X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24625

Well Details

Well ID: 34-111-24625
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Salem Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001390
Farm/Lease Name: MOSER C
License Status: Producing
License Date: 2016-11-17
Spud Date: 2016-12-18
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2017-01-09
Well Total Depth: 17390.00 ft
Configuration: Horizontal
Latitude: 39.780000
Longitude: -80.880000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-10-30 Proposed Formations:TRENTON, Issued Date:10/30/2015, Expired Date:10/29/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2016-10-12 Proposed Formations:TRENTON, Issued Date:10/12/2016, Expired Date:10/12/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2016-11-16 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:11/16/2016, Expired Date:11/16/2017 12:00:00 PM, Drilling unit acres:697.285, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2016-11-17 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:11/17/2016, Expired Date:11/17/2017 12:00:00 PM, Drilling unit acres:697.285, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2017-01-06 UPDATE ACREAGE REVISED PLAT-ALE
Reached Total Depth 2017-01-09
Correction to Well 2017-03-24 UPDATE TARGET/TAKEPOINT PER AS-DRILLED PLAT-RC
Completion Report Received 2017-07-14
Construction Permit Expires 2017-11-17
Record Last Modified 2018-02-22

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-08-23 11076 11282 36
2017-08-23 17126 17222 36
17126 17222 36
11076 11282 36
11076 11282 36

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 02/21/2017 03/19/2017 10734 12,717,600.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SAND-PREMIUM WHITE-30/50 Halliburton Proppant Listed Below Listed Below 0 0 0
HP-2220 OneAqua Source Scale Inhibitor Listed Below Listed Below 0 0 0
SAND-PRC-30/50, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
SAND-COMMON WHITE-100 MESH Halliburton Proppant Listed Below Listed Below 0 0 0
FDP-S1176-15 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
Produced Water Operator Base Fluid Water 7732-18-5 100 8.54442 10,747,300.0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
HP-2814 OneAqua Source Friction Reducer Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 76.3151 95,990,000.0
OptiKleen-WF(TM) Halliburton Concentrate Listed Below Listed Below 0 0 0
OILPERM A Halliburton Non-ionic Surfactant Listed Below Listed Below 0 0 0
MB-7530 OneAqua Source Biocide Listed Below Listed Below 0 0 0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
Dazomet 533-74-4 24 0.00680255 8557
Mullite 1327-36-2 65 0.00981865 12350
Reaction product of acetophenone,

formaldehyde, thiourea and oleic acid in dimethyl formamide

68527-49-1 30 0.00005656 72
Glutaraldehyde 111-30-8 30 0.000501004 631
Ethanol 64-17-5 60 0.000131643 167
Sodium hydroxide 1310-73-2 4 0.00113376 1427
Organic phosphate copolymer 71050-62-9 25 0.00390057 4907
Distillates (petroleum, hydrotreated light) 64742-47-8 18 0.0102436 12885
9-Octadecenamide, n,n-bis-2(hydroxy-ethyl)-,(Z) 93-83-4 5 0.000232278 293
Ammonium chloride 12125-02-9 5 0.00108591 1367
Neutralized Polyacrylic Emulsion Proprietary 10 0.000114111 144
Phenol / formaldehyde resin 9003-35-4 5 0.0241996 30439
Acetic anhydride 108-24-7 100 0.00112551 1416
Ethylene Glycol 107-21-1 60 0.000684666 862
Fatty acids, tall oil Proprietary 30 0.00005656 72
Sobitan, mono-9-octadececenoate, (Z) 1338-43-8 5 0.000232278 293
Ammonium persulfate 7727-54-0 100 0.00227061 2856
Oxyalkylated phenolic resin Proprietary 30 0.00007663 98
Methanol 67-56-1 60 0.000115449 146
Acetic acid 64-19-7 60 0.000675307 850
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,

branched

127087-87-0 5 0.00000958 13
Phosphoric acid 7664-38-2 0.1 0.00000167 3
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl chlorides

68424-85-1 5 0.00008350 106
1,2,4 Trimethylbenzene 95-63-6 1 0.00000192 3
Naphthalene 91-20-3 5 0.00000958 13
Propargyl alcohol 107-19-7 10 0.00001885 24
Castor oil, ethoxylated 61791-12-6 5 0.000232278 293
Sodium chloride 7647-14-5 5 0.000232278 293
Ethoxylated alcohols Proprietary 30 0.00005656 72
Guar gum 9000-30-0 100 0.00003180 40
Sodium perborate tetrahydrate 10486-00-7 100 0.000502858 633
Crystalline silica, quartz 14808-60-7 100 14.7819 18,592,900.0
Hydrochloric acid 7647-01-0 15 0.03689 46399.5
Hydrotreated light petroleum distillate 64742-47-8 30 0.00139367 1753
Olefins Proprietary 5 0.00002262 30
Polyacrylate Proprietary 30 0.00139367 1753
Hexamethylenetetramine 100-97-0 2 0.00998195 12556
Heavy aromatic petroleum naphtha 64742-94-5 30 0.00005747 73
HP-9601 OneAqua Source Additive Listed Below Listed Below 0 0 0
MC B-8614 Halliburton Biocide Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-40/70 Halliburton Proppant Listed Below Listed Below 0 0 0
SAND-CRC PREMIUM-30/50 Halliburton Proppant Listed Below Listed Below 0 0 0
WG-36 GELLING AGENT Halliburton Gelling Agent Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.250785 315442
FE-1A ACIDIZING COMPOSITION Halliburton Additive Listed Below Listed Below 0 0 0
MC S-2510T Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-03-19 H2O 15 496105 Gal 583500 Halliburton STAGE 31/31

STAGES 2-30 SEE IMAGES

2017-02-21 H2O 15 5755713 Gal 602100 Halliburton STAGE 1/31

STAGES 2-30 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 ECLIPSE RESOURCES I LP 2688165 0 203
2018 ECLIPSE RESOURCES I LP 1549119 0 362
2019 ECLIPSE RESOURCES I LP 214221 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 ECLIPSE RESOURCES I LP Brine 50560 203
2018 ECLIPSE RESOURCES I LP Brine 28565 362
2019 ECLIPSE RESOURCES I LP Brine 3895 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1402361644 2016-12-20 0:00 CS No Violations 5.00
-851152588 2020-4-17 0:00: PW No Violations 0.30
0059858161 2016-11-04 Casing String Witnessed No Violations The purpose of my inspection today is to witness the 120 feet deep 30 inch diameter conductor being cemented into a 36 inch diameter hole. No water was encountered during the drilling process. Stingray Cementing is on location to complete the cement operation. During my inspection Stingray pumped 15 barrels of gel, 10 barrels of water ahead of 82 barrels of Class A cement at 15.6 pounds per gallon and displaced with 87 barrels of water. 25 barrels of cement returns were achieved.
1402361644 2016-12-20 Casing String Witnessed No Violations The purpose of my inspection is to witness the cementing of the 18.625 inch diameter surface/mine string casing into a 24 inch diameter borehole. During my inspection the HP Rig 531, after many attempts, could only get the casing down to 771 feet and could not go any further. The plans now are to lay down the casing and clean out the hole. Cement job will be delayed one more day.
1482829644 2016-12-22 Casing String Witnessed No Violations The purpose of my inspection today is to witness the surface-mine casing string cement job. HP Drilling Rig 531 drilled a 26 inch diameter borehole to a depth of 910 feet. The mine void is from 782 feet to 800 feet in depth. The 18.625 inch diameter casing was run to a depth of 851 feet. Schlumberger is on location to cement this casing string in two stages with a packer set at 604 feet. 300 barrels of fresh water and 20 barrels of gel were pumped ahead of the cement. 83 barrels of Class A cement with 1.5 percent calcium and 234 barrels of displacement were pumped to complete the first stage. The plug landed and the packer was energized. The second stage was completed using 273 barrels of Class A cement with 1.5 percent calcium pumped after circulation to surface was established. 186 barrels of displacement were pumped and circulation was lost temporarily then reestablished. Water returns were established but cement returns did not reach surface. Schlumberger preformed a top off with Class A cement weighing 15.6 pounds per gallon and cement was brought to the base of the cellar.
2145177009 2017-02-23 Completion Testing No Violations At 10:33, I received a call from Eclipse EHS Supervisor Bruce Carpenter who stated that during the frac job 30 barrels of 28% Hydrochloric acid was released onto containment from the belly of a third party truck at 10:25 and Halliburton has neutralized the acid with soda ash and was in the process of cleaning up the residue. Upon arrival at 12:15, I met with Eclipse Consultants Dustin Moore and Mike Hartshorn who stated that only 380 gallons was released onto containment. S3 pumping had stated that all 1257 gallons was released but after strapping the tanker it was revealed that 877 gallons remained inside. Mr. Moore stated that Halliburton went to pull the tractor out from underneath the tanker transport and they unhooked the airlines which deflated the rear airbags forcing a bind on the jack stand. When they moved the tractor the fiberglass line between the manual valve and the air actuated safety valve broke releasing the acid. The air actuated safety valve was shut. The tanker which set on containment was pulled onto a second containment so that the acid could be neutralized with soda ash. Crews onsite began flushing the soda ash and vacuuming it up for disposal. Upon completion of flushing the containment will be pulled up and disposed of and replaced. This will reveal frac primary containment. If frac primary containment is damaged it will also be replaced. The remaining acid on the tanker will be transferred to another tanker prior to the tanker being removed from the location. All acid released was within containment.
59858161 2016-11-4 0:00: CS No Violations 1.00

For data sources see[10]

References