If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-23447 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.47,"lon":-81.57,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Auburn Township | |
Operator Name: RHDK OIL & GAS LLC/DBA RED HIL | |
Well Pad ID: | |
Farm/Lease Name: BAHLER EARL C | |
License Status: Producing | |
License Date: 1980-07-17 | |
Spud Date: 1979-12-15 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1980-01-09 | |
Well Total Depth: 7617.00 ft | |
Configuration: Vertical | |
Latitude: 40.470000 | |
Longitude: -81.570000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1979-12-15 | |
Completed | 1980-01-09 | |
Reached Total Depth | 1980-01-09 | |
CO | 1980-07-17 | 168 RED HILL DEVELOPMENT GeoDate 7/17/80 |
Oil and Gas | 1980-07-17 | Issued Date 7/17/80 Expired Date 7/17/81 Acres 0085540 Tool Type RTAF Proposed Formation TREMPEALEAU Proposed Depth 07588 Proposed Drill Depth 07588 |
Construction Permit Expires | 1981-07-17 | |
Completion Report Received | 1992-12-23 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4671 | 4773 | 0 |
4671 | 4773 | 0 | |
2006-09-11 | 4703 | 4752 | 5 |
4703 | 4752 | 5 | |
4671 | 4773 | 0 | |
2006-09-11 | 7195 | 7220 | 16 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 0 | 0 | SLICKWATER FRAC |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1529279042 | 2015-2-11 0:00: | PW | No Violations | 0.50 |
-238159571 | 2005-2-24 0:00: | PL | No Violations | |
0238159571 | 2005-02-24 | Preliminary Restoration | No Violations | restoration ok |
0621405532 | 2005-02-24 | Production Wells | No Violations | no violations dike ok |
0909614271 | 2018-04-20 | Production Wells | No Violations | Upon arrival on location, I witnessed the well was equipped 8.625 inch diameter casing, 4.5 inch diameter casing, 1.5 inch diameter tubing, and a plunger lift system. The valves were open on tubing and the valves were open on casing. Production equipment included a steel 100 barrel tank, horizonal separator, domestic gas and a chart recorder equipped a 2 inch by .750 inch orifice plate within an earthen dike. The proper identification was in place and production report was up to date. |
1460031000 | 2016-04-07 | Production Wells | No Violations | On the day of my inspection I found an 8 X 4 inch wellhead and a 4 x 2 wellhead operated by a plunger lift system. The tank battery is made up of a 100 bbl., and a horizontal separator, and a recording gauge all in an earthen dike. The tank is properly identified and production reporting is up to date. There are no violations at this time. |
1529279042 | 2015-02-11 | Production Wells | No Violations | On the day of my inspection I found a 4 x 2 wellhead operated by a plunger lift system. The tank battery is made up of a 100 bbl, and a horizontal separator, all in an earthen dike. The tank is properly identified and production reporting is up to date. There are no violations at this time. |
621405532 | 2005-2-24 0:00: | PW | No Violations | |
909614271 | 2018-4-20 0:00: | PW | No Violations | 0.50 |
For data sources see[9]