine/Complete Inspection | No Violations Noted |
For data sources see[5]