X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-23332

Well Details

Well ID: 34-133-23332
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Edinburg Township
Operator Name: EVERFLOW EASTERN PARTNERS LP
Well Pad ID:
Farm/Lease Name: HERCSEK & HARASYN
License Status: Producing
License Date: 1984-11-29
Spud Date: 1984-12-08
Spud Drilling Contractor: CUBBY DRLG
Final Drill Date: 1984-12-11
Well Total Depth: 4874.00 ft
Configuration: Vertical
Latitude: 41.070000
Longitude: -81.120000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1984-11-29 Issued Date 11/29/84 Expired Date 5/28/85 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 04874 Proposed Drill Depth 04874
Original Spud 1984-12-08
Completed 1984-12-11
Reached Total Depth 1984-12-11
CO 1984-12-19 84 EVERFLOW EASTERN PTNS L P GeoDate 11/29/84
Completion Report Received 1984-12-31
Construction Permit Expires 1985-05-28
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4628 4762 0
4628 4762 0
2006-09-11 4657 4710 2
4657 4710 2
4628 4762 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
0 0 0 FRAC: H2O,SAND,N2

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 EVERFLOW EASTERN PARTNERS LP 21896.00 4747.00 292
1986 EVERFLOW EASTERN PARTNERS LP 9013.00 2503.00 365
1987 EVERFLOW EASTERN PARTNERS LP 7729.00 2172.00 365
1988 EVERFLOW EASTERN PARTNERS LP 10224.00 2113.00 365
1989 EVERFLOW EASTERN PARTNERS LP 6892.00 1351.00 365
1990 EVERFLOW EASTERN PARTNERS LP 6143.00 1163.00 365
1991 EVERFLOW EASTERN PARTNERS LP 5560.00 969.00 365
1992 EVERFLOW EASTERN PARTNERS LP 4425.00 583.00 365
1993 EVERFLOW EASTERN PARTNERS LP 4470.00 880.00 365
1994 EVERFLOW EASTERN PARTNERS LP 3970.00 794.00 365
1995 EVERFLOW EASTERN PARTNERS LP 4632.00 660.00 365
1996 EVERFLOW EASTERN PARTNERS LP 3812.00 561.00 365
1997 EVERFLOW EASTERN PARTNERS LP 2233.00 252.00 365
1998 EVERFLOW EASTERN PARTNERS LP 3211.00 489.00 365
1999 EVERFLOW EASTERN PARTNERS LP 3210.00 546.00 365
2000 EVERFLOW EASTERN PARTNERS LP 3171.00 519.00 365
2001 EVERFLOW EASTERN PARTNERS LP 3830.00 640.00 365
2002 EVERFLOW EASTERN PARTNERS LP 4115.00 508.00 365
2003 EVERFLOW EASTERN PARTNERS LP 3723.00 447.00 365
2004 EVERFLOW EASTERN PARTNERS LP 3417.00 374.00 365
2005 EVERFLOW EASTERN PARTNERS LP 3361.00 386.00 365
2006 EVERFLOW EASTERN PARTNERS LP 3000.00 364.00 365
2007 EVERFLOW EASTERN PARTNERS LP 3282.00 308.00 365
2008 EVERFLOW EASTERN PARTNERS LP 2943.00 319.00 365
2009 EVERFLOW EASTERN PARTNERS LP 3171.00 272.00 365
2010 EVERFLOW EASTERN PARTNERS LP 2345.00 266.00 365
2011 EVERFLOW EASTERN PARTNERS LP 2214.00 242.00 365
2012 EVERFLOW EASTERN PARTNERS LP 2461.00 168.00 366
2013 EVERFLOW EASTERN PARTNERS LP 2354.00 189.00 365
2014 EVERFLOW EASTERN PARTNERS LP 1623.00 263.00 365
2015 EVERFLOW EASTERN PARTNERS LP 1980.00 225.00 365
2016 EVERFLOW EASTERN PARTNERS LP 1620.00 144.00 365
2017 EVERFLOW EASTERN PARTNERS LP 1751.00 249.00 365
2018 EVERFLOW EASTERN PARTNERS LP 1783.00 226.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 EVERFLOW EASTERN PARTNERS LP Brine 815 292
1986 EVERFLOW EASTERN PARTNERS LP Brine 255 365
1987 EVERFLOW EASTERN PARTNERS LP Brine 198 365
1988 EVERFLOW EASTERN PARTNERS LP Brine 190 365
1989 EVERFLOW EASTERN PARTNERS LP Brine 315 365
1990 EVERFLOW EASTERN PARTNERS LP Brine 155 365
1991 EVERFLOW EASTERN PARTNERS LP Brine 180 365
1992 EVERFLOW EASTERN PARTNERS LP Brine 138 365
1993 EVERFLOW EASTERN PARTNERS LP Brine 140 365
1994 EVERFLOW EASTERN PARTNERS LP Brine 277 365
1995 EVERFLOW EASTERN PARTNERS LP Brine 480 365
1996 EVERFLOW EASTERN PARTNERS LP Brine 617 365
1997 EVERFLOW EASTERN PARTNERS LP Brine 583 365
1998 EVERFLOW EASTERN PARTNERS LP Brine 105 365
1999 EVERFLOW EASTERN PARTNERS LP Brine 182 365
2000 EVERFLOW EASTERN PARTNERS LP Brine 134 365
2001 EVERFLOW EASTERN PARTNERS LP Brine 141 365
2002 EVERFLOW EASTERN PARTNERS LP Brine 76 365
2003 EVERFLOW EASTERN PARTNERS LP Brine 79 365
2004 EVERFLOW EASTERN PARTNERS LP Brine 80 365
2005 EVERFLOW EASTERN PARTNERS LP Brine 76 365
2006 EVERFLOW EASTERN PARTNERS LP Brine 83 365
2007 EVERFLOW EASTERN PARTNERS LP Brine 44 365
2008 EVERFLOW EASTERN PARTNERS LP Brine 53 365
2009 EVERFLOW EASTERN PARTNERS LP Brine 32 365
2010 EVERFLOW EASTERN PARTNERS LP Brine 27 365
2011 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2012 EVERFLOW EASTERN PARTNERS LP Brine 0 366
2013 EVERFLOW EASTERN PARTNERS LP Brine 31 365
2014 EVERFLOW EASTERN PARTNERS LP Brine 43 365
2015 EVERFLOW EASTERN PARTNERS LP Brine 28 365
2016 EVERFLOW EASTERN PARTNERS LP Brine 4 365
2017 EVERFLOW EASTERN PARTNERS LP Brine 34 365
2018 EVERFLOW EASTERN PARTNERS LP Brine 48 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-294743648 2018-5-10 0:00: PW No Violations 0.90
0000PL6030 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0294743648 2018-05-10 Production Wells No Violations Status check inspection of this Clinton Sandstone well. My inspection found the wellhead fenced, equipped with tubing and rods, and operating with the aid of an electric powered pumping unit. The valves on the tubing and the 4.5 production casing are open and there is a domestic tap plumbed to the 4.5 casing port. This well produces to a fenced, locked, and diked tank battery to the south and is shared with the Hercsek #2 (PN# 23333). The battery contains two (2) 100 barrel tanks, two (2) horizontal separators, and a shared 50 barrel poly tank. The chart indicates a differential production pressure of 45psi and the required ID is posted at the wellhead and at the tank battery. No violations.
PL6030 PL No Violations

For data sources see[9]

References