If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21285 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.31,"lon":-81.08,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Stock Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-000887 | |
Farm/Lease Name: MADZIA UNIT | |
License Status: Producing | |
License Date: 2016-04-19 | |
Spud Date: 2014-03-04 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2014-08-18 | |
Well Total Depth: 14437.00 ft | |
Configuration: Horizontal | |
Latitude: 40.310000 | |
Longitude: -81.080000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-01-30 | Proposed Formations:POINT PLEASANT, Issued Date:1/30/2014, Expired Date:1/30/2016 12:00:00 PM, Drilling unit acres:631.314, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2014-02-19 | Proposed Formations:POINT PLEASANT, Issued Date:2/19/2014, Expired Date:2/19/2016 12:00:00 PM, Drilling unit acres:631.314, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-08-18 | |
APP | 2016-04-19 | Proposed Formations:POINT PLEASANT, Issued Date:4/19/2016, Expired Date:4/19/2018 12:00:00 PM, Drilling unit acres:631.314, Proposed Well Type:OG, Proposed Well Class:TI |
Completion Report Received | 2016-12-27 | |
Construction Permit Expires | 2017-04-19 | |
Record Last Modified | 2017-10-23 | |
Correction to Well | 2105-12-11 | UPDATE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORIDNATES) FROM AS DRILLED SURVEY PLAT. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-12-27 | 8415 | 14250 | 0 |
8415 | 14250 | 0 | |
8415 | 14250 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 08/11/2016 | 08/26/2016 | 8167 | 11,134,400.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 |
MURIATIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 86.4967 | 92,749,400.0 | |
SAND-COMMON WHITE-100 MESH, SSA-2 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
Hydrochloric acid | 7647-01-0 | 15 | 0.129995 | 139392 | ||||
Glycerine | 56-81-5 | 5 | 0.00003824 | 41 | ||||
Ethylene oxide | 75-21-8 | 0.01 | 0.00000093 | 1 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.00320902 | 3441 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00003824 | 41 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.000199573 | 214 | ||||
Olefins | Proprietary | 5 | 0.00008207 | 88 | ||||
Acetic acid | 64-19-7 | 60 | 0.00192672 | 2066 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00006715 | 72 | ||||
Methanol | 67-56-1 | 60 | 0.000398214 | 427 | ||||
Alcohols, C12-13, ethoxylated | 66455-14-9 | 30 | 0.000231281 | 248 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 12.632 | 13,545,200.0 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.000199573 | 214 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.000199573 | 214 | ||||
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 8.68246 | 9,310,110.0 | |
SAND-PREMIUM WHITE-40/70 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
FDP-S1225-15 | Halliburton | Surfactant | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-08-11 | H2O | 15 | 265569 Gal | 282038 | Halliburton | STAGE 1/56
42 SHOTS STAGES 2-55 SEE IMAGES |
2016-08-26 | H2O | 15 | 207925 Gal | 271323 | Halliburton | STAGE 56/56
36 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ECLIPSE RESOURCES I LP | 201326 | 34717 | 90 |
2017 | ECLIPSE RESOURCES I LP | 857123 | 64062 | 364 |
2018 | ECLIPSE RESOURCES I LP | 464764 | 9076 | 362 |
2019 | ECLIPSE RESOURCES I LP | 83948 | 1140 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ECLIPSE RESOURCES I LP | Brine | 10836 | 90 |
2017 | ECLIPSE RESOURCES I LP | Brine | 17564 | 364 |
2018 | ECLIPSE RESOURCES I LP | Brine | 7343 | 362 |
2019 | ECLIPSE RESOURCES I LP | Brine | 1286 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-135510063 | 2016-8-10 0:00: | DD | No Violations | 2.00 |
-1936437563 | 2014-5-11 0:00: | DD | No Violations | |
-9080844 | 2016-12-15 0:00 | PL | No Violations | 0.50 |
-959682988 | 2019-12-17 0:00 | PW | No Violations | 1.00 |
0009080844 | 2016-12-15 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed the lease road in good repair and the gates to access the location were locked. With my arrival on location I witnesses I witnessed all wells on site are now in producing order. The permitted well bore is utilizing natural reservoir pressure for means of production. The production equipment that is on site consists of the following:
2- 500 barrel production tanks 7- Permitted well bores utilizing natural reservoir pressure 7- Gas production units equipped with internal heaters and sand separators 1- Low pressure separator system The site passed preliminary restoration in accordance with ORC 1509.072 A. |
0135510063 | 2016-08-10 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Haliburton in the process of rigging up the fracking equipment. Spoke to a truck driver while on site and he informed me that they plan to start fracking later that night or by early morning. |
0644396216 | 2018-10-18 | Production Wells | No Violations | |
1394144758 | 2014-03-06 | Casing String Witnessed | No Violations | I am on site tonight to witness the running and the cementing of the 24 inch diameter casing string. Butchs Rat hole service drilled a 30 inch diameter hole to 105 ft and set 105 ft of casing. Halliburton Energy c/w 290 sks of class A @ 15.6 lb and 1.22 yield. 20 bbls of cement cirulated to surface. The job did not go off as scheduled because another Company Man was rotated in and he was late to the site. |
1407775775 | 2014-08-11 | Drill / Deepen / Reopen | No Violations | On the date of inspection I witnessed that the Nomac 245 rig was drilling ahead at a depth of 6480 feet at the time of my inspection. Company man on site was Ryan Bartholomew. |
1749115721 | 2014-03-05 | Casing String Witnessed | No Violations | I am on site to witness the running and the cementing of the 24 inch diameter casing string. Butchs Rat Hole Service drilled a 30 inch diameter hole to 105 ft and set 105 ft of casing. During the cement job it was determined that cement returns were too soon and that there was a hole in the casing. The cement was circulated out and the casing was pulled. The casing will be replaced and the job will not be done today. |
1936437563 | 2014-05-11 | Drill / Deepen / Reopen | No Violations | Arrived on location and found crew running 9 5/8 casing for intermediate string. 1740 feet of casing was run and being cemented by Halliburton Energy Services. |
54926047 | 2020-9-30 0:00: | PW | No Violations | 0.20 |
644396216 | 2018-10-18 0:00 | PW | No Violations | 1.00 |
For data sources see[10]