If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-103-24629 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41,"lon":-81.93,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Medina | |
Municipality: Westfield Township | |
Operator Name: MFC DRILLING INC | |
Well Pad ID: | |
Farm/Lease Name: BAKER THOM E& JOYCE | |
License Status: Producing | |
License Date: 1990-12-24 | |
Spud Date: 1991-01-15 | |
Spud Drilling Contractor: TIMAX DRLG | |
Final Drill Date: 1991-04-02 | |
Well Total Depth: 5306.00 ft | |
Configuration: Vertical | |
Latitude: 41.000000 | |
Longitude: -81.930000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1990-12-24 | Issued Date 12/24/90 Expired Date 12/24/91 Acres 0139430 Tool Type CT Proposed Formation CLNN/CPRG Proposed Depth 05306 Proposed Drill Depth 05306 |
Original Spud | 1991-01-15 | CHG. FORM 1-26-91 |
Completed | 1991-04-02 | CHG. FORM 1-26-91 |
Reached Total Depth | 1991-04-02 | CHG. FORM 1-26-91 |
CO | 1991-05-05 | 3059 MFC DRILLING INC GeoDate 12/24/90 |
Construction Permit Expires | 1991-12-24 | CHG. FORM 1-26-91 |
Completion Report Received | 1992-02-24 | CHG. FORM 1-26-91 |
Record Last Modified | 2017-02-15 | CHG. FORM 1-26-91 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 0 | 15 | |
5272 | 0 | ||
1997-06-29 | 5272 | 0 | |
0 | 15 | ||
0 | 15 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 | ACIDIZED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | MFC DRILLING INC | 1742.00 | 7670.00 | 365 |
1992 | MFC DRILLING INC | 1796.00 | 6174.00 | 350 |
1993 | MFC DRILLING INC | 1386.00 | 4271.00 | 365 |
1994 | MFC DRILLING INC | 1251.00 | 3513.00 | 365 |
1995 | MFC DRILLING INC | 1318.00 | 3787.00 | 365 |
1996 | MFC DRILLING INC | 1047.00 | 3418.00 | 365 |
1997 | MFC DRILLING INC | 1043.00 | 3127.00 | 365 |
1998 | MFC DRILLING INC | 927.00 | 2632.00 | 365 |
1999 | MFC DRILLING INC | 1190.00 | 3334.00 | 365 |
2000 | MFC DRILLING INC | 992.00 | 2678.00 | 365 |
2001 | MFC DRILLING INC | 566.00 | 0.00 | 365 |
2002 | MFC DRILLING INC | 592.00 | 1802.00 | 365 |
2003 | MFC DRILLING INC | 594.00 | 1661.00 | 365 |
2004 | MFC DRILLING INC | 555.00 | 1640.00 | 365 |
2005 | MFC DRILLING INC | 394.00 | 1242.00 | 365 |
2006 | MFC DRILLING INC | 532.00 | 1164.00 | 365 |
2007 | MFC DRILLING INC | 477.00 | 1473.00 | 365 |
2008 | MFC DRILLING INC | 566.00 | 1494.00 | 365 |
2009 | MFC DRILLING INC | 467.00 | 1015.00 | 365 |
2010 | MFC DRILLING INC | 546.00 | 0.00 | 365 |
2011 | MFC DRILLING INC | 668.00 | 0.00 | 365 |
2012 | MFC DRILLING INC | 618.00 | 1076.00 | 366 |
2013 | MFC DRILLING INC | 543.00 | 466.00 | 365 |
2014 | MFC DRILLING INC | 461.00 | 325.00 | 365 |
2015 | MFC DRILLING INC | 651.00 | 735.00 | 365 |
2016 | MFC DRILLING INC | 647.00 | 619.00 | 365 |
2017 | MFC DRILLING INC | 517.00 | 211.00 | 365 |
2018 | MFC DRILLING INC | 460.00 | 449.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | MFC DRILLING INC | Brine | 520 | 365 |
1992 | MFC DRILLING INC | Brine | 0 | 350 |
1993 | MFC DRILLING INC | Brine | 153 | 365 |
1994 | MFC DRILLING INC | Brine | 187 | 365 |
1995 | MFC DRILLING INC | Brine | 438 | 365 |
1996 | MFC DRILLING INC | Brine | 475 | 365 |
1997 | MFC DRILLING INC | Brine | 519 | 365 |
1998 | MFC DRILLING INC | Brine | 633 | 365 |
1999 | MFC DRILLING INC | Brine | 931 | 365 |
2000 | MFC DRILLING INC | Brine | 923 | 365 |
2001 | MFC DRILLING INC | Brine | 838 | 365 |
2002 | MFC DRILLING INC | Brine | 814 | 365 |
2003 | MFC DRILLING INC | Brine | 855 | 365 |
2004 | MFC DRILLING INC | Brine | 876 | 365 |
2005 | MFC DRILLING INC | Brine | 853 | 365 |
2006 | MFC DRILLING INC | Brine | 989 | 365 |
2007 | MFC DRILLING INC | Brine | 925 | 365 |
2008 | MFC DRILLING INC | Brine | 871 | 365 |
2009 | MFC DRILLING INC | Brine | 660 | 365 |
2010 | MFC DRILLING INC | Brine | 773 | 365 |
2011 | MFC DRILLING INC | Brine | 725 | 365 |
2012 | MFC DRILLING INC | Brine | 645 | 366 |
2013 | MFC DRILLING INC | Brine | 571 | 365 |
2014 | MFC DRILLING INC | Brine | 560 | 365 |
2015 | MFC DRILLING INC | Brine | 525 | 365 |
2016 | MFC DRILLING INC | Brine | 488 | 365 |
2017 | MFC DRILLING INC | Brine | 290 | 365 |
2018 | MFC DRILLING INC | Brine | 491 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000016823 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 9/3/91 INSPECTOR HAROLD MORAVY DATE 09/0319/91 DATA FROM OLD VAX INFO | |
1073659715 | 2004-01-09 | Production Wells | No Violations | Well in compliance. Snow, 20 degrees. |
1192173830 | 2014-09-05 | Production Wells | No Violations | Inspected production well on 09/05/2014. The tank battery consists of 2-210 bbl steel tanks, 1-100 bbl steel tank, 1-1,700 gal plastic tank, 1-1,300 gal plastic tank, 1-vertical separator, drip, and meter assembly within an earthen dike. The diked area is located within an unlocked electric fence (not hooked-up). Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor and was pumping at the time of the inspection. No problems were noted at the time of the inspection. |
16823 | PL | No Violations |
For data sources see[9]