Well Details

Well ID: 34-111-24795
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Green Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001512
Farm/Lease Name: YELLOW ROSE C
License Status: Producing
License Date: 2017-11-29
Spud Date: 2018-02-27
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2018-02-25
Well Total Depth: 22250.00 ft
Configuration: Horizontal
Latitude: 39.740000
Longitude: -80.980000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-10-20 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:10/20/2017, Expired Date:10/20/2019 12:00:00 PM, Drilling unit acres:, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-11-29 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/29/2017, Expired Date:11/29/2019 12:00:00 PM, Drilling unit acres:420.089, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-02-25
Correction to Well 2018-03-09 CHANGE TO UNIT SIZE, TAKE-POINT AND TARGET INFORMATION.
Correction to Well 2018-03-30 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2018-10-31
Record Last Modified 2018-11-02
Construction Permit Expires 2019-11-29

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-11-01 10542 10692 0
2018-11-01 21943 22040 0
21943 22040 0
10542 10692 0
10542 10692 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/10/2018 08/01/2018 10357 22,865,200.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 OILPERM A Halliburton Non-ionic Surfactant Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.516577 1,123,010.0
Fresh Water Operator Base Fluid Water 7732-18-5 100 87.5193 190,262,000.0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
HP-2220 OneAqua Scale Inhibitor Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
MB-7530 OneAqua Biocide Listed Below Listed Below 0 0 0
HP-2816 OneAqua Friction Reducer Listed Below Listed Below 0 0 0
HP-2814 OneAqua Friction Reducer Listed Below Listed Below 0 0 0
PROP-CERAMIC-30/50, BULK (101297495) Halliburton Proppant Listed Below Listed Below 0 0 0
Produced Water Operator Base Fluid Water 7732-18-5 100 0.101407 220455
Organic phosphate copolymer 71050-62-9 25 0.0034355 7469
Crystalline silica, cristobalite 14464-46-1 30 0.0774305 168331
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,

branched

127087-87-0 5 0.00001974 43
Sodium Hydroxide 1310-73-2 4 0.000949383 2064
Ammonium Chloride 12125-02-9 1.5 0.000455828 991
Mullite 1302-93-8 100 0.258102 561101
Heavy aromatic petroleum naphtha 64742-94-5 30 0.00011846 258
Fatty acids, tall oil Proprietary 30 0.000116572 254
Propargyl alcohol 107-19-7 10 0.00003886 85
Ethoxylated alcohols Proprietary 30 0.000116572 254
Naphthalene 91-20-3 5 0.00001974 43
Methanol 67-56-1 60 0.000233144 507
Citric acid 77-92-9 60 0.00162509 3533
Ammonium Persulfate 7727-54-0 95 0.00139488 3033
Modified thiourea polymer Proprietary 30 0.000116572 254
Oxyalkylated phenolic resin Proprietary 30 0.000157947 344
Ethanol 64-17-5 60 0.00023692 516
Crystalline silica, quartz 14808-60-7 100 11.5063 25,014,200.0
Dazomet 533-74-4 24 0.0056963 12384
Hydrochloric acid 7647-01-0 15 0.0772428 167922
Aluminum Silicate 1302-76-7 100 0.258102 561101
1,2,4 Trimethylbenzene 95-63-6 1 0.00000395 9
Olefins Proprietary 5 0.00004663 104
Silica, amorphous - fumed 7631-86-9 30 0.0774305 168331
Poly(oxy-1, 2-ethanediyl), a-tridecyl-w-hydroxy,branched 69011-36-5 20 0.00542259 11789
Distillates (petroleum, hydrotreated light) 64742-47-8 18 0.00682558 14840
HP-9601 OneAqua Additive Listed Below Listed Below 0 0 0
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Listed Below Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-07-09 H2O 15 400558 Gal 44530 Halliburton STAGE 1/58

STAGES 2-57 SEE IMAGES

2018-08-01 H2O 15 378238 Gal 447015 Halliburton STAGE 1/58

STAGES 2-57 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ECLIPSE RESOURCES I LP 3608544 0 122
2019 ECLIPSE RESOURCES I LP 1893450 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ECLIPSE RESOURCES I LP Brine 70011 122
2019 ECLIPSE RESOURCES I LP Brine 20851 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1049113402 2018-7-30 0:00: CT No Violations 0.40
-1458360758 2018-7-30 0:00: CT No Violations 0.30
-1547783100 2018-5-17 0:00: CT No Violations 0.20
-1634334566 2018-11-28 0:00 PW No Violations 0.50
-2029298796 2018-2-12 0:00: DD No Violations 1.00
-452684003 2020-8-5 0:00:0 PL No Violations 1.50
-508632166 2019-10-16 0:00 PW No Violations
0191030206 2018-08-16 Completion Testing No Violations Status check inspection found the well drilling and stimulation process complete. A snubbing unit type service rig owned by Deep Well Services is on location and is rigged up on the Yellow Rose A2H drilling out the completion plugs. The said well has had the completion plugs drilled out and is awaiting the initial production flow back operation stages. The well head is equipped with a lower A and upper B section with a production flow cross present above the B section followed by two manually operated FMC 7.0625 diameter master valves. No production tree or flow lines have been installed and none of the 4 wells on the pad have been or will be put into production while completion operations are taking place. Crews are on site installing the perimeter production equipment. All well operations are taking place on polymer containment liner and the well pad earthen berm is serving as the primary containment with the perimeter drain valves in the closed position while work is being done on the wells on the pad. Any surface water that is created through rain fall is being recovered and hauled off.
1036471769 2019-6-18 0:00: PW No Violations 0.30
1044051615 2018-02-05 Casing String Witnessed No Violations On this day, I accompanied ODNR Inspector Austin Gutridge to witness the cementing of the 13.375 inch diameter surface casing. Please reference his comments for a detailed report. Schlumberger pumped 1412 sacks of Class A cement with 1.19 yield, and 5.22 gal/sk. It was displaced with 262 barrels of fresh water and had returns of 50 barrels of cement to surface.
1049113402 2018-07-30 Completion Testing No Violations Status check inspection found Halliburton Pressure pumping service on location and stimulating stage 54 out of 58 total stages to be complete on the said well. Annular pressure monitoring is in place between the 5.5 and 9.625 casing strings with 173 psi currently present during stimulation operations. The initial break pressure was 10,300 pounds per square inch (psi) with an average treating pressure of 10,100 psi at a rate of 85 barrels a minute. The total stage fluid volume is 9,500 barrels of fresh water. Nine Energy wireline perforated the stage between the depths of 11,343 and 11,492 using 4 clusters of 6 shots per foot per cluster. All stimulation and support equipment is situated on polymer containment.
1458360758 2018-07-30 Completion Testing No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please reference his comments for a detailed report. We are onsite witnessing Halliburton, 9 Energy, and S3 Pump Service conducting hydraulic fracturing operations. This particular well is currently on stage 54, of 58 total stages. The plug is set at a measured depth of 11,522 feet. The bottom perforation is set at a depth of 11,492 feet, and the top perforation is set at a depth of 11,343 feet.
1518020862 2018-02-05 Casing String Witnessed No Violations The purpose of my inspection was to witness 1751 feet of 13.375 inch diameter surface casing being cemented into a 17.5 inch diameter open hole. The casing and casing equipment was evaluated on the pipe racks. HP 608 and Wyoming Casing crew ran the 13.375 inch diameter casing in a dry 17.5 inch diameter open hole. Schlumberger pressure tested their lines and pumped 280 barrels of fresh water, 20 barrels of 6% gel, 10 barrels of fresh water, and 300 barrels of class A cement weighing 15.6 pounds per gallon. A cement sampled was pulled and weighed in pressurized scales confirming the weight of 15.6 pounds per gallon. The top plug was dropped and 262 barrels of fresh water were pumped for displacement. Circulation was maintained throughout the job and when cement returned to surface a sample was taken and weighed in pressurized mud scales. The sample of the returns weighed 15.6 pounds per gallon. A calculated total of 50 barrels of cement returned to surface.
1547783100 2018-05-17 Completion Testing No Violations Status check inspection found the well drilling process is complete and the well has the completion well head installed and has also had the 5.5 production string toe prep procedure and final pressure test conducted. The well is awaiting the start of the stimulation process in the next 10 days, Halliburton completion service will mobilize and begin. All completion equipment will be placed on polymer containment. All surface water created on the well pad due to the recent rain events is being removed by the means a vacuum truck. The perimeter drain valves are closed.
1634334566 2018-11-28 Production Wells No Violations Status check inspection found 4 wells are present on the pad and all 4 wells are now in production. The said well is equipped with a lower A and upper B section with annular pressure monitoring in place on both well head sections. No annular pressure was found on this day on the A or B well head section. The well is producing off the 5.5 diameter production casing through (2) 3.5 diameter flow lines with both flow line valves open. The 5.5 casing pressure is 3,142 pounds per square inch (psi) and the flow line pressures are 1,400 and 1,600 psi. There is one manual master 7.0625 completion valve still on the well head B section that the well is being produced through. Each of the (2) flow lines has a separate glycol heater and downstream from the Glycol heater is a contact tower and B-Tex Condenser followed by third party mid stream Eureka Hunter pipeline station point. Also on location is a production fluid facility that consists of (6) 400 barrel production tanks situated inside a polymer lined steel containment dike area. Proper well identification is posted and hazard warning labeling is present at the production facility. Signage is posted at the well pad entry point and the well pad perimeter is protected by an earthen berm.
1907284204 2018-05-17 Completion Testing No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report.
191030206 2018-8-16 0:00: CT No Violations 0.30
2029298796 2018-02-12 Drill / Deepen / Reopen No Violations
2067744530 2020-4-10 0:00: PW No Violations 0.30
588910236 2020-7-16 0:00: PW No Violations 1.50

For data sources see[10]