37-015-23080

Well Details

Well ID: 37-015-23080
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Overton Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 151414
Farm/Lease Name: SGL-12 A UNIT
License Status: Inactive
Spud Date:
Permit Date: 2014-06-13
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.590994
Longitude: -76.675008

For data sources see[1][2][3]

Well History

Date Event
2014-06-13 New Permit Application
2015-01-02 Performed Spud Operation
2017-03-13 Inactive Well Request Granted

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 CHIEF OIL & GAS LLC Drill Cuttings 344.21 Tons LANDFILL 301358
2015 CHIEF OIL & GAS LLC Drilling Fluid Waste 1,210.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2296694 Primary Facility 2014-08-15 Routine/Complete Inspection No Violations Noted
2339388 Primary Facility 2015-01-28 Routine/Complete Inspection No Violations Noted
2345887 Primary Facility 2015-02-18 Routine/Complete Inspection No Violations Noted
2349088 Primary Facility 2015-02-18 Drilling/Alteration No Violations Noted
2362976 Primary Facility 2015-04-16 Drilling/Alteration No Violations Noted
2369588 Primary Facility 2015-05-08 Routine/Complete Inspection No Violations Noted
2371401 Primary Facility 2015-05-19 Routine/Complete Inspection No Violations Noted Arrived on site at 14:45 and departed at 13:45. Weather conditions were sunny and ~80°F. I spoke with Mr. Billy Swanson of Chief and was accompanied by a representative of Orion Well Drilling.
2377403 Primary Facility 2015-06-09 Routine/Complete Inspection No Violations Noted
2386905 Primary Facility 2015-07-06 Routine/Complete Inspection No Violations Noted Arrived @13:10 in the rain. Maintenance on the access road was ongoing at the time of my inspection. The Orion 15 rig was onsite. Met with Company Man Trey Villeneuve. At the 4H well, (015-23079) Orion 15 was preparing to drill out the floats previously set at 1928’ and drill deeper, with an estimated 3 to 4 days to KOP. After TD’ing the 4H, Orion 15 plans to TD the 6H.
2400801 Primary Facility 2015-08-20 Incident- Response to Accident or Event No Violations Noted
2446461 Primary Facility 2016-02-03 Routine/Complete Inspection No Violations Noted
2482987 Primary Facility 2016-05-11 Routine/Complete Inspection No Violations Noted
2492302 Primary Facility 2016-06-09 Routine/Complete Inspection No Violations Noted
2494713 Primary Facility 2016-06-21 Routine/Complete Inspection No Violations Noted
2502578 Primary Facility 2016-07-06 Routine/Complete Inspection No Violations Noted
2502738 Primary Facility 2016-06-28 Routine/Complete Inspection No Violations Noted
2511320 Primary Facility 2016-08-16 Routine/Complete Inspection No Violations Noted Arrived @ 13:00. Weather: hot, humid, rain off and on. This inspection was prompted by an Inactive Status Application for the SGL 12A 5H. At the time of my inspection, flow back operations had been completed. Oil States staff were onsite monitoring a sand separator and heating unit that were staged near the well head so that high initial pressure could be dropped back and sent to the production units on site. As a consequence, the SGL12A 5H well was still covered by containment, so it was not possible conduct an inspection. The status of the other wells on location was as follows:

SGL 12 A 1H – shut in SGL 12A 4H – in production SGL 12 A 2H in production SGL12A 5H – covered by containment SGL 12 A 3H in production SGL 12A 6H – in production. Left location at 14:00.

2531484 Primary Facility 2016-10-07 Routine/Complete Inspection No Violations Noted Arrived @ 9:00. Weather: cool, sunny. This inspection was prompted by an Inactive Status Application for the SGL 12A 5H. This inspection could not be completed at this time because Oil States staff were still using a heating unit on the 6H and the 5H was still covered by containment. The status of the other wells on location was as follows:

SGL 12 A 1H, shut-in,not producing. Gravel and water in cellar, no bubbling. 9-5/8” x 5-1/2”: 1200 psi (analog gauge) –queried this with Jon Hafer. SGL 12A 3H, in production, 5-1/2”: 1100 psi (0-5000) SGL 12A 4H, in production, 5-1/2” 900 psi SGL 12A 5H, covered by containment SGL 12A 6H, Top gauge: 2125 psi (0-5000, analog), 5-1/2” 2125 psi. There were no violations noted at the time of this inspection. Left location @ 11:15

2552275 Primary Facility 2017-01-13 Routine/Complete Inspection No Violations Noted Five wells in production stage. One will drilled but not in production. Four water separator's appear to be in use and within containment. Four production tanks within containment. No violations noted.

Note: See the 6H inspection for photos.

2559236 Primary Facility 2017-01-31 Routine/Complete Inspection No Violations Noted Arrived @ 10:00. Weather: cold, snowing. Met with Jon Hafer (Chief) to conduct inspections for Inactive Status Applications for the SGL 12A 5H and 1H. Observed Hafer as he monitored annular vents for combustible gas (Multirae meter calibrated 1/31/17).

SGL 12A 1H, drilled to total depth, gravel in cellar. 13-3/8” x 9-5/8”: 0.3% methane 9-5/8” x 5-1/2”: 100% methane SGL 12A 5H: to, top-holed to 1953’ 13-3/8” x 9-5/8”: no methane detected 9-5/8”: no methane detected. SGL 12A 2H, SGL 12 A 3H, SGL 12A 4H, SGL 12A 6H are in production. Left @ 11:30. No violations observed during this inspection. Approval of the Inactive Status Applications is recommended.

2747151 Primary Facility 2018-06-29 Routine/Complete Inspection No Violations Noted Fours wells staged for production phase. Four each water separators. Dump lines wrapped in insulating blanket. No leaks detected from production equipment. Above ground fresh water storage tanks in use on location. No violations noted.

For data sources see[7]