If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24574 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.8,"lon":-80.91,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Switzerland Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001224 | |
Farm/Lease Name: FUCHS A | |
License Status: Producing | |
License Date: 2015-02-27 | |
Spud Date: 2015-03-12 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2015-06-06 | |
Well Total Depth: 21334.00 ft | |
Configuration: Horizontal | |
Latitude: 39.800000 | |
Longitude: -80.910000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-02-27 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:2/27/2015, Expired Date:2/26/2017 12:00:00 PM, Drilling unit acres:493.644, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2015-06-06 | |
Correction to Well | 2015-07-31 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UPDATE TO UNIT SIZE AND LANDOWNER ROYALTY LIST. |
Completion Report Received | 2016-01-27 | |
Construction Permit Expires | 2017-02-26 | |
Record Last Modified | 2018-01-25 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-01-29 | 10895 | 21190 | 0 |
10895 | 21190 | 0 | |
10895 | 21190 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-08-15 | H2O | 0 | 507789 Gal | 306660 | Halliburton | STAGE 1/47
48 SHOTS STAGES 2-46 SEE IMAGES |
2015-02-09 | H2O | 0 | 324927 Gal | 357650 | Halliburton | STAGE 47/47
40 SHOTS |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ECLIPSE RESOURCES I LP | 595843 | 0 | 35 |
2016 | ECLIPSE RESOURCES I LP | 5245159 | 0 | 360 |
2017 | ECLIPSE RESOURCES I LP | 1393788 | 0 | 273 |
2018 | ECLIPSE RESOURCES I LP | 993504 | 0 | 351 |
2019 | ECLIPSE RESOURCES I LP | 171231 | 0 | 78 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ECLIPSE RESOURCES I LP | Brine | 7405 | 35 |
2016 | ECLIPSE RESOURCES I LP | Brine | 41065 | 360 |
2017 | ECLIPSE RESOURCES I LP | Brine | 35825 | 273 |
2018 | ECLIPSE RESOURCES I LP | Brine | 19093 | 351 |
2019 | ECLIPSE RESOURCES I LP | Brine | 2945 | 78 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1769895740 | 2015-3-13 0:00: | CS | No Violations | 4.00 |
-450683720 | 2015-6-4 0:00:0 | DD | No Violations | 2.00 |
0450683720 | 2015-06-04 | Drill / Deepen / Reopen | No Violations | Status check inspection on the well drilling process found H&P Drilling rig 531 on location drilling the 8.750 horizontal well bore section at a total measured depth of 16,661 in the directional azimuth of 147.99 degrees with a well bore deviation of 89.17 degrees using a 12.9# mud weight and projected total depth of 21,700. All well drilling and support equipment is placed on containment and the location primary containment drains are in the closed position during drilling operations. |
0931920551 | 2015-05-21 | Casing String Witnessed | No Violations | |
1080280642 | 2015-11-24 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the area indicated as affected by the well pad construction has been restored with proper erosion control and vegetation in place. Addressing the well head - The drilling and completion process is complete and a production well head tree is in place on the well, on location on this day is Tetra Services providing flow back testing operations. The following permanent production equipment is in place downstream from the well - A sand trap along with a inline heater and fluid separator the gas then flows into the main sales line with 2 -Dehydration units in place on location, the production fluid flows into a tank battery consisting of 6 tanks of 400 barrel fluid capacity which is present inside a polymer lined steel containment dike area which is located at the rear of the well pad. |
1331060211 | 2020-9-10 0:00: | PW | No Violations | 0.50 |
1432256823 | 2015-05-21 | Casing String Witnessed | No Violations | On site inspection to witness the conductor -mine string casing and cement job with the following witnessed. H&P Drilling rig 531 is now on the hole and has drilled a 24surface-mine string borehole to a depth of 857 and ran 805 of 18.625 87.50# J-55 casing with a casing guide shoe ran and a float collar set at 782 along with a DV tool set at 674 and a isolation packer set at 677 and the mine void encountered at a depth of 755 to 765. Schlumberger Cement service is on location to cement the casing using a 260 sack class A 15.6# 1.21 yield mix on the bottom section cemented to isolate the casing shoe and mine void. The top section was cemented by first deploying the isolation packer and then opening the DV tool to gain circulation, the cement job was administered using 1,260 sacks of class A 15.6# 1.21 yield cement with the casing pressure tested to 500 psi upon the landing of the DV tool port closure tool. |
1546707637 | 2020-3-19 0:00: | PW | No Violations | 1.00 |
1566895111 | 2018-02-27 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the affected area of the well site construction meets ORC 1509.07 with vegetation established and erosion control in place. The well pad lease road has signage posted and is gated and locked. The well pad has an 8 chain link fence that is also gated and locked with signage posted at the entrance also. There is also a emergency shut down device at the well pad entrance. On the well pad there is 5 active wells present with annular pressure monitoring in place on each well and the well tender reporting no abnormal pressures recorded or encountered. Each well head is configured with a casing flow cross and (2) outlet valves in place however no casing flow lines are attached. Attached to the tubing heads are (2) manual and (2) remotely controlled emergency shut down valves. Each of the 5 wells on location has proper well identification posted. Also on location is a large natural gas compressor followed by a gas processing unit and 5 gas dehydration units, one supporting each well on the pad. At the far left hand side of the well pad is the production fluid storage area consisting of a total of (6) tanks that are steel construction and situated inside a polymer lined containment area. |
1769895740 | 2015-03-13 | Casing String Witnessed | No Violations | The said well was spudded on 03/12/2015 by Precision Rathole Inc with a 120 x 36 conductor borehole being drilled and 120 of 30 conductor being set. Universal well service is on location to cement the conductor using 509 sacks of class A -3% calcium .125 pps flake 100% open hole excess cement. |
931920551 | 2015-5-21 0:00: | CS | No Violations | 6.00 |
For data sources see[9]