34-059-24512

Well Details

Well ID: 34-059-24512
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Millwood Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001495
Farm/Lease Name: MERCURY C
License Status: Producing
License Date: 2017-08-15
Spud Date: 2017-08-15
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2017-11-01
Well Total Depth: 28586.00 ft
Configuration: Horizontal
Latitude: 39.980000
Longitude: -81.280000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-08-15 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:8/15/2017, Expired Date:8/15/2019 12:00:00 PM, Drilling unit acres:415.562, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-11-01
Correction to Well 2017-12-29 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2018-07-09
Record Last Modified 2018-07-13
Construction Permit Expires 2019-08-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-07-12 9041 9166 0
2018-07-12 28284 28433 0
28284 28433 0
9041 9166 0
9041 9166 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/23/2018 02/23/2018 7766 34,157,800.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HP-2814 One Aqua Friction Reducer Listed Below Listed Below 0 0 0
SAND-COMMON WHITE - 100 MESH, 3307 LB BAG Halliburton Proppant Listed Below Listed Below 0 0 0
MB-7530 One Aqua Biocide Listed Below Listed Below 0 0 0
HP-2220 One Aqua Scale Inhibitor Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 88.3398 279,677,000.0
HP-9601 One Aqua Additive Listed Below Listed Below 0 0 0
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
OILPERM A Halliburton Non-ionic Surfactant Listed Below Listed Below 0 0 0
Produced Water Operator Base Fluid Water 7732-18-5 100 1.65722 5,246,620.0
SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
Distillates (petroleum, hydrotreated light) 64742-47-8 18 0.0168095 53218
Ammonium Persulfate 7727-54-0 95 0.00196486 6221
Reaction product of acetophenone,

formaldehyde, thiourea and oleic acid in dimethyl formamide

68527-49-1 30 0.000842597 2668
Fatty acids, tall oil Proprietary 30 0.000842597 2668
Naphthalene 91-20-3 5 0.00002854 91
Organic phosphate copolymer 71050-62-9 25 0.00312305 9888
Ethoxylated alcohols Proprietary 30 0.000842597 2668
Ethanol 64-17-5 60 0.000342497 1085
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,

branched

127087-87-0 5 0.00002854 91
Sodium hydroxide 1310-73-2 4 0.000974991 3087
Hydrochloric acid 7647-01-0 15 0.046527 147300
Propargyl alcohol 107-19-7 10 0.000280866 890
Citric acid 77-92-9 60 0.000469853 1488
Crystalline silica, quartz 14808-60-7 100 9.55635 30,254,700.0
Olefins Proprietary 5 0.000337039 1068
Ammonium chloride 12125-02-9 1.5 0.00140079 4435
Heavy aromatic petroleum naphtha 64742-94-5 30 0.000171248 543
Dazomet 533-74-4 24 0.00584994 18521
1,2,4 Trimethylbenzene 95-63-6 1 0.00000571 19
Oxyalkylated phenolic resin Proprietary 30 0.000228331 724
Methanol 67-56-1 60 0.00168519 5336
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.310648 983488

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-02-14 H2O 0 274009 Gal 255560 Halliburton Stage 82 of 118. 32 total perforations from 15085 feet to 14962 feet
2018-02-23 H2O 15 254447 Gal 254130 Halliburton STAGE 118/118

STAGES 2-117 SEE IMAGES

2018-01-23 H2O 15 291343 Gal 256830 Halliburton STAGE 1/118

STAGES 2-117 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ECLIPSE RESOURCES I LP 1997784 267067 228
2019 ECLIPSE RESOURCES I LP 567955 47834 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ECLIPSE RESOURCES I LP Brine 39561 228
2019 ECLIPSE RESOURCES I LP Brine 7297 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1283106806 2018-10-16 0:00 PL No Violations 0.20
-1725682211 2018-7-19 0:00: PL No Violations 0.20
-1740774288 2018-8-7 0:00:0 PL No Violations 0.20
-1838615820 2017-8-16 0:00: CS No Violations 4.00
0052131260 2017-10-23 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that H&P Flex Rig #531had drilled to the depth of 17732 feet and was down due to the rotating link adapter failing on their Varco TDS-11SA Top Drive. H&P Flex Rig #531 was circulating the wellbore while waiting on the replacement parts. Upon receipt necessary repairs will be made with drilling continued to a planned total depth of 28700 feet. I completed walk around with Eclipse Consultant Jack Turner.
0653238902 2018-02-14 Completion Testing No Violations
1137270886 2020-7-30 0:00: PW No Violations 1.00
1192684185 2017-11-14 Drill / Deepen / Reopen No Violations On the day of my inspection accompanied by ODNR Hydrologist Rick Trippel, ODNR Engineers: Eric Kletrovetz and Luke Saunders, I witnessed Nine Wireline was onsite performing a cement bond log on the 5.5 inch diameter production casing. We met with Eclipse Consultant Dustin Moore and reviewed the log along with the upcoming frac schedule for the well pad. Grady Rentals was also onsite laying down new containment for the upcoming frac.
1283106806 2018-10-16 Preliminary Restoration No Violations The purpose of my inspection was a status check on a preliminary restoration. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of three 400-barrel tanks on the West side of the pad, eight horizontal line heaters, eight sand traps, and eight gas production units all on the South side of the pad. The pipe line tie in was located on the North side of the pad. Location meets requirements for preliminary restoration.
1507861505 2017-10-12 Casing String Witnessed No Violations On the day of my inspection I witnessed that H&P Flex Rig #531 had drilled a 17.5 inch diameter hole to the depth of 1338 feet. Wyoming Casing Crew ran 226.5 feet of 13.375 inch 61 pound per foot J-55 casing and 1061.67 feet of 13.375 inch 54.5#/ft. J-
1684823868 2019-03-27 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of three 400-barrel tanks on the West side of the pad, eight horizontal line heaters, eight sand traps, and eight gas production units all on the South side of the pad. The pipe line tie in was located on the North side of the pad. On the west side of the pad the top of the high wall on the cut slope was eroded toppling material sedimentation down near the tank battery. Mark Atkinson with ODNR Engineering was aware of the issue and he has been in contact with Eclipse Resources.
1725682211 2018-07-19 Preliminary Restoration No Violations The purpose of my inspection was a status check on a preliminary restoration. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Pressure gauges for all casing strings were present and in plain view with a casing identification tag. The production equipment consisted of three 400-barrel tanks on the West side of the pad, eight horizontal line heaters, eight sand traps, and eight gas production units all on the South side of the pad. The pipe line tie in was located on the North side of the pad. Eight 500-barrel Frac tanks are located on the West side of the pad. Due to signs of erosion on the cut slope on the West side of the pad the location does not meet Preliminary restoration requirements written under ORC 1509.072 (A). I will consult ODNR Engineering section and discuss the cut slope erosion.
1740774288 2018-08-07 Preliminary Restoration No Violations The purpose of my inspection was a status check on a preliminary restoration. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Pressure gauges for all casing strings were present and in plain view with a casing identification tag. The production equipment consisted of three 400-barrel tanks on the West side of the pad, eight horizontal line heaters, eight sand traps, and eight gas production units all on the South side of the pad. The pipe line tie in was located on the North side of the pad. Three 500-barrel Frac tanks are located on the West side of the pad. Signs of erosion remain on the cut slope on the West side of the pad. I spoke with Mark Atkinson with the ODNR Engineering Section and he stated that they would investigate the situation.
1838615820 2017-08-16 Casing String Witnessed No Violations On the day inspection I witnessed that Precision Rathole had drilled a 30 inch diameter hole to the depth of 116 feet, hitting water at 17 feet and ran 120 feet of 24 inch diameter 94.62 pounds per foot conductor pipe with a 4 foot stick up. Stingray Pressure Pumping was onsite and pumped 10 barrels of fresh water, performed a 400 pounds per square inch pressure test and cemented pipe with 290 sacks Class A cement with 2% CaCl and .25 pound per sack of Celluseal weighing 15.6 pounds per gallon and a yield of 1.21 cubic foot per sack. Cement was weight was verified with pressurized mud scales and displaced to 106 feet with 57.75 barrels of fresh water with good cement returns of 17 barrels to surface. Mix water was tested revealing chlorides of 46 parts per million, pH 7 and 65 degrees.
489176053 2019-11-27 0:00 PW No Violations 0.30
52131260 2017-10-23 0:00 DD No Violations 2.00
653238902 2018-2-14 0:00: CT No Violations 4.00

For data sources see[10]