If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24795 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.74,"lon":-80.98,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Green Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001512 | |
Farm/Lease Name: YELLOW ROSE C | |
License Status: Producing | |
License Date: 2017-11-29 | |
Spud Date: 2018-02-27 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2018-02-25 | |
Well Total Depth: 22250.00 ft | |
Configuration: Horizontal | |
Latitude: 39.740000 | |
Longitude: -80.980000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-10-20 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:10/20/2017, Expired Date:10/20/2019 12:00:00 PM, Drilling unit acres:, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-11-29 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/29/2017, Expired Date:11/29/2019 12:00:00 PM, Drilling unit acres:420.089, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-02-25 | |
Correction to Well | 2018-03-09 | CHANGE TO UNIT SIZE, TAKE-POINT AND TARGET INFORMATION. |
Correction to Well | 2018-03-30 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Completion Report Received | 2018-10-31 | |
Record Last Modified | 2018-11-02 | |
Construction Permit Expires | 2019-11-29 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-11-01 | 10542 | 10692 | 0 |
2018-11-01 | 21943 | 22040 | 0 |
21943 | 22040 | 0 | |
10542 | 10692 | 0 | |
10542 | 10692 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/10/2018 | 08/01/2018 | 10357 | 22,865,200.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | OILPERM A | Halliburton | Non-ionic Surfactant | Listed Below | Listed Below | 0 | 0 | 0 |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.516577 | 1,123,010.0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 87.5193 | 190,262,000.0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
HP-2220 | OneAqua | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
MB-7530 | OneAqua | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
HP-2816 | OneAqua | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
HP-2814 | OneAqua | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
PROP-CERAMIC-30/50, BULK (101297495) | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
Produced Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 0.101407 | 220455 | |
Organic phosphate copolymer | 71050-62-9 | 25 | 0.0034355 | 7469 | ||||
Crystalline silica, cristobalite | 14464-46-1 | 30 | 0.0774305 | 168331 | ||||
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,
branched |
127087-87-0 | 5 | 0.00001974 | 43 | ||||
Sodium Hydroxide | 1310-73-2 | 4 | 0.000949383 | 2064 | ||||
Ammonium Chloride | 12125-02-9 | 1.5 | 0.000455828 | 991 | ||||
Mullite | 1302-93-8 | 100 | 0.258102 | 561101 | ||||
Heavy aromatic petroleum naphtha | 64742-94-5 | 30 | 0.00011846 | 258 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.000116572 | 254 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00003886 | 85 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.000116572 | 254 | ||||
Naphthalene | 91-20-3 | 5 | 0.00001974 | 43 | ||||
Methanol | 67-56-1 | 60 | 0.000233144 | 507 | ||||
Citric acid | 77-92-9 | 60 | 0.00162509 | 3533 | ||||
Ammonium Persulfate | 7727-54-0 | 95 | 0.00139488 | 3033 | ||||
Modified thiourea polymer | Proprietary | 30 | 0.000116572 | 254 | ||||
Oxyalkylated phenolic resin | Proprietary | 30 | 0.000157947 | 344 | ||||
Ethanol | 64-17-5 | 60 | 0.00023692 | 516 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 11.5063 | 25,014,200.0 | ||||
Dazomet | 533-74-4 | 24 | 0.0056963 | 12384 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.0772428 | 167922 | ||||
Aluminum Silicate | 1302-76-7 | 100 | 0.258102 | 561101 | ||||
1,2,4 Trimethylbenzene | 95-63-6 | 1 | 0.00000395 | 9 | ||||
Olefins | Proprietary | 5 | 0.00004663 | 104 | ||||
Silica, amorphous - fumed | 7631-86-9 | 30 | 0.0774305 | 168331 | ||||
Poly(oxy-1, 2-ethanediyl), a-tridecyl-w-hydroxy,branched | 69011-36-5 | 20 | 0.00542259 | 11789 | ||||
Distillates (petroleum, hydrotreated light) | 64742-47-8 | 18 | 0.00682558 | 14840 | ||||
HP-9601 | OneAqua | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-2A | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-07-09 | H2O | 15 | 400558 Gal | 44530 | Halliburton | STAGE 1/58
STAGES 2-57 SEE IMAGES |
2018-08-01 | H2O | 15 | 378238 Gal | 447015 | Halliburton | STAGE 1/58
STAGES 2-57 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ECLIPSE RESOURCES I LP | 3608544 | 0 | 122 |
2019 | ECLIPSE RESOURCES I LP | 1893450 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ECLIPSE RESOURCES I LP | Brine | 70011 | 122 |
2019 | ECLIPSE RESOURCES I LP | Brine | 20851 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1049113402 | 2018-7-30 0:00: | CT | No Violations | 0.40 |
-1458360758 | 2018-7-30 0:00: | CT | No Violations | 0.30 |
-1547783100 | 2018-5-17 0:00: | CT | No Violations | 0.20 |
-1634334566 | 2018-11-28 0:00 | PW | No Violations | 0.50 |
-2029298796 | 2018-2-12 0:00: | DD | No Violations | 1.00 |
-452684003 | 2020-8-5 0:00:0 | PL | No Violations | 1.50 |
-508632166 | 2019-10-16 0:00 | PW | No Violations | |
0191030206 | 2018-08-16 | Completion Testing | No Violations | Status check inspection found the well drilling and stimulation process complete. A snubbing unit type service rig owned by Deep Well Services is on location and is rigged up on the Yellow Rose A2H drilling out the completion plugs. The said well has had the completion plugs drilled out and is awaiting the initial production flow back operation stages. The well head is equipped with a lower A and upper B section with a production flow cross present above the B section followed by two manually operated FMC 7.0625 diameter master valves. No production tree or flow lines have been installed and none of the 4 wells on the pad have been or will be put into production while completion operations are taking place. Crews are on site installing the perimeter production equipment. All well operations are taking place on polymer containment liner and the well pad earthen berm is serving as the primary containment with the perimeter drain valves in the closed position while work is being done on the wells on the pad. Any surface water that is created through rain fall is being recovered and hauled off. |
1036471769 | 2019-6-18 0:00: | PW | No Violations | 0.30 |
1044051615 | 2018-02-05 | Casing String Witnessed | No Violations | On this day, I accompanied ODNR Inspector Austin Gutridge to witness the cementing of the 13.375 inch diameter surface casing. Please reference his comments for a detailed report. Schlumberger pumped 1412 sacks of Class A cement with 1.19 yield, and 5.22 gal/sk. It was displaced with 262 barrels of fresh water and had returns of 50 barrels of cement to surface. |
1049113402 | 2018-07-30 | Completion Testing | No Violations | Status check inspection found Halliburton Pressure pumping service on location and stimulating stage 54 out of 58 total stages to be complete on the said well. Annular pressure monitoring is in place between the 5.5 and 9.625 casing strings with 173 psi currently present during stimulation operations. The initial break pressure was 10,300 pounds per square inch (psi) with an average treating pressure of 10,100 psi at a rate of 85 barrels a minute. The total stage fluid volume is 9,500 barrels of fresh water. Nine Energy wireline perforated the stage between the depths of 11,343 and 11,492 using 4 clusters of 6 shots per foot per cluster. All stimulation and support equipment is situated on polymer containment. |
1458360758 | 2018-07-30 | Completion Testing | No Violations | On this day, I accompanied ODNR Inspector William Stolarik. Please reference his comments for a detailed report. We are onsite witnessing Halliburton, 9 Energy, and S3 Pump Service conducting hydraulic fracturing operations. This particular well is currently on stage 54, of 58 total stages. The plug is set at a measured depth of 11,522 feet. The bottom perforation is set at a depth of 11,492 feet, and the top perforation is set at a depth of 11,343 feet. |
1518020862 | 2018-02-05 | Casing String Witnessed | No Violations | The purpose of my inspection was to witness 1751 feet of 13.375 inch diameter surface casing being cemented into a 17.5 inch diameter open hole. The casing and casing equipment was evaluated on the pipe racks. HP 608 and Wyoming Casing crew ran the 13.375 inch diameter casing in a dry 17.5 inch diameter open hole. Schlumberger pressure tested their lines and pumped 280 barrels of fresh water, 20 barrels of 6% gel, 10 barrels of fresh water, and 300 barrels of class A cement weighing 15.6 pounds per gallon. A cement sampled was pulled and weighed in pressurized scales confirming the weight of 15.6 pounds per gallon. The top plug was dropped and 262 barrels of fresh water were pumped for displacement. Circulation was maintained throughout the job and when cement returned to surface a sample was taken and weighed in pressurized mud scales. The sample of the returns weighed 15.6 pounds per gallon. A calculated total of 50 barrels of cement returned to surface. |
1547783100 | 2018-05-17 | Completion Testing | No Violations | Status check inspection found the well drilling process is complete and the well has the completion well head installed and has also had the 5.5 production string toe prep procedure and final pressure test conducted. The well is awaiting the start of the stimulation process in the next 10 days, Halliburton completion service will mobilize and begin. All completion equipment will be placed on polymer containment. All surface water created on the well pad due to the recent rain events is being removed by the means a vacuum truck. The perimeter drain valves are closed. |
1634334566 | 2018-11-28 | Production Wells | No Violations | Status check inspection found 4 wells are present on the pad and all 4 wells are now in production. The said well is equipped with a lower A and upper B section with annular pressure monitoring in place on both well head sections. No annular pressure was found on this day on the A or B well head section. The well is producing off the 5.5 diameter production casing through (2) 3.5 diameter flow lines with both flow line valves open. The 5.5 casing pressure is 3,142 pounds per square inch (psi) and the flow line pressures are 1,400 and 1,600 psi. There is one manual master 7.0625 completion valve still on the well head B section that the well is being produced through. Each of the (2) flow lines has a separate glycol heater and downstream from the Glycol heater is a contact tower and B-Tex Condenser followed by third party mid stream Eureka Hunter pipeline station point. Also on location is a production fluid facility that consists of (6) 400 barrel production tanks situated inside a polymer lined steel containment dike area. Proper well identification is posted and hazard warning labeling is present at the production facility. Signage is posted at the well pad entry point and the well pad perimeter is protected by an earthen berm. |
1907284204 | 2018-05-17 | Completion Testing | No Violations | On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. |
191030206 | 2018-8-16 0:00: | CT | No Violations | 0.30 |
2029298796 | 2018-02-12 | Drill / Deepen / Reopen | No Violations | |
2067744530 | 2020-4-10 0:00: | PW | No Violations | 0.30 |
588910236 | 2020-7-16 0:00: | PW | No Violations | 1.50 |
For data sources see[10]