X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-089-25876

Well Details

Well ID: 34-089-25876
Loading map...
Country: United States
State: Ohio
County: Licking
Municipality: McKean Township
Operator Name: NORTHWOOD ENERGY CORP
Well Pad ID:
Farm/Lease Name: SRBA CRAIG
License Status: Producing
License Date: 2007-09-19
Spud Date: 2007-09-19
Spud Drilling Contractor: KR DRILLING
Final Drill Date: 2007-09-21
Well Total Depth: 2361.00 ft
Configuration: Vertical
Latitude: 40.160000
Longitude: -82.500000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2007-09-14 Proposed Formations:CLINTON, Issued Date:9/14/2007, Expired Date:9/13/2008 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2007-09-19 Proposed Formations:CLINTON, Issued Date:9/19/2007, Expired Date:9/18/2008 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Completed 2007-09-21
Reached Total Depth 2007-09-21
First Injection 2007-10-19
Completion Report Received 2007-11-28
Construction Permit Expires 2008-09-18
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-02-26 2302 2314 21
2302 2314 21
2302 2314 21

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 60000 Gal 40000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2007 HOPEWELL OIL & GAS DEVELOPMENT 0.00 0.00 0
2008 HOPEWELL OIL & GAS DEVELOPMENT 3913.00 0.00 365
2009 HOPEWELL OIL & GAS DEVELOPMENT 6301.00 0.00 365
2010 HOPEWELL OIL & GAS DEVELOPMENT 5414.00 0.00 0
2011 HOPEWELL OIL & GAS DEVELOPMENT 4490.00 0.00 0
2012 HOPEWELL OIL & GAS DEVELOPMENT 4628.00 0.00 366
2013 HOPEWELL OIL & GAS DEVELOPMENT 4465.00 0.00 365
2014 HOPEWELL OIL & GAS DEVELOPMENT 2445.00 0.00 365
2015 HOPEWELL OIL & GAS DEVELOPMENT 1499.00 0.00 365
2016 HOPEWELL OIL & GAS DEVELOPMENT 113.00 0.00 60
2017 HOPEWELL OIL & GAS DEVELOPMENT 0.00 0.00 0
2018 HOPEWELL OIL & GAS DEVELOPMENT 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2007 HOPEWELL OIL & GAS DEVELOPMENT Brine
2008 HOPEWELL OIL & GAS DEVELOPMENT Brine 345 365
2009 HOPEWELL OIL & GAS DEVELOPMENT Brine 30 365
2010 HOPEWELL OIL & GAS DEVELOPMENT Brine 30 0
2011 HOPEWELL OIL & GAS DEVELOPMENT Brine 0
2012 HOPEWELL OIL & GAS DEVELOPMENT Brine 50 366
2013 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
2014 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
2015 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 365
2016 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 60
2017 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 0
2018 HOPEWELL OIL & GAS DEVELOPMENT Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-248939433 2016-3-2 0:00:0 PW No Violations
0248939433 2016-03-02 Production Wells No Violations Inspection conducted as a status check. The well was equipped with a pumping unit and motor. It was not pumping. Identification was observed at the well. The tank battery consists of (1) 100 barrel tank, separator, drip, and meter inside an earthen dike. Identification was posted on the tank. A second set of equipment was observed in the same dike for the Srba #2 and Srba #3. No violations. Time of inspection: 3:00 PM. Weather: 27*F, Partly cloudy
0692914258 2011-08-08 Preliminary Restoration No Violations An inspection revealed that the Preliminary Restoration meets ORC 1509.072. A GPS reading was obtained for the well and tank location. The well was equipped and showed signs of production. The tank battery location consisted of (1) 100bbl tank w/no knockout, (1) separator, (1) drip and (1) meter. A second set of equipment inside the earthen dike for the SRBA #2 and #3.
1191943077 2007-10-03 Drill / Deepen / Reopen No Violations I stopped by location today to pick up cement ticket from surface job. I was unable to access the lease road due to a locked gate and was therefore unable to visit the well location.
692914258 2011-8-8 0:00:0 PL No Violations 0.50

For data sources see[9]

References