If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30759 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.642283,"lon":-79.592022,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Gilpin Township | |
Operator Name: US ENERGY EXPLORATION CORP | |
Well Pad ID: | |
Farm/Lease Name: GARY BELL 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-01-04 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.642283 | |
Longitude: -79.592022 |
Date | Event |
---|---|
2011-01-04 | New Permit Application |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | US ENERGY EXPLORATION CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1969026 | Primary Facility | 2011-04-28 | Routine/Complete Inspection | No Violations Noted | Well-site constructed, drilling had not commenced. E&S controls had been implemented as outlined in the E&S plan for the well-site. The access road culverts still required the rock be implemented at the culvert outlets. Operator should maintain all erosion control BMP's until well development activities are completed. |
2030352 | Primary Facility | 2011-12-30 | Routine/Complete Inspection | No Violations Noted | Well site had been regraded, well was still staked. Site required temporary stabilization in accordance with 102.22(b). There was no evidence of accelerated erosion or sedimentation in relation to the access road or well-site. |
For data sources see[6]