If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-035-21238 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.352389,"lon":-77.673597,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clinton | |
Municipality: Chapman Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148999 | |
Farm/Lease Name: PA TRACT UNIT B 2H | |
License Status: | |
Spud Date: 2011-08-23 | |
Permit Date: 2011-04-11 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.352389 | |
Longitude: -77.673597 |
Date | Event |
---|---|
2011-04-11 | New Permit Application |
2011-09-20 | Performed Spud Operation |
2011-10-08 | Drilling Completion |
2012-08-08 | Perforation |
2013-07-26 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-07-25 | 2012-07-25 | 7,982 | 3,434,280 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Acid - 7.5 HCl Acid | PPG Industries | Acid | Other -(non hazardous) | 92.50 | 0.52 | ||
Hydrochloric acid | 7647-01-0 | 7.50 | 0.04 | |||||
Whole Product | ||||||||
Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 11.39 | |||
Friction Reducer - MC MX-14-5 | Multi-Chem Group | Friction Reducer | Other -(non hazardous) | 70.00 | 0.04 | |||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | |||||
Whole Product | ||||||||
Water | Water | 7732-18-5 | 100.00 | 87.93 | ||||
Acid Corrosion Inhibitor - EcoAcid CI | Geosafe Chemicals | Corrosion Inhibitor | Whole Product | |||||
Diethylene glycol monobutyl ether | 112-34-5 | 50.00 | 0.00019000 | |||||
Other -(non hazardous) | 50.00 | 0.00019000 | ||||||
Biocide - MC 8650 | Multi-Chem Group | Biocide | Other -(non hazardous) | 40.00 | 0.00246000 | |||
Glutaraldehyde | 111-30-8 | 60.00 | 0.00369000 | |||||
Whole Product | ||||||||
Scale Inhibitor - MC-MX-588-2 | Multi-Chem Group | Scale Inhibitor | Whole Product | |||||
Other -(non hazardous) | 100.00 | 0.01 | ||||||
Biocide - MC 8520 | Multi-Chem Group | Biocide | 3,4,4-Trimethyloxazolidine | 75673-43-7 | 4.50 | 0.00063000 | ||
2-Amino-2-methylpropan-1-ol | 124-68-5 | 0.50 | 0.00007000 | |||||
4,4-Dimethyloxazolidine | 51200-87-4 | 95.00 | 0.01 | |||||
Whole Product |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 66,852.00 | 128 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 345,190.00 | 359 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 209,177.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 205,397.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 149,899.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 125,982.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 115,883.14 | 363 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 97,996.32 | 319 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | XTO ENERGY INC | Fracing Fluid Waste | 115.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2012 | XTO ENERGY INC | Fracing Fluid Waste | 240.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2012 | XTO ENERGY INC | Fracing Fluid Waste | 2,180.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | XTO ENERGY INC | Fracing Fluid Waste | 131.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2012 | XTO ENERGY INC | Fracing Fluid Waste | 845.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2013 | XTO ENERGY INC | Produced Fluid | 213.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 509.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 124.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2013 | XTO ENERGY INC | Produced Fluid | 21.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 165.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 901.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 600.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2013 | XTO ENERGY INC | Produced Fluid | 425.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | XTO ENERGY INC | Produced Fluid | 480.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2013 | XTO ENERGY INC | Produced Fluid | 1,986.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2013 | XTO ENERGY INC | Produced Fluid | 1,358.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2014 | XTO ENERGY INC | Produced Fluid | 210.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2014 | XTO ENERGY INC | Produced Fluid | 1,439.73 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | XTO ENERGY INC | Produced Fluid | 381.51 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | XTO ENERGY INC | Produced Fluid | 485.02 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 226.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 116.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Produced Fluid | 752.73 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 1,224.96 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 448.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 235.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 101.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 112.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2016 | XTO ENERGY INC | Produced Fluid | 228.86 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 337.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 886.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | XTO ENERGY INC | Produced Fluid | 236.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | XTO ENERGY INC | Produced Fluid | 230.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | XTO ENERGY INC | Produced Fluid | 229.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 326.43 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | XTO ENERGY INC | Produced Fluid | 112.41 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | XTO ENERGY INC | Produced Fluid | 92.64 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 102.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Waste Water Treatment Sludge | 3.12 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2019 | XTO ENERGY INC | Produced Fluid | 254.03 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 201.00 Bbl | REUSE (AT WELL PAD) | |
2019 | XTO ENERGY INC | Produced Fluid | 107.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2004349 | Primary Facility | 2011-09-21 | Drilling/Alteration | No Violations Noted | |
2058911 | Primary Facility | 2012-03-07 | Routine/Complete Inspection | No Violations Noted | |
2071584 | Primary Facility | 2012-05-29 | Routine/Complete Inspection | No Violations Noted | |
2072462 | Primary Facility | 2012-05-02 | Routine/Complete Inspection | No Violations Noted | |
2089713 | Primary Facility | 2012-08-06 | Routine/Partial Inspection | No Violations Noted | |
2093359 | Primary Facility | 2012-08-21 | Routine/Partial Inspection | No Violations Noted | |
2102770 | Primary Facility | 2012-09-26 | Routine/Partial Inspection | No Violations Noted | |
2106039 | Primary Facility | 2012-09-25 | Routine/Complete Inspection | No Violations Noted | |
2116453 | Primary Facility | 2012-11-07 | Routine/Complete Inspection | No Violations Noted | |
2175949 | Primary Facility | 2013-06-17 | Routine/Complete Inspection | No Violations Noted | |
2347899 | Primary Facility | 2015-02-26 | Routine/Complete Inspection | No Violations Noted | |
2423055 | Primary Facility | 2015-10-19 | Routine/Complete Inspection | Violation(s) Noted | Routine inspection of wells in production. Violation Noted. |
2516586 | Primary Facility | 2016-08-23 | Site Restoration | No Violations Noted | |
2555277 | Primary Facility | 2017-01-23 | Routine/Complete Inspection | No Violations Noted | Routine inspection of unconventional well in production. No violations noted at time of inspection. |
2654539 | Primary Facility | 2017-10-31 | Routine/Complete Inspection | No Violations Noted | Weather is 38 deg. F and cloudy. All 3 annulus vent had 0% combustible gas detected at the time of inspection. |
2809572 | Primary Facility | 2018-12-03 | Routine/Complete Inspection | No Violations Noted | On December 3, 2018, Department representative Brad Kline conducted a routine site inspection at XTO Energy PA Tract Unit B 2H Pad. No E&S issues were observed during the time of inspection. The site is stable and well vegetated meeting the 70% uniform, perennial, vegetative cover.
There are a total of 2 producing wells and 1 plugged well located on this well pad. All wells are tagged with API/well permit numbers. No bubbling within the cellars was observed. There are 2 GPU’s and 2 steel vertical production fluids tanks onsite. Both GPUs and production fluid tanks were stationed in secondary containment. No violations noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2423055 | 738669 | 10/19/2015 | 2015-10-19 | 78.86 - CASING AND CEMENTING - DEFECTIVE CASING OR CEMENTING - Operator failed to report defect in a well that has defective, insufficient or improperly cemented casing to the Department within 24 hours of discovery. Operator failed to correct defec | Environmental Health & Safety |
For data sources see[8]