If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24727 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.63,"lon":-80.94,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Lee Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001421 | |
Farm/Lease Name: HERRICK EAST | |
License Status: Producing | |
License Date: 2017-02-24 | |
Spud Date: 2017-02-24 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2017-06-30 | |
Well Total Depth: 25956.00 ft | |
Configuration: Horizontal | |
Latitude: 39.630000 | |
Longitude: -80.940000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-02-24 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:2/24/2017, Expired Date:2/24/2019 12:00:00 PM, Drilling unit acres:328.416, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-06-30 | STATUS PER AS-DRILLED PLAT ON FILE-ALE 09/12/2017. |
Correction to Well | 2017-09-12 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Completion Report Received | 2018-02-13 | STATUS PER AS-DRILLED PLAT ON FILE-ALE 09/12/2017. |
Record Last Modified | 2018-02-22 | STATUS PER AS-DRILLED PLAT ON FILE-ALE 09/12/2017. |
Construction Permit Expires | 2019-02-24 | STATUS PER AS-DRILLED PLAT ON FILE-ALE 09/12/2017. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-02-21 | 11329 | 11462 | 36 |
2018-02-21 | 25689 | 25795 | 3 |
25689 | 25795 | 3 | |
11329 | 11462 | 36 | |
11329 | 11462 | 36 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-09-17 | H2O | 15 | 499237 Gal | 452228 | Halliburton | STAGE 1/83
STAGES 2-82 SEE IMAGES |
2017-11-05 | H2O | 15 | 428544 Gal | 451153 | Halliburton | STAGE 83/83
STAGES 2-82 SEE IMAGES |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ECLIPSE RESOURCES I LP | 359024 | 0 | 17 |
2018 | ECLIPSE RESOURCES I LP | 7558778 | 0 | 362 |
2019 | ECLIPSE RESOURCES I LP | 786628 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ECLIPSE RESOURCES I LP | Brine | 13486 | 17 |
2018 | ECLIPSE RESOURCES I LP | Brine | 120355 | 362 |
2019 | ECLIPSE RESOURCES I LP | Brine | 7348 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1088738644 | 2017-2-25 0:00: | CS | No Violations | 5.00 |
-1138577063 | 2020-8-18 0:00: | PW | No Violations | 1.60 |
-241322560 | 2017-10-3 0:00: | CT | No Violations | 0.50 |
0241322560 | 2017-10-03 | Completion Testing | No Violations | On the day of my inspection, I accompanied ODNR Engineer Technician Andrew Thomas. We were on location to examine a fluid release that occurred. Upon inspection, we found Halliburton on location completing the wells and S3 Pump Service running logging tools down hole. Also, we observed cleanup efforts for recent release. It was indicated that flange bolts broke on the high-pressure side of a pumping unit and released flowback fluid on containment and the pad surface. It was stated that the release contained approximately 40 barrels of flowback fluid. Contaminated materials are being dug up and stockpiled, then hauled from location in roll-off bins by Cowboy Industries. The materials will be taken to a facility to be tested. Containment liner beneath the frac trucks was ripped and indicated seepage to the pad surface. Small trenches are being dug to assist in the collection and removal of fluid. More environmental investigation may be needed to assess total impact to the pad surface and sub-surface. Bruce Carpenter was contacted by Andrew Thomas and explained the situation. Bruce said he would contact ODNR when they would do the investigation. |
1088738644 | 2017-02-25 | Casing String Witnessed | No Violations | I was on location to witness Stingray Cementing cement the 24 inch diameter casing into a 30 inch diameter bore hole. Pioneer drilled a 120 foot 30 inch diameter bore hole and set 120 feet of 24 inch diameter casing into the hole. Stingray Cementing ran 15 barrels of fresh water gel ahead of the cement. Stingray Cementing then ran 290 sacks of class A cement, 2% CaCL, and .25 parts per sack of floseal with 62 barrels of fresh water at 15.6 pounds and a yield of 1.2. Stingray Cementing then displaced with 55 barrels of fresh water until we got cement to surface. Stingray Cementing displaced about 15 barrels of cement to surface and finished cementing the casing into the bore hole. |
1496567076 | 2017-06-04 | Casing String Witnessed | No Violations | On site inspection at 3:30 am on 06/04/2017 to witness the surface casing cement job with H&P Drilling rig 608 on location along with Schlumberger Cement Service. Upon arrival it was observed that the rig has drilled a 17.5 diameter surface borehole to a measured depth of 1,950 measured off of a drilling rig Kelly bushing of 27. The rig then ran a total of 1,859 of 13.375 diameter J-55 grade buttress thread casing with a casing guide shoe ran on bottom and a float collar ran at the 1st collar off bottom completing a 46.24 shoe track assembly. Proper casing centralization was demonstrated with a casing centralizer placed every 4th casing collar. The cement company assisted in circulating the last casing joint into the well bore with circulation established at that point prior to cementing. Upon the landing of the last casing joint the cement head was installed with the wiper plug present and the cement job pumped with a 20 barrel 6% gel spacer pumped ahead of the 320 barrel cement mix consisting of 1485 sacks of Class A cement weighing 15.6 pound per gallon with the cement weight verified by weight of scale. The cement was displaced to the float collar with 280 barrels of fresh water with cement returns witnessed to surface at 235 barrels into displacement and the casing pressure tested to 1,325 psi upon the landing of the cement plug at 9:34 am. The final displacement pressure was 804 psi. |
For data sources see[9]