If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22958 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.26,"lon":-81.4,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR | |
Well Pad ID: | |
Farm/Lease Name: VAUGHAN | |
License Status: Producing | |
License Date: 2005-10-21 | |
Spud Date: 2006-07-24 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2006-07-28 | |
Well Total Depth: 4088.00 ft | |
Configuration: Vertical | |
Latitude: 41.260000 | |
Longitude: -81.400000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2005-10-21 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:10/21/2005, Expired Date:10/21/2006 6:00:00 AM, Drilling unit acres:23.23, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2006-07-24 | RBDMS Rec |
Completed | 2006-07-28 | RBDMS Rec |
Reached Total Depth | 2006-07-28 | RBDMS Rec |
Construction Permit Expires | 2006-10-21 | RBDMS Rec |
Completion Report Received | 2006-11-09 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2007-01-14 | 3817 | 3878 | 94 |
3817 | 3878 | 94 | |
3817 | 3878 | 94 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 2693 Bbl | 80000 | 1000 GALLONS IC ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | OHIO VALLEY ENERGY SYSTEMS COR | 40485.00 | 1914.00 | 278 |
2008 | OHIO VALLEY ENERGY SYSTEMS COR | 39210.00 | 1052.00 | 365 |
2009 | OHIO VALLEY ENERGY SYSTEMS COR | 42994.00 | 1163.00 | 365 |
2010 | OHIO VALLEY ENERGY SYSTEMS COR | 37148.00 | 712.00 | 365 |
2011 | OHIO VALLEY ENERGY SYSTEMS COR | 20448.00 | 611.00 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | 15181.00 | 450.00 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | 28498.00 | 947.00 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | 47724.00 | 923.00 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | 35322.00 | 562.00 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | 24311.00 | 499.00 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | 20730.00 | 491.00 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | 19379.00 | 487.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 91 | 278 |
2008 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 60 | 365 |
2009 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 165 | 365 |
2010 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 22 | 365 |
2011 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 400 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 196 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 153 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 51 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 40 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 56 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1207521324 | 2006-7-28 0:00: | DD | No Violations | |
-1618873286 | 2006-8-3 0:00:0 | DD | No Violations | |
-2044347192 | 2006-8-14 0:00: | DD | No Violations | |
-2095748997 | 2006-7-18 0:00: | DD | No Violations | |
-827556023 | 2006-7-26 0:00: | DD | No Violations | |
0827556023 | 2006-07-26 | Drill / Deepen / Reopen | No Violations | Wildcat is drilling ahead. The pits are lined and in good condition. No violations at this time. |
1146350518 | 2007-05-17 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
1155600879 | 2006-08-07 | Drill / Deepen / Reopen | No Violations | Daleys Excavating was on site to start solidifying the drilling pits. The cement dust used in the blow pit was a little slow to react and I asked Daleys to wait until morning before closing over the pit. The other issue that needs to be addressed at this site is an artesian flow around the outside of the conductor casing. This issue will be addressed when the site has been graded for drainage. |
1207521324 | 2006-07-28 | Drill / Deepen / Reopen | No Violations | The rig encountered gas and water in the Newburg and switched over from air to fluid drilling. |
1280124341 | 2006-08-08 | Drill / Deepen / Reopen | No Violations | The blow pit cement dust did solidify overnight and the pit was covered over. |
1291103996 | 2006-09-05 | Preliminary Restoration | No Violations | Daleys Excavating has placed a piece of 1-1/2 tubing in a trench leading from the wellhead to the nearby creek. The purpose of the tubing is to drain both surface and spring water away from the wellhead. The water passes through two small siphon dams before it is discharged into the creek. The tubing is a temporary fix. The final management plan calls for 4 drain tile to discharge into a drywell and then to the creek. |
1399948110 | 2006-08-02 | Drill / Deepen / Reopen | No Violations | The drilling pits are full and are being pumped into a 500 bbl frac tank located on site. A Quantab analysis of water on the drilling location indicates no brine impact. There is a problem with artesian flow outside of the conductor casing. This issue will be addressed during pit solidification. No violations at this time. |
1618873286 | 2006-08-03 | Drill / Deepen / Reopen | No Violations | Pits are in good condition. No violations at this time. |
1812311150 | 2006-07-24 | Drill / Deepen / Reopen | No Violations | Wildcat is drilling ahead. The pits are fenced off, lined and in good condition. No violations at this time. |
2044347192 | 2006-08-14 | Drill / Deepen / Reopen | No Violations | Per my conversation with Dale Nething, the artesian flow around the outside of the conductor casing will be corrected by placing drain tile around the wellhead and directing the flow to a nearby creek. |
2095748997 | 2006-07-18 | Drill / Deepen / Reopen | No Violations | Daley Excavating was on site to start building the drilling location and entry. No violations at this time. |
For data sources see[9]