X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-099-22495

Well Details

Well ID: 34-099-22495
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Boardman Township
Operator Name: EVERFLOW EASTERN PARTNERS LP
Well Pad ID:
Farm/Lease Name: DUNDICS UNIT
License Status: Producing
License Date: 1991-11-25
Spud Date: 1991-09-01
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]]
Final Drill Date: 1991-09-11
Well Total Depth: 6010.00 ft
Configuration: Directional
Latitude: 41.020000
Longitude: -80.670000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1991-07-26 84 EVERFLOW EASTERN PTNS L P GeoDate 7/26/91
Oil and Gas 1991-07-26 Issued Date 7/26/91 Expired Date 7/25/92 Acres 0087480 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 06010 Proposed Drill Depth 06010
Original Spud 1991-09-01 REVISE UNIT 11-30-91, CORR. IN FTG, ACR, ELV. X&Y 9-19-92
Completed 1991-09-11 REVISE UNIT 11-30-91, CORR. IN FTG, ACR, ELV. X&Y 9-19-92
Reached Total Depth 1991-09-11 REVISE UNIT 11-30-91, CORR. IN FTG, ACR, ELV. X&Y 9-19-92
Completion Report Received 1991-10-07 REVISE UNIT 11-30-91, CORR. IN FTG, ACR, ELV. X&Y 9-19-92
CO 1991-11-25 84 EVERFLOW EASTERN PTNS L P GeoDate 11/25/91
Oil and Gas 1991-11-25 Issued Date 11/25/91 Expired Date 11/24/92 Acres 0087550 Tool Type RTAF Proposed Formation CLINTON Proposed Depth Proposed Drill Depth
Construction Permit Expires 1992-11-24 REVISE UNIT 11-30-91, CORR. IN FTG, ACR, ELV. X&Y 9-19-92
Record Last Modified 2017-02-15 REVISE UNIT 11-30-91, CORR. IN FTG, ACR, ELV. X&Y 9-19-92

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 5711 5807 0
5711 5807 0
2006-09-11 5712 5788 50
5712 5788 50
5711 5807 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 119000 Gal 80000 FRAC W/119M GAL H20 & 800 SX SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1992 EVERFLOW EASTERN PARTNERS LP 30185.00 0.00 365
1993 EVERFLOW EASTERN PARTNERS LP 27889.00 166.00 365
1994 EVERFLOW EASTERN PARTNERS LP 16033.00 31.00 365
1995 EVERFLOW EASTERN PARTNERS LP 15476.00 17.00 365
1996 EVERFLOW EASTERN PARTNERS LP 11707.00 18.00 365
1997 EVERFLOW EASTERN PARTNERS LP 9522.00 17.00 365
1998 EVERFLOW EASTERN PARTNERS LP 8287.00 0.00 365
1999 EVERFLOW EASTERN PARTNERS LP 16837.00 51.00 365
2000 EVERFLOW EASTERN PARTNERS LP 15789.00 25.00 365
2001 EVERFLOW EASTERN PARTNERS LP 7202.00 13.00 365
2002 EVERFLOW EASTERN PARTNERS LP 7360.00 0.00 365
2003 EVERFLOW EASTERN PARTNERS LP 8398.00 17.00 365
2004 EVERFLOW EASTERN PARTNERS LP 7153.00 0.00 365
2005 EVERFLOW EASTERN PARTNERS LP 5492.00 0.00 365
2006 EVERFLOW EASTERN PARTNERS LP 5210.00 11.00 365
2007 EVERFLOW EASTERN PARTNERS LP 2264.00 0.00 365
2008 EVERFLOW EASTERN PARTNERS LP 4055.00 0.00 365
2009 EVERFLOW EASTERN PARTNERS LP 3661.00 0.00 365
2010 EVERFLOW EASTERN PARTNERS LP 2624.00 0.00 365
2011 EVERFLOW EASTERN PARTNERS LP 1770.00 0.00 197
2012 EVERFLOW EASTERN PARTNERS LP 2000.00 0.00 306
2013 EVERFLOW EASTERN PARTNERS LP 5632.00 3.00 365
2014 EVERFLOW EASTERN PARTNERS LP 4388.00 0.00 365
2015 EVERFLOW EASTERN PARTNERS LP 3870.00 0.00 365
2016 EVERFLOW EASTERN PARTNERS LP 451.00 0.00 365
2017 EVERFLOW EASTERN PARTNERS LP 2418.00 0.00 365
2018 EVERFLOW EASTERN PARTNERS LP 2046.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1992 EVERFLOW EASTERN PARTNERS LP Brine 79 365
1993 EVERFLOW EASTERN PARTNERS LP Brine 31 365
1994 EVERFLOW EASTERN PARTNERS LP Brine 66 365
1995 EVERFLOW EASTERN PARTNERS LP Brine 75 365
1996 EVERFLOW EASTERN PARTNERS LP Brine 8 365
1997 EVERFLOW EASTERN PARTNERS LP Brine 8 365
1998 EVERFLOW EASTERN PARTNERS LP Brine 14 365
1999 EVERFLOW EASTERN PARTNERS LP Brine 4 365
2000 EVERFLOW EASTERN PARTNERS LP Brine 28 365
2001 EVERFLOW EASTERN PARTNERS LP Brine 8 365
2002 EVERFLOW EASTERN PARTNERS LP Brine 12 365
2003 EVERFLOW EASTERN PARTNERS LP Brine 18 365
2004 EVERFLOW EASTERN PARTNERS LP Brine 14 365
2005 EVERFLOW EASTERN PARTNERS LP Brine 17 365
2006 EVERFLOW EASTERN PARTNERS LP Brine 10 365
2007 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2008 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2009 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2010 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2011 EVERFLOW EASTERN PARTNERS LP Brine 0 197
2012 EVERFLOW EASTERN PARTNERS LP Brine 0 306
2013 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2014 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2015 EVERFLOW EASTERN PARTNERS LP Brine 13 365
2016 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2017 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2018 EVERFLOW EASTERN PARTNERS LP Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1542028820 2004-5-26 0:00: PW No Violations 0.50
-1877096764 2017-12-13 0:00 PW No Violations 0.50
0000011960 Preliminary Restoration No Violations PASSED Y WITNESSED 7/20/92 INSPECTOR BRETT FARNSWORTH DATE 07/2019/92 DATA FROM OLD VAX INFO
11960 PL No Violations
1245263653 2009-06-17 Production Wells No Violations I walked around the tank battery and the wellhead and found that there were no violations at this time.
1542028820 2004-05-26 Production Wells No Violations The tank battery is shared with permits: 2494, and 2627 and consists of 1-100 bbl storage tank, 2-separators a dike and a fence.
1877096764 2017-12-13 Production Wells No Violations The purpose of my inspection was to conduct a status check on well #2-2495. Inspector John Fleming was present during the inspection. A review of RBDMS indicated production reporting was current. Access to the well was through a residential yard. The well head and tank battery were enclosed by a locked chain-link fence enclosure. Correct identification was present. The 8.625 well head was above grade and plumbed into the flow line. The connection valve was closed at the time of inspection. The 4.5 production casing was equipped with a plunger lift assembly. Production valves were in the closed position. No leaks were observed. The tank battery was shared with #2-2627 and #2-2494. All equipment was within a locked chain-link fence enclosure obscured by landscaping. Correct identification was present. A stable earthen dike that was free of fluid was present around the equipment. Equipment within the dike consisted of two (2) horizontal separators and one (1) 100 bbl production tank. The separators remained in good repair. The production tank remained in good repair. Valves were closed and plugged. A domestic supply connection was present. No violations were observed during this inspection.

For data sources see[9]

References